What the public permit record shows, not self-reported reviews.
Is CHRIS SINCAVAGE a real contractor?
CHRIS SINCAVAGE appears in public building-permit records with 12 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is CHRIS SINCAVAGE's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to CHRIS SINCAVAGE by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is CHRIS SINCAVAGE licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. CHRIS SINCAVAGE has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is CHRIS SINCAVAGE's work?
The most recent permit on record for CHRIS SINCAVAGE is dated 2026-04-22, with 12 permits on file in total.
Permit amended on 5/5/26: Structural framing revisions for 3rd floor and roof deck addition.
Third floor addition with pilot house/ roof deck and alterations to an existing 2-story, owner occupied rowhome. Third floor addition includes new bathroom, bedroom, office space and stair to roof deck/ pilothouse. Kitchen to get new cabinets and appliances, no change to layout. Second floor bathroom to receive new fixtures, no change to layout. No work in the basement. No excavation. Work includes new exterior and interior partitions, new finishes, and new plumbing fixtures, new windows, and doors as noted in drawings. No increase in current lot coverage. Height increase does not exceed 38'-0". details as shown on the plansCity of Philadelphia · 2026
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.
INSTALL A 96% FURNACE, 1.5 TON AC, DUCTWORK, AND 8 DIFFUSERS IN 3RD FLOOR ADDITION. THE CONDENSER WILL BE LOCATED ON THE GROUND.City of Philadelphia · 2026
For the erection of an addition with roof deck and roof deck access structure above an existing attached structure. details as shown on the plans.City of Philadelphia · 2025
FOR THE ERECTION OF A VERTICAL ADDITION ON AN EXISTING STRUCTURE TO INCLUDE A ROOF DECK, ROOF DECK ACCESS STRUCTURE, NEW PARTITIONS AND FINISHES. ALL WORK TO BE DONE AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. **SEPARATE PERMIT REQUIRED FOR MEP WORKS**
AMENDMENT #1:
AMEND TO REDUCE THE WIDTH OF THE PROPOSED THIRD FLOOR STAIRS FROM 36" WIDE TO 34" WIDE AND THE WIDTH OF THE PROPOSED PILOT HOUSE STAIRS FROM 36" WIDE TO 31" WIDE AS PER AMENDED PLAN.City of Philadelphia · 2024
For the erection of an addition and for For interior alterations to an existing attached single-family dwelling per plans. Separate permits are required for all associated Mechanical, Electrical, and Plumbing work. Basement to remain non-habitable, to be used for storage and utilities only.
Amend Permit 5/30/2024 to change the pilot house staircase per BBS variance.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you CHRIS SINCAVAGE?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2024
FOR THE ALTERATION TO THE STRUCTURAL FRAMING IN ORDER TO INSTALL A NEW COMMERCIAL VEN HOOD TO AN EXISTING TAKE OUT RESTAURANT.
ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2023
**Amendment dated 3/23/2023 to add window to third story addition, reduce stair width to 30 inches from 36 inches; BBS variance granted under MI-2022-007598.** For the erection of a one (1) story addition (including a roof deck accessed by a pilot house enclosing access stairs only), above an existing two (2) story attached structure used as Group R-3 (SFD), as per plans; separate permits required for all MEP work; building is currently not required to be sprinklered; see ZP-2022-005699 for zoning approval of addition; no work to public right-of-way.City of Philadelphia · 2022
FOR THE ERECTION OF ONE-STORY ADDITION AND ROOF DECK WITH ROOF DECK ACCESS STRUCTURE ABOVE THE SECOND STORY OF AN ATTACHED STRUCTURE. SIZE AND LOCATION AS SHOWN IN THE APPLICATION / PLAN.City of Philadelphia · 2022
FOR ERECTION OF ONE-STORY ADDITION ABOVE THE EXISTING STRUCTURE. SIZE AND LOCATION AS SHOWN ON THE PLAN.City of Philadelphia · 2022
FOR THE UNDERPINNING OF FOUNDATION AS PER APPROVED PLANS SEALED BY A PROFESSIONAL ENGINEER. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMIT REQUIRED FOR ALL NEW CONSTRUCTION. NOTIFICATION TO THE ADJACENT OWNER IS REQUIRED PRIOR TO THE START OF THE WORK.City of Philadelphia · 2019
APPLICATION TO BUILD A THIRD STORY ON TOP OF EXISTING TWO-STORY STRUCTURE ( DETAILS AS SHOWN ON THE PLAN). SEPERATE PERMTIS REQUIRED FORCity of Philadelphia · 2019
FOR THE ERECTION OF A TWO (2) FLOOR ADDITION TO REAR OF SINGLE FAMILY HOME WITH EXTERIOR DECKS AS PER PLANS. SEPARATE PERMITS REQUIRED FOR ALL MECHANICAL, ELECTRICAL AND PLUMBING WORK.City of Philadelphia · 2017
Permitted projects on public record. Addresses are omitted for privacy.