What the public permit record shows, not self-reported reviews.
Is CARDELL STEVENSON JR a real contractor?
CARDELL STEVENSON JR appears in public building-permit records with 68 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is CARDELL STEVENSON JR's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to CARDELL STEVENSON JR by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is CARDELL STEVENSON JR licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. CARDELL STEVENSON JR has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is CARDELL STEVENSON JR's work?
The most recent permit on record for CARDELL STEVENSON JR is dated 2026-05-20, with 68 permits on file in total.
Replace existing 200 amp meter socketCity of Philadelphia · 2026
Install two 5/8-inch grounding rods, ensuring they are positioned six feet apart. Connect the grounding rod clamps and run a number 4 copper wire to the busbar.City of Philadelphia · 2026
New 200 AMP service.City of Philadelphia · 2026
New wiring throughout, new outlets, GFCI's and recessed lighting.City of Philadelphia · 2025
The electrical work to be performed consists of a complete rewire of a single-family residential home. This includes the removal of outdated or unsafe wiring and the installation of new wiring and components throughout the property to meet current NEC (National Electrical Code) standards. The scope of work includes the following:
1. General Rewiring
Complete removal and replacement of existing electrical wiring throughout the house.
Installation of new circuits and branch wiring as required for modern usage and code compliance.
2. Kitchen
Installation of new receptacles, including GFCI-protected outlets per code.
Dedicated circuits for major appliances (e.g., refrigerator, dishwasher, microwave, garbage disposal, and electric range, if applicable).
Wiring and installation of overhead lighting and under-cabinet lighting (if specified).
Proper grounding and bonding of all kitchen circuits.
3. Bedrooms (2)
Installation of new general-use receptacles in each bedroom per spacing requirements.
Installation of ceiling-mounted light fixtures or fan/light combos, controlled by wall switches.
AFCI protection for all bedroom circuits as required by code.
4. Bathrooms (1 Full, 1 Half)
Installation of GFCI-protected receptacles near sinks.
Wiring and installation of lighting fixtures (ceiling, vanity, and/or exhaust fan lighting).
Dedicated 20-amp circuits for bathroom receptacles as
Installation of general-use receptacles throughout, per NEC spacing guidelines.
Installation of ceiling or wall-mounted lighting, as specified.
ARC-fault protection for living room circuits.
5. Living Room
Installation of general-use receptacles throughout, per NEC spacing guidelines.
Installation of ceiling or wall-mounted lighting, as specified.
ARC-fault protection for living room circuits.
6. Lighting
Installation of new ceiling-mounted fixtures, recessed lighting, and switches throughout the home.
Wiring for three-way and single-pole switches, as needed.
7. Applianc
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you CARDELL STEVENSON JR?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to CARDELL STEVENSON JR's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2025
Installation of an EVC System to a single family or two-family dwelling with existing onsite parkingCity of Philadelphia · 2025
Install a new 60A, 240V circuit in the existing 100A main panel, utilizing an available breaker slot. Hardwire the ChargePoint Home Flex EV charging station.
The proposed wire route is from the panel, across the unfinished basement ceiling, then transitioned to the exterior of the home and under the roof eave of the front porch where the ChargePoint Home Flex charger will be hardwired to the exterior left side wall of the garage wall.
ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC AND THE EVC EZ STANDARDCity of Philadelphia · 2025
Addition of Recess lighting, Wet Bar, & Light FixturesCity of Philadelphia · 2025
Install 200 amp service with grounding. Install lighting, receptacles, power to equipment, and telecommunications wiring for new oil change facility as per 2017 NEC.City of Philadelphia · 2025
* The station will be installed in the rear of the property, in the property's driveway
* Install Emporia Ev Charging Station
* Install (1) 60A, 240V circuit in the 100A main panel.
* Run 6/3 wiring to the right side of the panel and hardwire the Emporia Pro Charger on the rear left exterior wall of the home adjacent to the garage.
* House Panel is on the opposite side of the wall within 5 ft
* Ensure the charger is at least 3' from any water or gas sources.City of Philadelphia · 2025
Mechanical / Fuel Gas Permit for combo RP-2024-007857City of Philadelphia · 2025
Electrical Permit for combo RP-2024-007857City of Philadelphia · 2025
Permitted projects on public record. Addresses are omitted for privacy.