Full rewire with all new switches, outlets, fixtures, circuit breakers, smoke and co2 detectors, with upgraded service to 200A, as per 2017 NECCity of Philadelphia · 2025
Installation of solar array in accordance with signed standardCity of Philadelphia · 2025
INSTALLATION OF ROOFTOP MOUNTED 8.8 KW SOLAR PHOTOVOLTAIC PV SYSTEM ACCORDING TO THE APPROVED DRAWINGS -2017 NECCity of Philadelphia · 2025
Installation of solar array in accordance with signed standardCity of Philadelphia · 2025
Replace all knob-and-tube circuits serving 1st floor only, with all new NM wire, outlets, switches, circuit breakers and smoke/co2 detectors, from existing service, as per 2017 NECCity of Philadelphia · 2025
INSTALLATION OF ROOFTOP MOUNTED 3.96 KW SOLAR PHOTOVOLTAIC PV SYSTEM ACCORDING TO THE 2017 NEC AND PER EZ STANDARD.City of Philadelphia · 2025
Full house rewire Fishing old-work, with all new outlets, switches, circuit breakers, fixtures, smoke and co2 detectors, from existing 100A service, as per 2017 NECCity of Philadelphia · 2025
Full rewire with all new switches, outlets, light fixtures, circuit breakers, smoke & co2 detectors, from 200A service upgrade, as per 2017 NEC
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2025
Fishing old-work rewire of whole house except kitchen, with all new switches, outlets, circuit breakers, main panel, smoke and co2 detectors, from existing 100A service, as per 2017 NECCity of Philadelphia · 2025
AMEND 12/03/2025
Full rewire with all new switches, outlets, smoke and co2 detectors, and circuit breakers, from existing 200A service, as per 2017 NEC
AMEND
Full rewire BESIDES BASEMENT with all new switches, outlets, smoke and co2 detectors, and circuit breakers, from existing 200A service, as per 2017 NEC
Rewire 3rd floor FISHING OLD-WORK, with all new switches, outlets, smoke/co2 detectors, and circuit breakers, from existing 200A service, as per 2017 NECCity of Philadelphia · 2025
For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 shall be in place prior to start of work.City of Philadelphia · 2025
INSTALLATION OF ROOFTOP MOUNTED 7.38 KW SOLAR PHOTOVOLTAIC PV SYSTEM ACCORDING TO THE 2017 NEC AND PER EZ STANDARD.City of Philadelphia · 2024