What the public permit record shows, not self-reported reviews.
Is DIANE R HINMAN a real contractor?
DIANE R HINMAN appears in public building-permit records with 8 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is DIANE R HINMAN's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to DIANE R HINMAN by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is DIANE R HINMAN licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. DIANE R HINMAN has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is DIANE R HINMAN's work?
The most recent permit on record for DIANE R HINMAN is dated 2026-05-07, with 8 permits on file in total.
LEVEL II ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING EDUCATIONAL FACILITY AS PER APPROVED PLANS. EXISTING BUILDING NOT REQUIRED TO BE SPRINKLERED. *2018 IEBC REVIEW*
**SEPARATE PERMITS REQUIRED FOR MEP WORK**City of Philadelphia · 2026
FOR LEVEL II ALTERATIONS TO AN EXISTING ATTACHED STRUCTURE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS,
PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT.
FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS AND DOCUMENTATION.
***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ******************************************City of Philadelphia · 2025
FOR LEVEL II ALTERATIONS AT PARTIAL FIFTH FLOOR FOR USE AS A BUSINESS OCCUPANCY, ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2024
FOR LEVEL 2 ALTERATIONS FOR FIT-OUT OF COMMERCIAL RETAIL SPACE AS PER PLANS.City of Philadelphia · 2023
FOR A LEVEL II INTERIOR ALTERATIONS TO AN EXISTING STRUCTURE. FOR USE AS A BUSINESS OCCUPANCY. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS, EXTERIOR AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. BUILDING IS FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.**NO SIGN APPROVED ON THIS PERMIT**
**AMENDED AS OF 1/4/2024 FOR A LAYOUT MODIFICATION AS PER APPROVED PLANS**City of Philadelphia · 2022
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you DIANE R HINMAN?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
FOR LEVEL III ALTERATION WITH PARTIAL CHANGE OF OCCUPANCY CLASSIFICATION TO EXPANDING THE EXISTING ADMINISTRATIVE SERVICES AND DAYCARE (MORE THAN 2 1/2 YEARS OLD) AS PER APPROVED PLANS. BUILIDING TO BE FULLY SPRINKLERED. SEPARATE PERMITS REQUIRED FOR MEP &FP WORK.City of Philadelphia · 2022
LEVEL II ALTERATIONS (NO CHANGE OF OCCUPANCY) TO CREATE A VANILLA BOX SHELL SPACE WITH ACCESSIBLE TOILET ROOMS AND NEW EXTERIOR RAMP AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR FIT-OUT PRIOR TO OCCUPANCY.
**SEPARATE PERMITS REQUIRED FOR ANY MEP WORK**City of Philadelphia · 2020
LEVEL III INTERIOR ALTERATIONS TO CREATE A VACANT COMMERCIAL SPACE WITHIN AN EXISTING ONE-STORY BUILDING AS PER APPROVED PLANS. SEPARATE USE REGISTRATION AND FIT-OUT PERMITS REQUIRED PRIOR TO OCCUPANCY.
**SEPARATE PERMITS REQUIRED FOR ANY MEP WORK**City of Philadelphia · 2019
Permitted projects on public record. Addresses are omitted for privacy.