What the public permit record shows, not self-reported reviews.
Is C MAZZONI BROS INC a real contractor?
C MAZZONI BROS INC appears in public building-permit records with 169 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is C MAZZONI BROS INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to C MAZZONI BROS INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is C MAZZONI BROS INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. C MAZZONI BROS INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is C MAZZONI BROS INC's work?
The most recent permit on record for C MAZZONI BROS INC is dated 2026-04-14, with 169 permits on file in total.
Repair a cracked cast iron stack.City of Philadelphia · 2026
Alteration of piping of two existing bathrooms one on the second floor and one on the third floor and alteration of a washing machine stand pipe.City of Philadelphia · 2026
Alteration of 2 small drains tub and lavatory, WC to remain in same location alter water lines as needed.City of Philadelphia · 2026
REPAIR/REPLACE 3/4" BACKFLOW DEVICE.City of Philadelphia · 2026
Installation of drainage system and domestic water hot and cold. Connect to existing drainage and cold water line. Install new water heater. Fixtures will be listed on the equipment section. All drainage to be cast and copper all domestic water to be type "L" copper. Under Others in the equipment schedule there is a drinking fountain.City of Philadelphia · 2025
REPLACE 3/4" BACKFLOW DEVICE.City of Philadelphia · 2025
INSTALL NEW FIXTURES WITH PIPING 1 KITCHEN SINK, 1 Shower, and 1 Washing machine standpipe in an existing unit, were the WC and lav, are existing.City of Philadelphia · 2025
Installation of a 3 floor sinks, 1 floor drain, 1 hand sink and 1 mop sink
Connect to existing sewer and domestic water.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you C MAZZONI BROS INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to C MAZZONI BROS INC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2025
INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES ROUGH TO FINISH. ALL WORK PERFORMED IN COMPLIANCE WITH 2018 PPC AND APPROVED PLANS.
TYPES OF FIXTURES: Plumbing LINES TO FIXTURES, 12-TOILETS, 12-LAVATORIES, 12-TUBS, 12-KITCHEN SINKS, 12-laundry sinks & 12-hot WATER HEATERS.
******************Amendment hot water tank locations, as requested by inspector********************City of Philadelphia · 2025
INTERIOR ALTERATION TO BAR AREA AND CREATION OF ADA COMPLIANT RESTROOM. EXISTING FIXTURES TO BE RELOCATED AND NEW FIXTURES TO BE PROVIDED ALONG WITH ALL ASSOCIATE PIPING PER PLANS. NO FOOD PREP FIXTURES WERE PROVIDED ON THIS PERMIT. ALL WORK TO BE PERFORMED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS.City of Philadelphia · 2025
INTERIOR ALTERATIONS TO SCHOOL. INSTALLATION OF DRAINAGE, WASTE, VENT AND WATER SUPPLY FOR LISTED FIXTURES CONNECTING TO AND UTILIZING METALLIC PIPING. VENTING SHALL BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. INSTALLATION OF GREASE INTERCEPTOR SHALL BE COMPLIANCE WITH MANUFACTURER SPECIFICATIONS AND CODE. ALL WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANS.City of Philadelphia · 2025
INSTALL 12 FLOOR DRAINS, 6 FLOOR SINKS, 1 TRENCH DRAIN, 1 AREA DRAIN, 1 ROOF DRAIN, 2 WATER CLOSETS, 2 LAVATORIES, 1 HOT WATER HEATER, 2 GREASE INTERCEPOR, 1 SUMP PUMP, 2 MOP SINKS, 1 UTILITY SINK, 4 HAND SINKS, 2 THREE COMPARTMENT SINKS. 1 NON FREEZE HOSE BIBB,
2 PREP SINKS, 1 ICE MACHINE, 1 BACKFLOW PREVENTER AND 1 HUB DRAIN ACCORDING TO THE 2018 PPC AND PER PLANS.City of Philadelphia · 2025
Permitted projects on public record. Addresses are omitted for privacy.