What the public permit record shows, not self-reported reviews.
Is BH BUILDERS LLC a real contractor?
BH BUILDERS LLC appears in public building-permit records with 17 permits filed through 2024 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is BH BUILDERS LLC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to BH BUILDERS LLC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is BH BUILDERS LLC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. BH BUILDERS LLC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is BH BUILDERS LLC's work?
The most recent permit on record for BH BUILDERS LLC is dated 2024-12-06, with 17 permits on file in total.
FOR INSTALLATION OF HVAC SYSTEM AS PER APPROVED PLANS.City of Philadelphia · 2024
RENOVATION OF TWO-FAMILY DWELLING. **MAINTAIN ONE-HOUR FIRE RATING AND FIRE-RATED RATED DOORS BETWEEN UNITS AND INCLUDING CEILINGS, CORRIDORS AND UNDERSIDE OF STAIRS SEPERATING UNITS**City of Philadelphia · 2024
Mechanical / Fuel Gas Permit for combo CP-2022-000229City of Philadelphia · 2022
Mechanical / Fuel Gas Permit for combo CP-2022-001695City of Philadelphia · 2022
**Amendment dated 01/31/2023 to document existing foundation conditions and propose reinforcements and new slabs without underpinning.**
For the erection of a three (3) story addition to the rear and above and existing two (2) story attached structure, to be used as Group R-2 (Seven (7) Dwelling Units) throughout, as per plans; separate permits required for all MEP/FSP work; building to be fully sprinklered throughout in accordance with NFPA 13; covered walkway or sidewalk closure shall be required within nine (9) feet of the building facade in accordance with Section 3306 of the 2018 IBC; see ZP-2021-010644 for zoning/use approval; see SP-2022-012447 for approval of work within the public right-of-way.City of Philadelphia · 2022
NEW CONSTRUCTION OF A THREE (3) STORY MULTI-FAMILY DWELLING (IBC 2018) AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED WITH NFPA 13R SYSTEM.
**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**City of Philadelphia · 2022
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you BH BUILDERS LLC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
FOR THE INSTALLATION OF HVAC APPLICANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS.City of Philadelphia · 2022
FOR A NEW MECHANICAL INSTALLATION . WORK TO INCLUDE THE INSTALLATION OF REGISTERS, DIFFUSERS AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.City of Philadelphia · 2022
FOR NEW CONSTRUCTION OF A THREE-STORY WOOD-FRAME ATTACHED STRUCTURE ON REINFORCED CONCRETE FOOTINGS/FOUNDATIONS WITH A ROOF DECK AND A ROOF DECK ACCESS STRUCTURE. SCOPE OF WORK ALSO TO INCLUDE ONE (1) INTERIOR ACCESSORY GARAGE PARKING SPACE. FOR USE AS A MULTI-FAMILY HOUSEHOLD LIVING FOR THREE(3) DWELLING THROUGHOUT. BUILDING SHALL BE FULLY SPRINKLERED AS PER NFPA 13R. SEPARATE PERMITS REQUIRED FOR ALL MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION SYSTEMS. **PROTECTION OF RIGHT-OF-WAY / PEDESTRIANS / ADJACENT PROPERTIES REQUIRED DURING ALL CONSTRUCTION.**ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. **PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.**City of Philadelphia · 2022
NEW CONSTRUCTION OF A THREE (3) STORY BUILDING FOR USE AS FIVE (5) DWELLING UNITS AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED. *2018 IBC REVIEW*
**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**City of Philadelphia · 2021
FOR THE INSTALLATION A NEW MECHANICAL INSTALLATION AS PE APPROVED PLANS.City of Philadelphia · 2021
NEW CONSTRUCTION OF A THREE (3) STORY VACANT COMMERCIAL (SEPARATE USE REGISTRATION AND CO REQUIRED PRIOR TO OCCUPANCY) ON THE FIRST FLOOR AND MULTI-FAMILY HOUSEHOLD LIVING (THREE (3) DWELLING UNITS) ABOVE AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED WITH NFPA 13 SYSTEM. **SEPARATE PERMITS ARE REQUIRED FOR ALL OTHER WORK**City of Philadelphia · 2021
Permitted projects on public record. Addresses are omitted for privacy.