What the public permit record shows, not self-reported reviews.
Is CIDER MILL SERVICES INC a real contractor?
CIDER MILL SERVICES INC appears in public building-permit records with 104 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is CIDER MILL SERVICES INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to CIDER MILL SERVICES INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is CIDER MILL SERVICES INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. CIDER MILL SERVICES INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is CIDER MILL SERVICES INC's work?
The most recent permit on record for CIDER MILL SERVICES INC is dated 2026-05-21, with 104 permits on file in total.
FOR THE COMPLETE DEMOLITION OF A ONE (1) STORY DETACHED GAS STATION STRUCTURE AND CANOPY. DEMOLITION TO BE DONE WITH MECHANICAL DEMOLITION EQUIPMENT. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN AND SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT. 21 DAY POSTING & NOTICE REQUIRED PER A-303.2.
* SEE CP-2026-002361 FOR SEPARATE REMOVAL AND REPLACEMENT OF CONCRETE SLAB.
* A SEPARATE GENERAL PERMIT IS REQUIRED FOR THE REMOVAL OF GAS STATION UNDERGROUND STORAGE TANKS.City of Philadelphia · 2026
FOR THE COMPLETE DEMOLITION OF THE EXISTING ONE (1) STORY DETACHED MASONRY AND WOOD STRUCTURE. ALL PERMITTED DEMOLITION ACTIVITY TO BE DONE IN ACCORDANCE WITH SITE SAFETY DEMOLITION PLAN AND SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES. DEMOLITION TO BE DONE BY MECHANICAL METHODS. PROTECTION OF PEDESTRIANS, PUBLIC RIGHT-OF-WAY, AND ADJACENT PROPERTIES TO BE IN PLACE PRIOR TO START OF WORK. SEPARATE STREETS DEPARTMENT APPROVAL REQUIRED FOR RIGHT-OF-WAY ENCROACHMENT OR CLOSURE.City of Philadelphia · 2026
FOR THE COMPLETE DEMOLITION OF AN EXISTING ATTACHED TWO (2) STORY MASONRY STRUCTURE.STRUCTURE TO BE DEMOLISHED BY MECHANICAL. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO THE START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. SEPARATE STREETS DEPARTMENT APPROVAL REQUIRED FOR SIDEWALK CLOSURE
21 DAY POSTING CAN BE WAIVED FOR DANGEROUS CASE [SECTION A-303.2 OF ADMINISTRATIVE CODE]City of Philadelphia · 2025
FOR THE COMPLETE DEMOLITION OF AN EXISTING STRUCTURE AT 4672 DUFFIELD STREET (TO BE DEMOLISHED CONCURRENTLY WITH 4670 DUFFIELD STREET). EXISTING STRUCTURE TO BE DEMOLISHED BY A COMBINATION OF HAND-HELD AND MECHANICAL EQUIPMENT PER APPROVED PLANS. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES.
* A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMITS ARE REQUIRED.
* 21 DAY POSTING AND NOTICE REQUIRED PER A-303.2
* NEWLY EXPOSED WALLS TO BE TREATED
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you CIDER MILL SERVICES INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to CIDER MILL SERVICES INC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2025
COMPLETE DEMOLITION OF AN EXISTING DETACHED TWO-STORY, CONCRETE, MASONRY AND WOOD COMMERCIAL BUILDING BY HAND METHODS. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. COMPLETE SIDEWALK CLOSURE REQUIRED IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE STREET CLOSURE PERMIT REQUIRED PRIOR TO START OF WORK. ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT.City of Philadelphia · 2025
FOR THE COMPLETE DEMOLITION OF ALL EXISTING STRUCTURES ON THE LOT.City of Philadelphia · 2025
FOR THE COMPLETE DEMOLITION OF ALL EXISTING STRUCTURES ON THE LOTCity of Philadelphia · 2025
Complete demo to create a vacant lotCity of Philadelphia · 2024
Complete demo of existing structure to create a vacant lotCity of Philadelphia · 2024
MAKE SAFE PERMIT FOR THE COMPLETE DEMOLITION OF THE TWO-STORY SEMI-DETACHED -STORY STRUCTURE BY HAND AND HAND HOLD DEVICES AND MECHANICAL METHODS (FOR FOUNDATION AND DEBRIS TRANSFER). PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. *SEPERATE STREETS DEPARTMENT PERMIT REQUIRE FOR CLOSURE OF RIGHT OF WAY. *21 DAY POSING AND NOTICE REQUIRED PER A-303.2 *A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN MIN. 6 FEET OF BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE IBC.*MAKE SAFE TO ADDRESS VIOLATION CASE#CF-2024-068010.City of Philadelphia · 2024
MAKE SAFE PERMIT FOR THE COMPLETE DEMOLITION OF THE TWO-STORY SEMI-DETACHED -STORY STRUCTURE BY HAND AND HAND HOLD DEVICES AND MECHANICAL METHODS (FOR FOUNDATION AND DEBRIS TRANSFER). PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. *SEPERATE STREETS DEPARTMENT PERMIT REQUIRE FOR CLOSURE OF RIGHT OF WAY. *21 DAY POSING AND NOTICE REQUIRED PER A-303.2 *A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN MIN. 6 FEET OF BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE IBC.*MAKE SAFE TO ADDRESS VIOLATION CASE#CF-2024-063248.City of Philadelphia · 2024
FOR THE COMPLETE DEMOLITION OF ONE (1) EXISTING DETACHED TWO (2) STORY STRUCTURE BY MECHANICAL DEMOLITION. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMITS ARE REQUIRED. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. * ASBESTOS REMOVAL REQUIRED PRIOR TO THE START OF WORK *City of Philadelphia · 2023
Permitted projects on public record. Addresses are omitted for privacy.