What the public permit record shows, not self-reported reviews.
Is CESAR SANCHEZ a real contractor?
CESAR SANCHEZ appears in public building-permit records with 19 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is CESAR SANCHEZ's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to CESAR SANCHEZ by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is CESAR SANCHEZ licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. CESAR SANCHEZ has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is CESAR SANCHEZ's work?
The most recent permit on record for CESAR SANCHEZ is dated 2026-05-05, with 19 permits on file in total.
FOR ALTERATIONS INCLUDING ROOF FRAMING MODIFICATIONS TO AN EXISTING SINGLE-FAMILY STRUCTURE AS PER APPROVED PLAN.
*SEPARATE PERMITS REQUIRED FOR ELECTRICAL, PLUMBING, AND MECHANICAL WORK*City of Philadelphia · 2026
**REAR ADDITION AND DEATTCHED STRUCTURE -EXCAVATION PERMIT UNDER SP-2023-001097. EXCAVATION ALREADY COMPLETE AND NO NEW EXCAVATION PROPOSED. **AMENDED 12/8/25- AMENDED TO CHANGE THE DPRC-RI***
(SEE RP-2023-010015)-FOR ORIGINAL SCOPE-ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. PERGOLAS WILL BE ON DEFERED SUBMISSION.City of Philadelphia · 2024
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. PERGOLAS WILL BE ON DEFERED SUBMISSION.City of Philadelphia · 2023
Amend permit 10/20/2024 for change of DPRC-SI and Special Inspection Agency.
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. (UNDERPINNNING IS PART OF THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. PERGOLAS WILL BE ON DEFERED SUBMISSION.City of Philadelphia · 2023
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you CESAR SANCHEZ?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. PERGOLAS WILL BE ON DEFERED SUBMISSION.City of Philadelphia · 2023
Amend permit 10/20/2024 for change of DPRC-SI and Special Inspection Agency.
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. (UNDERPINNNING IS PART OF THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY. PERGOLAS WILL BE ON DEFERED SUBMISSION.City of Philadelphia · 2023
NEW CONSTRUCTION OF A FOUR (4) STORY, NINE (9) FAMILY DWELLING AND VACANT COMMERCIAL SPACE WITH BALCONIES, ROOF DECKS, AND ROOF DECK ACCESS STRUCTURES AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13. SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK. *2018 IBC REVIEW*
*AMENDMENT 10/7/24 TO INCLUDE FIRE ALARM.City of Philadelphia · 2022
FOR THE ERECTION OF AN ATTACHED STRUCTURE, ROOF DECK AND ROOF DECK ACCESS STRUCTURE. SIZE AND
LOCATION AS SHOWN IN THE APPLICATION/PLANS.City of Philadelphia · 2021
FOR THE CONSTRUCTION OF A THREE-STORY STRUCTURE WITH PILOTHOUSES ACCESSING ACCESSORY ROOF DECKS, FOR USE AS SIX-FAMILY DWELLING, AS PER APPROVED PLANS.
AMENDMENT APPROVED ON 5/19/2022: AMEND PERMIT TO REVISE SHEET G_001 TO CORRECTLY REFLECT NFPA 13 SYSTEM, AS REQUIRED.City of Philadelphia · 2021
FOR INTERIOR ALTERATIONS TO EXISTING FOUR-FAMILY DWELLING, TO INCLUDE NEW INTERIOR PARTITIONS AND INTERIOR FINISHES, AS PER APPROVED PLANS. **NO CHANGE IN OCCUPANCY CLASSIFICATION**
AMENDMENT APPROVED ON 10/6/2021: TO REFLECT REVISED PROJECT TITLE AND TITLE BLOCK, PER SUBMITED PLANS.City of Philadelphia · 2021
LEVEL II INTERIOR ALTERATIONS ( CHANGE OF OCCUPANCY) TO THE FIRST FLOOR OF AN EXISTING STRUCTURE AS PER APPROVED PLANS **IEBC 2018** **SEPARATE PERMITS REQUIRED FOR ANY MEP & FIRE SUPPRESSION WORK**City of Philadelphia · 2021
**AMENDMENT DATED 8/27/2021 - modifications to floor layout at second floor, change fourth floor to be a fourth dwelling unit, and remove roof deck and pilot house (replaced with roof hatch), updated zoning permit to ZP-2021-005654**
FOR THE ERECTION OF A NEW FOUR (4) STORY ATTACHED STRUCTURE (W/PRIVATE ROOF DECK ACCESSED BY PILOT HOUSES CONTAINING ACCESS STAIRS ONLY) TO BE USED AS GROUP R-2 (THREE (3) DWELLING UNITS), AS PER PLANS; SEPARATE PERMITS REQUIRED FOR ALL MEP/FSP WORK; BUILDING TO BE FULLY SPRINKLERED AS PER NFPA 13 W/STANDPIPES W/IN INTERIOR EXIT STAIRWAYS AS PER NFPA 14; SEE AP#1041995 FOR ZONING/USE APPROVAL; PEDESTRIAN PROTECTION AS PER 2018 IBC CH33 AND L&I CODE BULLETIN B-0503-R2.City of Philadelphia · 2021
Permitted projects on public record. Addresses are omitted for privacy.