What the public permit record shows, not self-reported reviews.
Is DAVID BRANIGAN a real contractor?
DAVID BRANIGAN appears in public building-permit records with 43 permits filed through 2025 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is DAVID BRANIGAN's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to DAVID BRANIGAN by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is DAVID BRANIGAN licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. DAVID BRANIGAN has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is DAVID BRANIGAN's work?
The most recent permit on record for DAVID BRANIGAN is dated 2025-05-05, with 43 permits on file in total.
TO LEGALIZE THE INSTALLATION OF EXTERIOR WALL COVERINGS AND WINDOWS TO AN EXISTING DETACHED SINGLE-FAMILY DWELLING AS PER APPROVED PLAN.City of Philadelphia · 2025
FOR THE LEGALIZATION OF AN EXISTING CARPORT AND TWO (2) PARKING SPACES AS PER APPROVED PLAN. CARPORT IS ATTACHED TO AN EXISTING SINGLE-FAMILY DETACHED STRUCTURE.
*SEPARATE PERMITS REQUIRED FOR ELECTRICAL, PLUMBING, AND MECHANICAL WORK*City of Philadelphia · 2024
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER 13R WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.City of Philadelphia · 2024
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER 13R WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.City of Philadelphia · 2024
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER 13R WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you DAVID BRANIGAN?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2024
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.
MULTI FAMILY - EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES.
Installing 2 new HVAC systems, 1 in each of 2 dwellings. Each dwelling will have a 41k BTU furnace, 2 ton 24k BTU AC unit, ductwork, & 8 registers.City of Philadelphia · 2024
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS TWO FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLERS THROUGHOUT. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.City of Philadelphia · 2024
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS TWO FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLERS THROUGHOUT (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.City of Philadelphia · 2024
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING.. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.City of Philadelphia · 2023
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.
MULTI FAMILY - EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES.
New construction. Installation of (2) gas furnaces, (2) central air units, new duct work throughout, and 14 registers.City of Philadelphia · 2023
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING.. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.City of Philadelphia · 2023
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.City of Philadelphia · 2023
Permitted projects on public record. Addresses are omitted for privacy.