What the public permit record shows, not self-reported reviews.
Is Bekim Daku a real contractor?
Bekim Daku appears in public building-permit records with 23 permits filed through 2024 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is Bekim Daku's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to Bekim Daku by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is Bekim Daku licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. Bekim Daku has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is Bekim Daku's work?
The most recent permit on record for Bekim Daku is dated 2024-01-07, with 23 permits on file in total.
FOR THE ERECTION OF AN ATTACHED THREE STORY STRUCTURE FOR USE AS A SINGLE FAMILY HOUSEHOLD LIVING. BUILDING TO BE SPRINKLERED IN ACCORDANCE WITH NFPA 13D. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 9 FEET (1/4TH OF HEIGHT OF BUILDING) OF THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.** BLOWER DOOR TESTING SHALL BE PERFORMED IN ACCORDANCE WITH ASTM E 779 OR ASTM E 1827 BY AN APPROVED THIRD PARTY AGENCY
**SPECIAL INSPECTIONS REQUIRED FOR UNPERPINNING, STRUCTURAL OBSERVATION, CONCRETE AND SOILS **City of Philadelphia · 2024
FOR THE ERECTION OF AN ATTACHED STRUCTURE WITH A ROOF DECK AND A ROOF DECK ACCESS STRUCTURE. SIZE AND LOCATION PER PLAN.
**AMENDMENT 7/9/2024 FOR FOOTPRINT CHANGES, PILOT HOUSE RELOCATION, AND ADDITION OF ROOF DECK ACCESSED BY 3RD FLOOR.City of Philadelphia · 2023
FOR PROPOSED EASEMENT BETWEEN 308 & 310 W PORTER ST AND FOR THE ERECTION OF AN ATTACHED STRUCTURE WITH ROOF DECK AND ROOF DECK ACCESS STRUCTURE. SIZE AND LOCATION AS SHOWN IN PLAN.
*AMENDMENT 7/9/24 FOR FOOTPRINT CHANGE, 3RD FLOOR SETBACK, PILOT HOUSE RELOCATION, AND ROOF DECK ACCESS AT 3RD FLOOR.City of Philadelphia · 2023
For the erection of two roof deck additions and interior alterations throughout an existing attaches single family dwelling per plans. Work to include underpinning of the existing foundation and the addition of an egress well from the basement level. Separate permits are required for all associated MEP work.City of Philadelphia · 2023
FOR THE ERECTION OF A ROOF DECK AND ROOF DECK ACCESS STRUCTURE ABOVE THIRD FLOOR OF AN EXISTING ATTACHED BUILDING (SIZE AND LOCATION AS SHOWN ON PLANS).
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you Bekim Daku?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2022
FOR THE ERECTION OF AN ATTACHED STRUCTURE, ROOF DECK AND ROOF DECK ACCESS STRUCTURE. SIZE AND LOCATION AS SHOWN IN THE APPLICATION/PLANS.City of Philadelphia · 2022
FOR THE ERECTION OF AN ATTACHED STRUCTURE WITH ROOF DECK AND ROOF DECK ACCESS STRUCTURE. SIZE AND LOCATION AS SHOWN IN APPLICATION/PLANS.City of Philadelphia · 2022
FOR THE ERECTION OF AN ATTACHED STRUCTURE, ROOF DECK AND ROOF DECK ACCESS STRUCTURE. SIZE AND LOCATION AS SHOWN IN THE APPLICATION/PLANS.City of Philadelphia · 2022
FOR CONSTRUCTION OF A THREE-STORY ATTACHED STRUCTURE WITH A BASEMENT AND ROOF DECK ACCESSED BY A ROOF DECK ACCESS STRUCTURE AS PER APPROVED PLAN; FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING; SHEETING AND SHORING AS PRESCRIBED IN THE GEOTECH REPORT; SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING, AND SPRINKLER SYSTEM (MINIMUM 13D) WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IRC. PRIOR TO ISSUANCE OF C/O, SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED, BOTH TO BE COMPLETED BY AN APPROVED PARTY.City of Philadelphia · 2022
NEW CONSTRUCTION OF A FOUR (4) STORY, FIFTEEN (15) FAMILY DWELLING AND VACANT COMMERCIAL (SEPARATE USE AND OCCUPANCY REQUIRED) WITH ROOF DECK, GREEN ROOF AND ROOF DECK ACCESS STRUCTURES AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13. SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK. *2018 IBC REVIEW*City of Philadelphia · 2021
For the erection of a three story attached single family dwelling that includes a roof decks above the second and third floors, a roof access structure and a full basement. Size and locations per plans. Separate permits required for all Mechanical, Electrical, Plumbing and Fire Suppression work. Building to be fully sprinklered per NFPA 13D.City of Philadelphia · 2021
For the erection of a three story attached single family dwelling that includes a roof decks above the second and third floors, a roof access structure and a full basement. Size and locations per plans. Separate permits required for all Mechanical, Electrical, Plumbing and Fire Suppression work. Building to be fully sprinklered per NFPA 13D.City of Philadelphia · 2021
Permitted projects on public record. Addresses are omitted for privacy.