Install 200A service w/ 2 ganged meter socketCity of Philadelphia · 2024
Remove incorrect wiring, upgrade outlets, switches, light fixtures, GFCI outlets.City of Philadelphia · 2024
Install 600A service and meter-bank. Wire throughout. All emergency lighting and exit,110v interconnected smoke alarms. Install complete fire alarm system. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72,2018 PHILA FIRE CODE.City of Philadelphia · 2023
1 80 KVA generator gas powered to supply temp power to 2- 60 amp spider boxes with 6 outlets each to supply 12 120v extension cords as per 2017 NEC. Permit valid through December 18th.City of Philadelphia · 2023
Install temporary electrical power for 4 120V outlets with GFCI protections as per 2017 necCity of Philadelphia · 2022
200 amp electrical service as per 2017 necCity of Philadelphia · 2021
ELECTRICAL: 2-400 KW GENERATOR RUNS AT 208V FOR CONCESSIONS, OFFICE, SOUND AREA. LIGHTING IN SHOW& BOX OFFICE FROM 10/25/21 TO 11/15/2021. AS PER 2017 NEC.City of Philadelphia · 2021
INSTALL 200AMP 1PH, 120/240V MAIN SERVICE. INSTALL 40 CIRCUIT MAIN BREAKER PANEL. INSTALL ALL WIRING THROUGHOUT SFD. INSTALL CABLE TV WIRING AS PER 2014 NEC
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2021
EZ ALTERATION AND REPAIR TO INCLUDE PAINT, INSTALLATION OF LIGHTS, LIGHT FIXTURES, SIGNAGE AND REPLACEMENT OF BATHROOM EQUIPMENT.City of Philadelphia · 2020
COMPLETE WORK ISSUED ON PREVIOUS ELECTRICAL PERMIT (1019114) CONSIST OF GROUNDING AND BONDING ELECTRICAL SYSTEM DISTRIBUTION FOR BUILDING.
REPLACE INOPERABLE FIRE ALARM SYSTEM SMOKE ALARM AND PULLSTATION ON 1ST FLR. AS PER 2017 NEC AND NFPA 72City of Philadelphia · 2020
APPLY 911 STICKERS AT PULL STATIONS IN MAIN HALLWAY REPLACE BATTERIES IN FACP AND REACTIVATE A/C POWER INSTALL PULL STATION AT 1ST FLOOR APT EXT/ENTRANCE AS PER 2016 NFPA 72. INSTALL HEATER ON EXPOSED WIRING IN BATHROOM AS PER 2017 NEC.City of Philadelphia · 2020
Install 2-light switches,9-120v outlet receptacles,25-light fixtures and repair 3-existing light fixtures only on an existing service.City of Philadelphia · 2020
Permitted projects on public record. Addresses are omitted for privacy.