What the public permit record shows, not self-reported reviews.
Is BLUE LINE CONSTRUCTION, LLC a real contractor?
BLUE LINE CONSTRUCTION, LLC appears in public building-permit records with 79 permits filed through 2025 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is BLUE LINE CONSTRUCTION, LLC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to BLUE LINE CONSTRUCTION, LLC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is BLUE LINE CONSTRUCTION, LLC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. BLUE LINE CONSTRUCTION, LLC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is BLUE LINE CONSTRUCTION, LLC's work?
The most recent permit on record for BLUE LINE CONSTRUCTION, LLC is dated 2025-05-16, with 79 permits on file in total.
For alterations to an Existing One Family Dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Separate permits are required for plumbing and electrical work and the installation of heating/cooling appliances. STRUCTURAL ALTERATION OR REPAIR IS EXPRESSLY PROHIBITED UNDER THIS PERMIT. PROHIBITED STRUCTURAL WORK INCLUDES ANY MODIFICATION TO EXTERIOR WALLS, PARTY WALLS, FLOOR/ROOF FRAMING OR FOUNDATIONS; INCLUDING UNDERPINNING, EXCAVATION, AND REMOVAL OF FOUNDATION SLAB. NO WORK MAY BE PERFORMED IN THE BASEMENT OR CELLAR.City of Philadelphia · 2025
FOR THE ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEOTECH REPORT. (UNDERPINNING NOT A PART OF THIS PERMIT). SEPARATE PERMITS REQUIRED FOR SPRINKLER (NFPA 13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C/O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.
AMENDMENT # 1:
AMEND TO REVISE LATERAL BRACING DESIGN IN THE STRUCTURAL PLANS AND CLARIFY PROPOSED FOOTINGS AT THE LEVEL OF ADJACENT FOOTINGS PER FIELD CONDITIONS.City of Philadelphia · 2024
Interior renovation and new second floor rear addition. details as shown on plan.City of Philadelphia · 2023
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13D) WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. EXCAVATION PERMIT, MUST BE ISSUED PRIOR TO THE START OF WORK. SP-2023-000994 must be issued first before work can start on this permit. **AMENDED 8/27/24-Amend framing plans for revisions to bracing all revisions noted on attached plans ***City of Philadelphia · 2023
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you BLUE LINE CONSTRUCTION, LLC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to BLUE LINE CONSTRUCTION, LLC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13D) WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. EXCAVATION PERMIT, MUST BE ISSUED PRIOR TO THE START OF WORK. *AMEND-Amend framing plans for revisions to bracing all revisions noted on attached plans. Additional detail of foundation as per plan.City of Philadelphia · 2023
Interior alterations only to existing two-story single-family residence., details as shown on plan.City of Philadelphia · 2023
FOR THE CONSTRUCTION OF EGRESS WELL AND ERECTION OF AN ADDITION ABOVE THE EXISTING ATTACHED STRUCTURE WITH ROOF DECK AND ROOF DECK ACCESS STRUCTURE. **AMENDMENT TO STAMP PLANS WITH CORRECT ADDRESS****AMENDMENT TO CHANGE FROM BASEMENT STEM WALL TO 2X6 WALL**City of Philadelphia · 2023
Extension of first floor 13'.5x5' , Extension of second and third floor 13'.5x13'.5. New roof deck 13'x32', maximum height 38ft. No underpinning work. details as shown in the plan.City of Philadelphia · 2022
For the addition of a roof deck above the first floor rear and interior alterations throughout an existing attached single family dwelling per plans. Separate permits required for all associated MEP work.
Amended 2/1/2023 to change location and design of the basement Emergency Escape and Rescue Opening.City of Philadelphia · 2022
FOR NEW CONSTRUCTION OF A FOUR (4) STORY WOOD-FRAME ATTACHED STRUCTURE ON REINFORCED CONCRETE FOOTINGS WITH A ROOF DECK AND ROOF DECK ACCESS STRUCTURE. FOR USE AS THREE (3) DWELLING UNITS AND VACANT COMMERCIAL SPACE AT GROUND FLOOR (MIN. 30'0" DEPTH). BUILDING SHALL BE FULLY SPRINKLERED PER NFPA 13 MIN IN THE COMMERCIAL SPACE AND 13R IN THE RESIDENTIAL PORTION. MIN OF CLASS I STANDPIPE SYSTEM TO BE PROVIDED PER NFPA14. FIRE ALARM SYSTEM TO BE INSTALLED PER 907.2.9.** SEPARATE PERMITS REQUIRED FOR ALL MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION SYSTEMS. **PROTECTION OF RIGHT-OF-WAY / PEDESTRIANS / ADJACENT PROPERTIES REQUIRED DURING ALL CONSTRUCTION.**ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. **City of Philadelphia · 2022
EZ PERMIT STANDARDS ALTERATIONS
For alterations to an Existing One Family Dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. STRUCTURAL ALTERATION OR REPAIR IS EXPRESSLY PROHIBITED UNDER THIS PERMIT. PROHIBITED STRUCTURAL WORK INCLUDES ANY MODIFICATION TO EXTERIOR WALLS, PARTY WALLS, FLOOR/ROOF FRAMING OR FOUNDATIONS; UNDERPINNING AND EXCAVATIONS (I.E. DIGGING IN BASEMENT). ANY WORK/ALTERATIONS TO THE BASEMENT/CELLAR IS EXPRESSLY PROHIBITED UNLESS DOCUMENTED AS AN EXISTING HABITABLE SPACE WITH HEIGHTS AND MEANS OF EGRESS PER CONDITIONS OF THE EZ STANDARD. Separate permits required for Mechanical, Electric and Plumbing, ETC.
Interior demolition, framing, Insulation, sheetrock, trim, doors, bathrooms and kitchen, hardwood floors throughout, paintCity of Philadelphia · 2022
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation if New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.
For the installation of new ductwork, registers/grilles/diffusers. Supply and install trunk duct along basement ceiling running up perimeter walls to outlet assemblies. Supply and install 2.5 ton coil and condenser with 72,000 BTU 80% AFUE gas furnace. There will be 7 diffusers/registers connected to new ductwork.City of Philadelphia · 2021
Permitted projects on public record. Addresses are omitted for privacy.