What the public permit record shows, not self-reported reviews.
Is BKG CONSTRUCTION INC a real contractor?
BKG CONSTRUCTION INC appears in public building-permit records with 9 permits filed through 2024 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is BKG CONSTRUCTION INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to BKG CONSTRUCTION INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is BKG CONSTRUCTION INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. BKG CONSTRUCTION INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is BKG CONSTRUCTION INC's work?
The most recent permit on record for BKG CONSTRUCTION INC is dated 2024-10-08, with 9 permits on file in total.
FOR A LEVEL II INTERIOR ALTERATIONS TO INCLUDE A CHANGE IN OCCUPANC. FOR THE CREATION OF A MULTI-FAMILY HOUSEHOLD LIVING FOR THREE (3) DWELLING UNITS. ALTERATIONS TO INCLUDE INSTALLATION OF NEW WALL PARTITIONS, PROVIDE FINISHES AND FURNISHING AS PER APPROVED PLANS. ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK**IEBC 2018**EXISTING BUILDING TO BE FULLY SPRINKLERED PER NFPA 13R MIN** SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK**City of Philadelphia · 2024
PERMIT STANDARDS ALTERATIONS
For alterations to an existing one family dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Structural alteration or repair is expressly prohibited under this permit. Prohibited structural work includes any modification to exterior walls, party walls, floor/roof framing or foundations, underpinning and excavations (i.e., digging in basement). Any work/alterations to the basement/cellar are expressly prohibited unless documented as an existing habitable space with heights and means of egress per conditions of the EZ standard. separate permits required for mechanical, electric and plumbing, etc.
*No basement alterations of any kind were proposed or approved for this permit*
*No structural alterations of any kind were proposed or approved for this permit*
APPROVED SCOPE OF WORK
THE APPROVED SCOPE OF WORK FOR THIS PERMIT IS LIMITED TO NON-STRUCTURAL ALTERATIONS THROUGHOUT THE FIRST AND SECOND FLOOR. A REPORT WITH A DETAILED SCOPE OF WORK PROVIDED BY THE PA LICENSED ENGINEER WHO PERFORMED THE ONSITE INSPECTION ON (1/8/24) AND STAMPED/SEALED THE DOCUMENT.City of Philadelphia · 2024
FOR ALTERATIONS THROUGHOUT AN EXISTING DETACHED STRUCTURE AND THE CONSTRUCTION OF A PAVILION AT THE REAR. ALL WORK TO BE DONE AS PER APPROVED PLANS AND IN ACCORDANCE WITH THE 2018 IRC. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. IF FIELD CONDITIONS VARY, CONTACT ENGINEER PRIOR TO START OF WORK.City of Philadelphia · 2023
FOR A REAR THREE-STORY ADDITION TO AN EXISTING STRUCTURE. WORK TO INCLUDE A LEVEL III INTERIOR ALTERATIONS WITH AN OCCUPANCY CHANGE TO A TWO-FAMILY HOUSEHOLD LIVING . ALTERATION TO INCLUDE THE DEMOLITION AND RECONSTRUCTION OF INTERIOR WALL PARTITIONS. **BUILDING TO BE FULLY SPRINKERED WITH NFPA 13R.*** ALL WORK TO BE PERFORMED PER APPROVED PLANS**IEBC 2018**
**SEPARATE PERMITS REQUIRED FOR ANY MECHANICAL,ELECTRICAL,PLUMBING OR FIRE SUPPRESSION WORK**ANY DEVIATION TO THE APPROVED SCOPE OF WORK WILL REQUIRE AN AMENDED PERMIT**AMENDED AS OF 4/20/2022 FOR A CHANGE IN FOUNDATION MATERIAL AND FOR THE ADDITION OF A BATHROOM IN THE BASEMENT.**AMENDED AS OF 3/14/2023 FOR A LAYOUT MODIFICATION AS PER APPROVED PLANS**
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you BKG CONSTRUCTION INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to BKG CONSTRUCTION INC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2021
Permit to comply with case no. 626766. For the demolition of the rear one (1) / two (2) story portion of an existing three (3) story structure, remove side foundation wall, temporary shoring on this permits, remove all interior partitions, and new rear exterior wall as per approved plans. Abutting sidewalk must be closed with fencing a minimum of 6’ in height. Separate Streets Department permit required for sidewalk closure. A separate permit is required for any additional alterations that are not specifically addressed on case #626766City of Philadelphia · 2020
Interior Alterations to include sheetrock,doors windows (same openings) floors painting kitchen cabinets. Applicant agrees to limit the construction to comply with EZ Permit Standard for Interior Alterations, dated January 2011. Deviation from the Standard will result in revocation of this permit and imposition of further penalties. All necessary mechanical, electrical, plumbing and fire suppression permits to be obtained, as necessary.City of Philadelphia · 2019
FOR THE ERECTION OF NEW WIND SCREEN AT FRONT FACADE AND PARIAL SIDE FACADE CONSISTING OF 2'X10' CEMENT PANELS OVER 2"X2"X1/8" STEEL ANGLES ATTACHED TO EXISTING EXTERIOR WALL 220'X16'=3520SQ FT TOTAL ERECT NEW CONCRETE ENTRANCE AND HC RAMP AND FOR ERECTING NEW 500 SF TOTAL ENTRANCE CANOPY AS PER DRAWINGS WITHIN PROPERTY LINE.NO SIGNS ON THIS PERMIT.City of Philadelphia · 2019
EZ PERMIT STANDARDS ALTERATIONS- For alterations to an Existing One Family Dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans.City of Philadelphia · 2018
ERECT NEW 3 STORY REAR ADDITION AND THE REMOVAL OF MORE THAN TWO-THIRDS OF THE STRUCTURAL FRAMING AND MODIFICATION TO THE EXTERIOR WALLS AND THE RE-CONSTRUCTION OF THE STRUCTURE ON THE EXISTING FOUNDATION TO EXISTING SEMI-DETACHED STRUCTURE.City of Philadelphia · 2018
Permitted projects on public record. Addresses are omitted for privacy.