What the public permit record shows, not self-reported reviews.
Is Construction Force Inc. a real contractor?
Construction Force Inc. appears in public building-permit records with 9 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is Construction Force Inc.'s track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to Construction Force Inc. by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is Construction Force Inc. licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. Construction Force Inc. has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is Construction Force Inc.'s work?
The most recent permit on record for Construction Force Inc. is dated 2026-01-21, with 9 permits on file in total.
FOR LEVEL II INTERIOR ALTERATIONS WITH PARTIAL CHANGE OF OCCUPANCY TO CREATE FIVE (5) DWELLING UNITS ON THE SECOND FLOOR OF AN EXISTING HIGH-RISE BUILDING. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS AND PROVIDE FINISHES/ FURNISHINGS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2026
FOR LEVEL II INTERIOR ALTERATIONS TO CREATE A DWELLING UNIT AT UNIT 202 IN AN EXISTING R2 OCCUPANCY WITHIN AN EXISTING BUILDING. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS AND PROVIDE FINISHES/FURNISHINGS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
AMENDMENT APPROVED AS OF 07/08/2025:
TO REVISE THE FLOOR LAYOUT PER AMENDED PLANS.City of Philadelphia · 2025
LEVEL II INTERIOR ALTERATIONS WITH PARTIAL CHANGE OF OCCUPANCY TO CREATE NINE (9) DWELLING UNITS ON THE THIRD FLOOR OF AN EXISTING HIGH-RISE BUILDING AS PER APPROVED PLANS. FLOOR TO BE SPRINKLERED. *2018 IEBC REVIEW*
**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**
AMENDMENT APPROVED 6/29/25
AMEND ALTERATIONS PERMIT CP-2024-001042 FOR CHANGE TO SPECIAL INSPECTIONS AGENCY AND REMOVAL OF INSPECTION ITEM AS PER APPROVED DOCUMENTATION.City of Philadelphia · 2024
FOR LEVEL II ALTERATIONS AND CHANGE IN OCCUPANCY ON THE FOURTH FLOOR OF AN EXISTING BUILDING. FOURTH FLOOR OF EXISTING BUILDING TO BE FULLY SPRINKLERED WITH NFPA 13. SEPARATE BUILDING PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION.
*AMEND 6/10/24; REVISE FLOOR PLAN FOR CORRIDOR AND DWELLING UNITS PER AMENDED CONSTRUCTION DOCUMENTS*
*AMEND 6/30/25; REVISE SPECIAL INSPECTIONS AND SPECIAL INSPECTION AGENCY PER AMENDED CONSTRUCTION DOCUMENTS*City of Philadelphia · 2023
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you Construction Force Inc.?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to Construction Force Inc.'s website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
FOR REPAIRS TO FLOORS, CEILINGS AND COLUMNS OF VACANT SHELL SPACE AT FOURTH FLOOR OF EXISTING BUILDING.City of Philadelphia · 2023
**Amendment dated 3/27/2024 to add details for rain leader for column furring walls as per revised plans.**
**Amendment dated 8/29/2023 to revise apartment layouts to facilitate floor-mounted mechanical units instead of ceiling-mounted mechanical units.**
For Level II Alterations with a partial change of occupancy from Group B (Office) to Group R-2 (Eight (8) New Dwelling Units for a new total of on the partial first floor of an existing eight (8) story attached structure, as per plans; separate permits required for all MEP/FSP work; no structural work on this permit; building is currently sprinklered throughout in accordance with NFPA 13, with standpipes installed within the exit stairways in accordance with NFPA 14, and with a fire alarm system installed throughout in accordance with NFPA 72; if field conditions vary contact design engineer prior to the start of any work; compliance with Philadelphia Fire and Property Maintenance Codes required prior to occupancy; see ZP-2023-001218 for zoning/use approval.City of Philadelphia · 2023
LEVEL II ALTERATIONS WITH PARTIAL CHANGE OF OCCUPANCY TO CREATE FOUR (4) DWELLING UNITS ON THE GROUND FLOOR OF AN EXISTING HIGH-RISE BUILDING AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED. *2018 IEBC REVIEW*
**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**City of Philadelphia · 2023
EXTERIOR ALTERATIONS INCLUDING WINDOW REPLACEMENT AND INTERIOR ALTERATIONS WITH PARTIAL CHANGE IN USE AT 1ST AND 2ND FLOORS WITH NEW MEZZANINE FLOOR CONSTRUCTION IN A 10 STORY STRUCTURE.City of Pittsburgh · 2021$425,000
EXTERIOR ALTERATIONS (WINDOW GLAZING) AND INTERIOR ALTERATIONS TO CREATE 174 DWELLING UNITS ON FLOORS 2-19 AT A 19 STORY STRUCTURECity of Pittsburgh · 2021
Permitted projects on public record. Addresses are omitted for privacy.