What the public permit record shows, not self-reported reviews.
Is CONCEPT DEVELOPMENT GROUP INC a real contractor?
CONCEPT DEVELOPMENT GROUP INC appears in public building-permit records with 12 permits filed through 2015 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is CONCEPT DEVELOPMENT GROUP INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to CONCEPT DEVELOPMENT GROUP INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is CONCEPT DEVELOPMENT GROUP INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. CONCEPT DEVELOPMENT GROUP INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is CONCEPT DEVELOPMENT GROUP INC's work?
The most recent permit on record for CONCEPT DEVELOPMENT GROUP INC is dated 2015-01-12, with 12 permits on file in total.
AMEND BUILDING PERMIT #488060 TO CORRECT OCCUPANCY FROM SINGLE FAMILY TO A TWO FAMILY DWELLING. NO OTHER CHANGES.City of Philadelphia · 2015
ERECTION OF A 1 STORY ADDITION TO EXISTING SFDCity of Philadelphia · 2014
FOR THE ERECTION OF A ONE(1) STORY ADDITION TO EXISTING SFD AS PER PLAN. SEPERATE PERMIT REQUIRED FOR MEP SYSTEMSCity of Philadelphia · 2014
NEW CONSTRUCTION OF AN ATTACHED THREE STORY TWO FAMILY DWELLING WITH CELLAR, ROOF DECK, AND ROOF ACCESS STAIR ENCLOSURE ON EXISTING FOUNDATION WITH UNDERPINNING AS PER THE SEALED SUBMITTED PLAN. ELECTRICAL, PLUMBING, MECHANICAL, AND FIRE SUPPRESSION WORK REQUIRES ADDITIONAL PERMITS. CALL THE INSPECTOR PRIOR TO STARTING WORK.City of Philadelphia · 2013
NEW CONSTRUCTION OF AN ATTACHED THREE STORY TWO FAMILY DWELLING WITH CELLAR, ROOF DECK, AND ROOF ACCESS STAIR ENCLOSURE AS SHOWN IN THE APPLICATION.City of Philadelphia · 2013
FOR THE ERECTION OF A (4) STORY, (2) FAMILY DWELLING WITH PILOT HOUSE AND ROOF DECK.City of Philadelphia · 2013
FOR THE ERECTION OF A FOUR-STORY STRUCTURE WITH UNINHABITABLE PILOTHOUSE, PARKING GARAGE AND EXTERIOR PARKING SPACES WITH ELEVATOR FOR USE AS A FOUR-FAMILY DWELLING. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, PLUMBING, HVAC AND FIRE SUPPRESSION SYSTEMS.City of Philadelphia · 2013
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you CONCEPT DEVELOPMENT GROUP INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to CONCEPT DEVELOPMENT GROUP INC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
FOR THE ERECTION OF A REINFORCED CONCRETE SHALLOW FOUNDATION SYSTEM WITH SPREAD-FOOTINGS. PROTECTION OF ADJOINING FOUNDATION SYSTEM SHALL BE IN ACCORDANCE WITH APPROVED PLANS & UNDER SUPERVISION OF A COMMONWEALTH OF PA REGISTERED PROFESSIONAL ENGINEER. PERMIT HOLDER TO NOTIFY OWNER(S) OF ADJOINING PROPERTY(IES) NO LESS THAN TEN (10) DAYS PRIOR TO COMMENCEMENT OF PERMITTED WORK.City of Philadelphia · 2013
FOR THE ERECTION OF A REINFORCED CONCRETE SHALLOW FOUNDATION SYSTEM WITH SPREAD-FOOTINGS. PROTECTION OF ADJOINING FOUNDATION SYSTEM SHALL BE IN ACCORDANCE WITH APPROVED PLANS & UNDER SUPERVISION OF A COMMONWEALTH OF PA REGISTERED PROFESSIONAL ENGINEER. PERMIT HOLDER TO NOTIFY OWNER(S) OF ADJOINING PROPERTY(IES) NO LESS THAN TEN (10) DAYS PRIOR TO COMMENCEMENT OF PERMITTED WORK.** SEE AP 459561 FOR APPROVED PLANS**City of Philadelphia · 2013
FOR THE ERECTION OF A REINFORCED CONCRETE SHALLOW FOUNDATION SYSTEM WITH SPREAD-FOOTINGS. PROTECTION OF ADJOINING FOUNDATION SYSTEM SHALL BE IN ACCORDANCE WITH APPROVED PLANS & UNDER SUPERVISION OF A COMMONWEALTH OF PA REGISTERED PROFESSIONAL ENGINEER. PERMIT HOLDER TO NOTIFY OWNER(S) OF ADJOINING PROPERTY(IES) NO LESS THAN TEN (10) DAYS PRIOR TO COMMENCEMENT OF PERMITTED WORK.City of Philadelphia · 2013
ADMINISTRATIVE PERMIT TO REINSTATE NEW CONSTRUCTION PERMIT #385300 WHICH WAS REVOKED ON 2/13/2013, AND TO CHANGE THE OWNER AND CONTRACTOR INFORMATION.
GENERAL CONTRACTOR HAS NO EMPLOYEES AS PER NOTARIZED LETTER. A LIST OF ALL TRADE SUB-CONTRACTORS WORKING ON SITE TO BE SUBMITTED TO INSPECTOR. ALL CONTRACTORS TO BE LICENSED IN THE CITY OF PHILADELPHIA.City of Philadelphia · 2013
COMPLETE DEMOLITION OF ALL BUILDINGS ON THE LOT. NEW CONSTRUCTION, ELECTRICAL, PLUMBING, MECHANICAL, AND FIRE SUPRESSION WORK REQUIRES ADDITIONAL PERMITS. CALL THE INSPECTOR PRIOR TO STARTING WORK.City of Philadelphia · 2011
Permitted projects on public record. Addresses are omitted for privacy.