What the public permit record shows, not self-reported reviews.
Is DOLAN MECHANICAL INC a real contractor?
DOLAN MECHANICAL INC appears in public building-permit records with 92 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is DOLAN MECHANICAL INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to DOLAN MECHANICAL INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is DOLAN MECHANICAL INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. DOLAN MECHANICAL INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is DOLAN MECHANICAL INC's work?
The most recent permit on record for DOLAN MECHANICAL INC is dated 2026-03-16, with 92 permits on file in total.
FOR THE INSTALLATION OF APPLIANCES WITH ASSOCIATED DUCTWORK AND FOR APPLIANCES NOT CONNECTED VIA DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.City of Philadelphia · 2026
FOR TA MECHANICAL SYSTEM UPGRADE TO AN EXISTING STRUCTURE. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. **ALL WORK TO BE DONE PER APPROVED PLANS. **IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **City of Philadelphia · 2026
TO REPLACE TWO (2) EXHAUST FANS AND EIGHT (8) GRAVITY VENTILATORS PER APPROVED PLANS.City of Philadelphia · 2026
NEW CONSTRUCTION OF AN ADITION TO SCHOOL. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS TO BE METALLIC TO ROOF EXTENSION. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE PERFORMED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS.City of Philadelphia · 2025
INSTALLATION OF NEW FIXTURES WITH PIPING AND DIRECT FIXTURE REPLACEMENT WITHOUT PIPING. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL MATERIALS PROVIDED SHALL BE METALLIC. ALL WORK TO BE PERFORMED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS.City of Philadelphia · 2025
FOR THE INSTALLATION OF VRF SYSTEM, HVAC PUMPS, BOILER, SPLIT SYSTEMS, ROOFTOP UNITS, GRDs, EX. FANS, UNIT HEATERS, ASSOCIATED MECHANICAL PIPING INCLUDING GAS PIPE AS PER APPROVED PLANS.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you DOLAN MECHANICAL INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to DOLAN MECHANICAL INC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2025
FOR INSTALLATION OF HVAC SYSTEM AS PER APPROVED PLANS.City of Philadelphia · 2025
PC to purchase and install all equipment and fixtures scheduled on the plumbing documents. These items include, but are not limited to, water heater, expansion tank & stand, recirculation pump, control mechanisms, suspended grease interceptor assemblies, drain through, floor sinks, floor drains, hub drains, backflow preventers, filters, natural gas booster system, solenoid valves, strainers and
pressure control devices. FIXTURE REPLACEMENT WITH PIPINGCity of Philadelphia · 2025
INSTALLATION OF ELEVATOR DRAINAGE SYSTEMS FOR THE THREE (3) NEW ELEVATORS, NEW ELEVATOR MACHINE ROOM. RELOCATIONS OF DOMESTIC WATER LINES AND SANITARY SEWER LINES, RENOVATION OF STAFF UTILIZED FACILITIESCity of Philadelphia · 2024
FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.City of Philadelphia · 2024
FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2024
Plumbing Permit (Interior) for combo CP-2024-003041
INSTALL 7 LAVATORIES, 2 SINKS, 1 WASHING MACHINE BOX AND 1 WATER CLOSET ACOORDING TO THE 2018 PPC AND PER PLANS.City of Philadelphia · 2024
Permitted projects on public record. Addresses are omitted for privacy.