What the public permit record shows, not self-reported reviews.
Is ALTUS DEVELOPMENT INC a real contractor?
ALTUS DEVELOPMENT INC appears in public building-permit records with 101 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is ALTUS DEVELOPMENT INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to ALTUS DEVELOPMENT INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is ALTUS DEVELOPMENT INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. ALTUS DEVELOPMENT INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is ALTUS DEVELOPMENT INC's work?
The most recent permit on record for ALTUS DEVELOPMENT INC is dated 2026-05-15, with 101 permits on file in total.
FOR THE ERECTION OF AN ATTACHED STRUCTURE TO INCLUDE A ROOF DECK AND ROOF DECK ACCESS STRUCTURE. SIZE AND LOCATION AS SHOWN IN PLANS.City of Philadelphia · 2026
Mechanical / Fuel Gas Permit for combo RP-2025-009834City of Philadelphia · 2026
FOR THE NEW CONSTRUCTION OF AN ATTACHED THREE (3) STORY BUILDING WITH A ROOF DECK AND ROOF DECK ACCESS STRUCTURE FOR THE USE OF SINGLE FAMILY DWELLING. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.City of Philadelphia · 2026
OR THE ERECTION OF AN ATTACHED STRUCTURE, ROOF DECK AND ROOF DECK ACCESS STRUCTURE. FOR USE AS A SINGLE FAMILY HOUSEHOLD LIVING. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13D. SEPARATE PERMITS REQUIRED FOR MEP & FP WORK.City of Philadelphia · 2025
FOR THE ERECTION OF AN ATTACHED NEW STRUCTURE WITH A CELLAR AND AN ACCESSORY ROOF DECK (FOR RESIDENTIAL USE ONLY) WITH ROOF ACCESS STRUCTURE. SIZE AND LOCATION AS SHOWN IN THE APPLICATION / PLAN.City of Philadelphia · 2025
FOR INSTALLATION OF HVAC SYSTEM AS PER APPROVED PLANS.City of Philadelphia · 2025
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.
MINI-SPLIT SYSTEM. 1 OUTDOOR AC CONDENSER, 5 INDOOR AC FAN COILS
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you ALTUS DEVELOPMENT INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to ALTUS DEVELOPMENT INC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2025
FOR THE ERECTION OF AN ATTACHED THREE (3) STORY STRUCTURE. FOR USE AS MULTI-FAMILY HOUSEHOLD LIVING CONTAINING THREE (3) DWELLING UNITS. BUILDING IS FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13R THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN NINE (9) FEET OF THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.** SEPARATE PERMIITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2025
FOR THE ERECTION OF A THREE (3) STORY ATTACHED STRUCTURE AS PER APPROVED PLANS. FOR USE AS THREE (3) DWELLING UNITS. STRUCTURE TO BE FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13R MINIMUM. **SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK.** **2018 IBC**City of Philadelphia · 2025
FOR THE ERECTION OF AN ATTACHED STRUCTURE, ROOF DECK AND ROOF DECK ACCESS STRUCTURE. SIZE & LOCATION AS SHOWN ON THE APPLICATION/PLANS.
**1-7-2025 AMENDMENT - REMOVING FRONT BAY AT 2ND FLOOR (COMPLIANT GFA REDUCTION)
**10-16-2025 AMENDMENT - COMPLIANT CHANGE IN BUILDING HEIGHT & DOCUMENTING REVISED BASEMENT DEPTH.City of Philadelphia · 2024
FOR THE ERECTION OF AN ATTACHED STRUCTURE. SIZE AND LOCATION AS SHOWN IN THE APPLICATION/PLANS.City of Philadelphia · 2024
*AMENDMENT 8/7/2025 TO REMOVE COVERED PORCH AND MODIFICATION TO ROOF DECK ACCESS STRUCTURE.
ORIGNIAL: FOR THE ERECTION OF AN ATTACHED STRUCTURE WITH PORCH, ROOF DECKS, AND ROOF DECK ACCESS STRUCTURES. SIZE AND LOCATION AS SHOWN IN PLAN.City of Philadelphia · 2024
Permitted projects on public record. Addresses are omitted for privacy.