What the public permit record shows, not self-reported reviews.
Is BUNCH GROUP CO. a real contractor?
BUNCH GROUP CO. appears in public building-permit records with 12 permits filed through 2021 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is BUNCH GROUP CO.'s track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to BUNCH GROUP CO. by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is BUNCH GROUP CO. licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. BUNCH GROUP CO. has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is BUNCH GROUP CO.'s work?
The most recent permit on record for BUNCH GROUP CO. is dated 2021-12-29, with 12 permits on file in total.
FOR NEW CONSTRUCTION OF A FOUR (4) STORY WOOD-FRAME ATTACHED STRUCTURE ON REINFORCED CONCRETE FOOTINGS/FOUNDATIONS WITH ROOF DECKS AND ONE (1) INTERIOR GARAGE PARKING SPACE. FOR USE AS A SINGLE-FAMILY DWELLING THROUGHOUT. BUILDING SHALL BE FULLY SPRINKLERED (13R), SEPARATE PERMITS REQUIRED FOR ALL MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION SYSTEMS. *PROTECTION OF RIGHT-OF-WAY / PEDESTRIANS / ADJACENT PROPERTIES REQUIRED DURING ALL CONSTRUCTION. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.City of Philadelphia · 2021
FOR THE LEGALIZATION OF ALTERATIONS TO INCLUDE NEW RATED SHAFT ENCLOSURE ASSEMBLIES, NEW FIRE PARTITION WALLS, RATED FLOOR-CEILING ASSEMBLIES, INTERIOR PARTITION INSTALLATION, AND WALL/FLOOR/CEILING FINISHING. (IEBC 2018, CHANGE IN OCCUPANCY CLASSIFICATION, HIGHER HAZARD) **SEPARATE PERMITS TO BE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, AND FIRE SUPPRESSION SYSTEM INSTALLATIONS.**City of Philadelphia · 2020
This permit is to partially resolve the interior alterations of case violation: CF-2020-015342; Plumbing alterations require a separate Plumbing permit.
EZ PERMIT STANDARDS ALTERATIONS - For alterations to an Existing One Family Dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Structural alteration or repair is expressly prohibited under this permit. Prohibited structural work any modifications to exterior walls, party walls, floor/roof framing or foundations; including underpinning, excavation, and removal of foundation slab. NO WORK MAY BE PERFORMED IN THE BASEMENT OR CELLAR. Separate permits required for Mechanical, Electric and Plumbing. *CONTRACTOR HAS NO EMPLOYEES PER NOTARIZED LETTER*
For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 shall be in place prior to start of work.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you BUNCH GROUP CO.?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2020
MAKE SAFE PERMIT TO COMPLY WITH UNSAFE VIOLATION #721179 TO INCLUDE THE REPLACEMENT OF PORCH ROOF, REAR BAY, FLOOR & ROOF JOIST AND SHEATHING AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ADDITIONAL ALTERATIONS NOT SPECIFICALLY ADDRESSED IN ENGINEER'S REPORT/PLANS.City of Philadelphia · 2020
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.City of Philadelphia · 2020
REPAIR A HOLE IN THE ROOF FROM A FIRE WITH 5/8" FIRE-RETARDANT AS PER ENGINEER REPORT.City of Philadelphia · 2020
MAKE SAFE PERMIT TO COMPLY UNSAFE VIOLATION #721175 TO REMOVE AND REPAIR FLOOR AND ROOF JOISTS AT THE FRONT AND REAR, REPAIR FRONT PORCH AND BAY AS PER APPROVED ENGINEERED PLANS AND ENGINEER'S REPORT. SIZE AND LOCATION AS SHOWN ON PLANS. SEPARATE PERMIT REQUIRED FOR ALL OTHER WORK.City of Philadelphia · 2020
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Installation of (1) 2.5 ton Hvac unit as per EZ Standard See Case#718182City of Philadelphia · 2020
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- (1) HIGH EFFICIENCY WITH ASSOCIATED DUCTWORK-For the installation if New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.City of Philadelphia · 2019
EZ PERMIT DECKS- For New Decks to an Exiting One Family Dwelling as per attached standards. Deviations from these standards require submission of construction and site plans.CALL AND SCHEDULE AN INITIAL INSPECTION AND OBTAIN INSPECTOR'S PERMISSION TO START WORK.City of Philadelphia · 2019
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- FOUR HIGH EFFICIENCY HEATER, DUCTWORK AND AND AC UNITS IN THE BACK YARD-For the installation if New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.City of Philadelphia · 2019
INTERIOR ALTERATIONS AS PER ATTACHED PLAN.City of Philadelphia · 2019
Permitted projects on public record. Addresses are omitted for privacy.