What the public permit record shows, not self-reported reviews.
Is Belltown Construction LLC a real contractor?
Belltown Construction LLC appears in public building-permit records with 4 permits filed through 2022 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is Belltown Construction LLC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to Belltown Construction LLC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is Belltown Construction LLC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. Belltown Construction LLC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is Belltown Construction LLC's work?
The most recent permit on record for Belltown Construction LLC is dated 2022-10-24, with 4 permits on file in total.
FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK FOR PREVIOUSLY APPROVED USE. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2022
FOR THE ERECTION OF AN ATTACHED THREE STORY BUILDING FOR USE AS THE FOLLOWING: MULTI-FAMILY HOUSEHOLD LIVING FOR FIVE(5) DWELLING UNITS AND A VACANT COMMERCIAL SPACE AT THE GROUND FLOOR (SEPARATE INTERIOR FITOUT AND C.O REQUIRED PRIOR TO OCCUPANCY) OF THE STRUCTURE WITHIN 30' OF BUILDING DEPTH. BUILDING IS FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 9 FEET OF THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.*** SEPARATE PERMIITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2021
FOR LEVEL II ALTERATION WITHOUT CHANGE OF OCCUPANCY CLASSIFICATION TO AN EXISTING 4 DWELLING UNITS WITH EXISTING STRUCTURE. BUILDING IS NOT REQUIRED TO BE SPRINKLERED. ASBESTOS TO BE REMOVED PRIOR TO START OF THE WORK. SEPARATE PERMITS REQUIRED FOR MEP WORK.City of Philadelphia · 2021
FOR THE ERECTION OF A THREE STORY STRUCTURE FOR USE AS A VACANT COMMERCIAL SPACE WITH A TWO FAMILY DWELLING THROUGHOUT. STRUCTURE CONTAINS ROOF DECK OVER THIRD STORY PORTION ACCESSED BY ROOF DECK ACCESS STRUCTURE ACCESSED BY UNIT 2 ONLY. BUILDING IS SPRINKLERED IN ACCORDANCE WITH NFPA 13. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 10 FEET OF THE BUILDING FAÇADE IN ACCORDANCE WITH SECTION 3306 OF THE 2009 IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.***IBC 2018***
*3/29/2023; AMEND PLANS FOR RE-CONFIGURED LAYOUT, STRUCTURE AND ACCESSIBILITY*
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you Belltown Construction LLC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to Belltown Construction LLC's website. It links to this profile so homeowners can see the public permit record behind your work.