What the public permit record shows, not self-reported reviews.
Is BINSKY & SNYDER LLC a real contractor?
BINSKY & SNYDER LLC appears in public building-permit records with 142 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is BINSKY & SNYDER LLC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to BINSKY & SNYDER LLC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is BINSKY & SNYDER LLC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. BINSKY & SNYDER LLC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is BINSKY & SNYDER LLC's work?
The most recent permit on record for BINSKY & SNYDER LLC is dated 2026-03-23, with 142 permits on file in total.
FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND EXHUST FANS WITH ASSOCIATED DUCTWORK TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2026
Furnish and install steam to hot water heaters. Furnish and install sump pump, hot water recirc. pump, all fixtures shown and scheduled on drawings including water closets, lavatories, showers, sinks, urinals, electric water cooler, mop receptor, floor and trench
drains and grease interceptor. Furnish and install backflow prevention devices and pressure-reducing valves, as required. Furnish and install all plumbing piping, including domestic water, sanitary waste, sanitary
vents, and indirect waste.City of Philadelphia · 2026
FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, HYDRONIC PIPING AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.City of Philadelphia · 2026
FOR THE INSTALLATION OF APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK. *NO REGISTERS, DIFFUSERS ON THIS PERMIT.City of Philadelphia · 2026
This permit application is for the fit-out of the above ground plumbing for Sanitary and domestic water piping with new plumbing fixtures.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you BINSKY & SNYDER LLC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to BINSKY & SNYDER LLC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2025
INSTALL 2 LAVATORIES, 1 FLOOR DRAIN, 1 SHOWER, 2 MOP SINK AND 1 SUMP PUMP ACCORDING TO THE 2018 PPC AND PER PLANS.City of Philadelphia · 2025
Demo existing Sink and Install new Scrub SinkCity of Philadelphia · 2025
For installation of new HAVC appliances for the additional manufacturing work stations and support spaces on the 1st floor as per approved plans. Separate mechanical permit required for the interior ductwork.City of Philadelphia · 2025
Plumbing renovations to first floor of Tuttleman medical office building. INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR 22 FIXTURES. ALL WORK PERFORMED IN COMPLIANCE WITH 2018 PPC AND APPROVED PLANSCity of Philadelphia · 2025
FOR THE INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS.City of Philadelphia · 2025
FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2025
FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2024
Permitted projects on public record. Addresses are omitted for privacy.