What the public permit record shows, not self-reported reviews.
Is ALVARO CLAVIJO a real contractor?
ALVARO CLAVIJO appears in public building-permit records with 8 permits filed through 2025 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is ALVARO CLAVIJO's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to ALVARO CLAVIJO by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is ALVARO CLAVIJO licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. ALVARO CLAVIJO has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is ALVARO CLAVIJO's work?
The most recent permit on record for ALVARO CLAVIJO is dated 2025-08-25, with 8 permits on file in total.
FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.City of Philadelphia · 2025
FOR COMPLETE CHANGE OF OCCUPANCY TO R-2 AND INTERIOR ALTERATION TO INCLUDE THE REPAIR / REPLACEMENT OF WATER DAMAGE DRYWALLS, FINISHES, AND REPLACEMENT OF ENTRANCE DOORS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
**SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING & FIRE SUPPRESSION WORK**City of Philadelphia · 2024
In accordance with Code Bulletin PM-1801, a PA professional engineer is required to monitor repairs made under this permit. The engineer must submit a sealed statement to the Department confirming that the structure is in sound condition at completion.” MAKE SAFE PERMIT - For the structural repair and weather-sealing of the roof, to resolve case #CF-2022-053479 . Separate Streets Department permit (IF REQUIRED) for sidewalk closure. A Separate permit is required for any additional alterations that are not specifically addressed on case #CF-2022-053479 .City of Philadelphia · 2022
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation if New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. HVAC 2 bedroom home. 2 ton 24000 BTU new ductwork 6 registers condenser rear on slabCity of Philadelphia · 2021
Addition of single story sunroom at ground level. Foundation uses concrete footings (no basement below). details as per plan.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you ALVARO CLAVIJO?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2021
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For Mechanical Work to include the installation as per attached standards. Deviations from these standards require submission of construction and site plans.City of Philadelphia · 2021
EZ PERMIT STANDARDS ALTERATIONS - For alterations to an Existing One Family Dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Structural alteration or repair is expressly prohibited under this permit. Prohibited structural work any modifications to exterior walls, party walls, floor/roof framing or foundations; including underpinning, excavation, and removal of foundation slab. NO WORK MAY BE PERFORMED IN THE BASEMENT OR CELLAR. Separate permits required for Mechanical, Electric and Plumbing. Demolition of existing flooring, install new flooring, demolition of non-bearing walls, new non-bearing walls, new Electric, plumbing, & HVAC (will hire licensed trade person, new paint & gypsum wallboard.City of Philadelphia · 2021
MAKE SAFE PERMIT- FOR REPAIR OF FIREDAMAGED ROOF, SIDE BAY, AND INTERIOR FRAMING AS PER ENGINEER'S PLAN TO RESOLVE CASE CF-2020-019211. ABUTTING SIDEWALK MUST BE CLOSED WITH FENCING A MINIMUM OF 6? IN HEIGHT. SEPARATE STREETS DEPARTMENT PERMIT REQUIRED FOR SIDEWALK CLOSURE. A SEPARATE PERMIT IS REQUIRED FOR ANY ADDITIONAL ALTERATIONS THAT ARE NOT SPECIFICALLY ADDRESSED ON CASE CF-2020-019211. No fit out on this permit.City of Philadelphia · 2020
Permitted projects on public record. Addresses are omitted for privacy.