What the public permit record shows, not self-reported reviews.
Is DJ CROSS INC a real contractor?
DJ CROSS INC appears in public building-permit records with 7 permits filed through 2025 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is DJ CROSS INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to DJ CROSS INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is DJ CROSS INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. DJ CROSS INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is DJ CROSS INC's work?
The most recent permit on record for DJ CROSS INC is dated 2025-08-25, with 7 permits on file in total.
FOR MODIFICATIONS TO EXISTINGS HVAC SYSTEMS TO INCLUDE REPLACEMENT OF FLUE, PIPING, DAMPERS, LOUVERS AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING, FIRE SUPPRESSION.City of Philadelphia · 2025
Mechanical / Fuel Gas Permit for combo CP-2024-003808
For the replacement of an existing boiler system with associated mechanical upgrades as per approved plans and in accordance with 2018 IMC. Separate permits to be obtained for all other work.City of Philadelphia · 2025
FOR STRUCTURAL ALTERATIONS IN ASSOCIATION WITH BOILER SYSTEM REPLACEMENT. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC. SEPARATE PERMITS REQUIRED FOR M.E.P. WORK.City of Philadelphia · 2025
FOR THE INSTALLATION OF FIREPLACES AS PER APPROVED PLANS.City of Philadelphia · 2023
For the Repairs to the masonry chimney to an existing structure at Bachelors Barge Boathouse #6 Boat House Row.
As per approved plans.City of Philadelphia · 2023
Remove existing first floor living room fireplace with a new wood-burning stove. The current fireplace flue, smoke shelf, and chimney base is proposed for removal, up until the ceiling. The existing masonry chimney must be re-supported with a steel bracket assembly so that the loads are properly transferred to the existing load bearing wall. Demolish CMU block chimney as indicated. details as shown on plan.City of Philadelphia · 2023
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you DJ CROSS INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.