What the public permit record shows, not self-reported reviews.
Is Angel Oak Construction LLC a real contractor?
Angel Oak Construction LLC appears in public building-permit records with 21 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is Angel Oak Construction LLC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to Angel Oak Construction LLC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is Angel Oak Construction LLC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. Angel Oak Construction LLC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is Angel Oak Construction LLC's work?
The most recent permit on record for Angel Oak Construction LLC is dated 2026-05-21, with 21 permits on file in total.
FOR THE ERECTION OF A TWO (2) STORY ATTACHED STRUCTURE WITH BASEMENT FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3). BUILDING TO BE FULLY SPRINKLERED PER NFPA 13D. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, FIRE SUPPRESSION, AND EXCAVATION WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O., SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.City of Philadelphia · 2026
FOR THE ERECTION OF AN ATTACHED TWO (2) STORY BUILDING FOR THE USE OF SINGLE FAMILY DWELLING. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC.
***DEED MUST BE RECORDED PRIOR TO THE ISSUANCE OF CO****City of Philadelphia · 2026
FOR THE ERECTION OF A TWO (2) STORY ATTACHED STRUCTURE WITH BASEMENT FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3). BUILDING TO BE FULLY SPRINKLERED PER NFPA 13D. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, FIRE SUPPRESSION, AND EXCAVATION WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O., SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.City of Philadelphia · 2026
FOR THE ERECTION OF AN ATTACHED TWO (2) STORY BUILDING FOR THE USE OF SINGLE FAMILY DWELLING. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC.City of Philadelphia · 2026
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you Angel Oak Construction LLC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to Angel Oak Construction LLC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
FOR THE ERECTION OF A TWO (2) STORY ATTACHED STRUCTURE WITH BASEMENT FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3). BUILDING TO BE FULLY SPRINKLERED PER NFPA 13D. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, FIRE SUPPRESSION, AND EXCAVATION WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O., SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.City of Philadelphia · 2026
FOR THE ERECTION OF A TWO (2) STORY ATTACHED STRUCTURE WITH BASEMENT FOR USE AS A SINGLE-FAMILY DWELLING (GROUP R-3). BUILDING TO BE FULLY SPRINKLERED PER NFPA 13D. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IRC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, FIRE SUPPRESSION, AND EXCAVATION WORK. ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O., SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.City of Philadelphia · 2026
FOR THE CONSTRUCTION OF A DETACHED STRUCTURE WITH CELLAR. FOR USE AS A SINGLE-FAMILY HOUSEHOLD LIVING. AS PER APPROVED PLANS. ********************SEPARATE PERMITS FOR ELECTRICAL, PLUMBING, OR MECHANICAL WORK. ************************************City of Philadelphia · 2026
FOR THE ERECTION OF AN ATTACHED TWO (2) STORY BUILDING FOR THE USE OF SINGLE FAMILY DWELLING. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC.City of Philadelphia · 2026
FOR THE ERECTION OF AN ATTACHED TWO (2) STORY BUILDING FOR THE USE OF SINGLE FAMILY DWELLING. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC.City of Philadelphia · 2026
FOR THE ERECTION OF AN ATTACHED TWO (2) STORY BUILDING FOR THE USE OF SINGLE FAMILY DWELLING. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC.City of Philadelphia · 2026
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. (UNDERPINNNING IS NOT PART OF THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.City of Philadelphia · 2024
ERECTION OF AN ATTACHED STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR SPRINKLER (13D) WORK. (UNDERPINNNING IS NOT PART OF THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2018 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.City of Philadelphia · 2024
Permitted projects on public record. Addresses are omitted for privacy.