INSTALL TELECOMMUNICATION WIRING. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC.City of Philadelphia · 2025
INSTALL A 600AF / 500AT CIRCUIT BREAKER IN THE EXISTING SUBSTATION. INSTALL A 600 AMP 277/480V 3 PHASE PANEL & FEEDER. INSTALL A 225KVA TRANSFORMER & FEEDER TO THE 800 AMP 120/208V 3 PHASE PANEL. PROVIDE CONDUITS & PULL STRINGS TO THE FUTURE EV CHARGER LOCATIONS. INSTALL THE SITE LIGHTING, TIME CLOCK & CONTROLS. PROVIDE 120V POWER FOR THE (21) AUTOMATIC DOOR OPERATORS & ELECTRIC STRIKES.
ALL WORK IN ACCORDANCE WITH THE 2017 NEC.
* THE INSTALLATION OF THE EV CHARGER EQUIPMENT & CIRCUITING IS NOT INCLUDED ON THIS PERMIT.City of Philadelphia · 2025
Replacement of existing 100A Service. Replace cable meter pan and panel. All work involves surface mounting of cable.City of Philadelphia · 2024
Rough-In Permit for EP-2024-008252 • Provide and install new 3R rated HV, LV, and Transformer gear package per drawings dated 7.12.24.
• Provide and install new conduits and wiring to HV, LV, and Transformer panels per plans.
• Provide and install conduits only from new switchboards to island locations per drawings. EV chargers and wiring will be added at a later date under a separate permit
• Provide and install new communications conduits per drawings.
• Provide and install new pull boxes per drawings.
• Provide and install new 120VAC 20A circuits for 21 automatic operators per drawings dated 6.25.24.
• Provide and install 21 new 24VDC electric strikes.
• Provide and install interface with automatic operators.
• Provide and install approximately 2000’ new 1” underground PVC conduits per site drawings dated 7.12.24. All excavation and backfilling by others.
• Provide and install new lighting package per plans.
• Provide and install new wiring and pull boxes as required.
• Provide and install card readers for 50 new access control doors.
• Provide and install 37 new electric strikes.
• Provide and install 22 Request to exit detectors.
• Interface w electrified hardware for 13 doors provided by others.
• Provide and install 3 new Galaxy Door Controllers.
• Provide and install network drops for new controllers.
• Provide and install new structured access control cable to all doors.
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2024
Replace existing 100A service cable and meter socket. All work involves surface mounting cable. Work
AS PER NEC 2017City of Philadelphia · 2024
Replacment of 100 Amp Service.City of Philadelphia · 2024
FOR LEVEL 1 ALTERATIONS TO AN EXISTING ASSISTED LIVING FACILITY, ALTERATIONS TO INCLUDE THE ERECTION OF SECURITY HARDWARE, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
** LEVEL 1 ALTERATIONS SHALL BE DONE IN A MANNER THAT MAINTAINS THE LEVEL OF FIRE PROTECTION PROVIDED AS REQUIRED BY SECTION 703.1 OF THE 2018 IEBC **City of Philadelphia · 2023
Installation of two (2) 12 Volt Electronic Locks and Electronic Keypads. Install Magnetic Locks, Keypads, Power Supply, and Associated Wiring as per 2017 necCity of Philadelphia · 2023
Replace lighting and controls. Relocate switches, wiring and receptacles associated w partition demolition/relocation. Install new tele-data drops per drawings as per 2017 NEC.City of Philadelphia · 2023
Installation of two (2) medium voltage primary distribution sub-stations per plans
Installation of 15kv primary feeder cables from existing sub-station
Installation of 480v and 208v busway per plans
Installation of house distribution panels per plans
Installation of 350kw generator.
Installation of transfer equipment and associated distribution panels per plans
Provide temporary construction lighting and power (208/120V 200A temporary service )
** SEPARATE FIRE ALARM PERMIT REQ'D & INTERIOR WIRING OF UNITS** - DIESEL ENGINE FIRE PUMP INSTALLED UNDER #906825-City of Philadelphia · 2022
Installation of power supply for two free standing signs per 2017 NEC.City of Philadelphia · 2020
Installation of tele/data wiring and racks for 212 drops - installation of overhead end equipment and (80) speakers. Installation of wander prevention system alarm system for (5) doors. Installation of nurse call system for (46) new pull cords. Installation of burglar alarm system for (50) new devices, including keypads, motion detectors, door contacts, glass break detectors, etc. Installation of new access control system for (44) card readers and associated peripheral devices and head equipment. All work to be performed as per engineered drawings and 2017 NEC.City of Philadelphia · 2020
Permitted projects on public record. Addresses are omitted for privacy.