What the public permit record shows, not self-reported reviews.
Is DENNIS T DRAGON a real contractor?
DENNIS T DRAGON appears in public building-permit records with 9 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is DENNIS T DRAGON's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to DENNIS T DRAGON by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is DENNIS T DRAGON licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. DENNIS T DRAGON has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is DENNIS T DRAGON's work?
The most recent permit on record for DENNIS T DRAGON is dated 2026-01-15, with 9 permits on file in total.
For the partial demolition and erection of an addition to the rear and interior renovations of an existing attached structure with roof deck accessed from 3rd floor. details as shown in plans.City of Philadelphia · 2026
Demoing and replacing existing walls in same footprint. Water intrusion has caused wood deterioration over time. One sloped roofs pitch and wall heights will be changed. details a shown in the plan.City of Philadelphia · 2024
LEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO UNIT 'E' WITHIN AN EXISTING SIX (6) DWELLING UNIT BUILDING AS PER APPROVED PLANS. EXISTING BUILDING NOT REQUIRED TO BE SPRINKLERED. *2018 IEBC REVIEW*
**SEPARATE PERMITS REQUIRED FOR ANY MEP WORK**City of Philadelphia · 2024
EZ PERMIT STANDARDS ALTERATIONS
For alterations to an existing one family dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Structural alteration or repair is expressly prohibited under this permit. Prohibited structural work includes any modification to exterior walls, party walls, floor/roof framing or foundations, underpinning and excavations (i.e., digging in basement). Any work/alterations to the basement/cellar are expressly prohibited unless documented as an existing habitable space with heights and means of egress per conditions of the EZ standard. separate permits required for mechanical, electric and plumbing, etc.
*No basement alterations of any kind were proposed or approved for this permit*
*No structural alterations of any kind were proposed or approved for this permit*
Remove non-load bearing wall and closet. Move wall and closet approximately 2 feet. Install new wall and closet. Sheetrock, tape, spackle, prime, paint, install new tile, subfloor, and soffit.City of Philadelphia · 2023
EZ INTERIOR DEMOLITION- FOR THE INTERIOR DEMOLITION ON NON-BEARING PARTITION WALL AND CEILINGS AS PER ATTACHED STANDARD. DEVIATIONS FROM THESE STANDARDS REQUIRE SUBMISSION OF CONSTRUCTION AND SITE PLANS.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you DENNIS T DRAGON?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2018
TO AMEND PREVIOUSLY ISSUED ADDITION PERMIT AP#723871 TO ADD UNDERPINNING WORK TO THE EXISTING BASEMENT, ADD NEW TOILET ROOM, AND ADD NEW WINDOW WELL WITHIN BASEMENT, AS PER PLANS; NO OTHER CHANGES ON THIS PERMIT; SEPARATE PERMITS REQUIRED FOR ALL MEP WORK; BUILDING NOT REQUIRED TO BE SPRINKLERED; NEIGHBORS MUST BE NOTIFIED WITHIN TEN (10) DAYS OF UNDERPINNING TAKING PLACE.City of Philadelphia · 2018
EZ INTERIOR DEMOLITION- FOR THE INTERIOR DEMOLITION OF NON LOAD-BEARING PARTITION WALLS AND CEILINGS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.City of Philadelphia · 2018
ADDITION AND ALTERATIONS TO AN EXISTING TWO (2) STORY TOWNHOUSE AS PER APPROVED PLANS. SEPARATE PERMITS REUQIRED FOR ANY M.E.P. WORK.City of Philadelphia · 2017
ADDITION FOR FIRST FLOOR POWDER ROOMCity of Philadelphia · 2012
Permitted projects on public record. Addresses are omitted for privacy.