Is DEMOLITION MAN LLC a real contractor?
DEMOLITION MAN LLC appears in public building-permit records with 60 permits filed through 2019 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is DEMOLITION MAN LLC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to DEMOLITION MAN LLC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is DEMOLITION MAN LLC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. DEMOLITION MAN LLC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is DEMOLITION MAN LLC's work?
The most recent permit on record for DEMOLITION MAN LLC is dated 2019-11-26, with 60 permits on file in total.
FOR THE COMPLETE DEMOLITION OF AN EXISTING, THREE (3) STORY ATTACHED STRUCTURE PREVIOUSLY USED AS SINGLE-FAMILY HOUSEHOLD LIVING, INCLUDING BREAK-UP OF FOUNDATION SLAB, AS PER SUBMITTED DOCUMENTS AND SITE SAFETY PLAN; TO BE DEMOLISHED BY HAND AND WITH HAND HELD TOOLS ONLY; PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES; APPROVED SITE SAFETY PLAN MUST BE MAINTAINED ON SITE AT ALL TIMES DURING DEMOLITION; ANY DEVIATION FROM THE SUBMITTED PLAN AND DOCUMENTS WILL REQUIRE AN AMENDED BUILDING PERMIT.
* NEWLY EXPOSED WALLS TO BE TREATED.
* A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 8 FEET OF BUILDING FAÇADE IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMITS ARE REQUIRED.City of Philadelphia · 2019
COMPLETE DEMOLITION OF AN EXISTING SEMI-DETACHED (ALLEY ON ONE SIDE) TWO-STORY, WOOD SINGLE FAMILY DWELLING BY HAND METHODS. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT.City of Philadelphia · 2019
COMPLETE DEMOLITION OF AN EXISTING ATTACHED THREE-STORY, WOOD SINGLE FAMILY DWELLING BY HAND METHODS. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. SIDEWALK CLOSURE REQUIRED AS REFLECTED ON APPROVED SITE PLAN AND IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE STREET CLOSURE PERMIT REQUIRED PRIOR TO START OF WORK. ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT.City of Philadelphia · 2019
COMPLETE DEMOLITION OF AN EXISTING ATTACHED TWO-STORY, WOOD SINGLE FAMILY DWELLING BY HAND METHODS. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. SIDEWALK CLOSURE REQUIRED AS REFLECTED ON APPROVED SITE PLAN AND IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE STREET CLOSURE PERMIT REQUIRED PRIOR TO START OF WORK. ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you DEMOLITION MAN LLC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to DEMOLITION MAN LLC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2019
FOR THE COMPLETE DEMOLITION OF A TWO-STORY STRUCTURE ON THE LOT. A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 6 FEET OF BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMITS MAY BE REQUIRED. ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT.City of Philadelphia · 2019
FOR THE COMPLETE DEMOLITION OF AN EXISTING ONE (1) STORY MASONRY STRUCTURE.STRUCTURE TO BE DEMOLISHED BY BOTH HAND AND MECHANICAL. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. SEPARATE STREETS DEPARTMENT APPROVAL REQUIRED FOR SIDEWALK CLOSURE.City of Philadelphia · 2019
FOR THE COMPLETE DEMOLITION OF AN EXISTING, SEMI-DETACHED, THREE (3) STORY STRUCTURE. STRUCTURE TO BE DEMOLISHED BY HAND AND WITH HAND HELD TOOLS ONLY. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES.
* 21 DAY POSTING AND NOTICE REQUIRED PER A-303.2City of Philadelphia · 2019
FOR THE COMPLETE DEMOLITION OF AN EXISTING ATTACHED STRUCTURE. SEE AP # 997451 FOR PLANS. FOR USE AS VACANT LOT.City of Philadelphia · 2019
COMPLETE DEMOLITION OF AN EXISTING ATTACHED ONE-STORY, MASONRY AND WOOD SINGLE FAMILY DWELLING BY HAND METHODS. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. COMPLETE SIDEWALK CLOSURE AS REFLECTED ON APPROVED SITE PLAN. SEPARATE STREET CLOSURE PERMIT REQUIRED PRIOR TO START OF WORK. ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT.City of Philadelphia · 2019
FOR THE COMPLETE DEMOLITION OF AN EXISTING ATTACHED TWO (2) STORY MASONRY STRUCTURE.STRUCTURE TO BE DEMOLISHED BY BOTH HAND AND MECHANICAL. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. SEPARATE STREETS DEPARTMENT APPROVAL REQUIRED FOR SIDEWALK CLOSURE.City of Philadelphia · 2019
COMPLETE DEMOLITION OF AN EXISTING DETACHED (ENTIRE BLOCK) TWO-STORY, MASONRY, STEEL AND WOOD INDUSTRIAL BUILDING MECHANICAL METHODS. SPECIAL INSPECTIONS REQUIRED AND TO BE PERFORMED BY POULSON & ASSOCIATES. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. COMPLETE SIDEWALK CLOSURE REQUIRED AS REFLECTED ON APPROVED SITE PLAN. SEPARATE STREET CLOSURE PERMIT REQUIRED PRIOR TO START OF WORK. ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT.City of Philadelphia · 2019
FOR THE COMPLETE DEMOLITION OF THE EXISTING THREE (3) STORY SEMI-DETACHED STRUCTURE. ALL PERMITTED DEMOLITION ACTIVITY TO BE DONE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN AND SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES. DEMOLITION TO BE DONE BY HAND AND WITH HAND TOOLS ONLY. PROTECTION OF PEDESTRIANS, ADJACENT PROPERTIES, AND PUBLIC RIGHT-OF-WAY TO BE IN PLACE PRIOR TO START OF WORK. SEPARATE STREETS DEPARTMENT APPROVAL REQUIRED FOR SIDEWALK CLOSURE. 21 DAY POSTING AND NOTICE REQUIRED PER A-303.2.City of Philadelphia · 2019
Permitted projects on public record. Addresses are omitted for privacy.