What the public permit record shows, not self-reported reviews.
Is ALLIANCE ENVIRONMENTAL SYS INC a real contractor?
ALLIANCE ENVIRONMENTAL SYS INC appears in public building-permit records with 16 permits filed through 2024 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is ALLIANCE ENVIRONMENTAL SYS INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to ALLIANCE ENVIRONMENTAL SYS INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is ALLIANCE ENVIRONMENTAL SYS INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. ALLIANCE ENVIRONMENTAL SYS INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is ALLIANCE ENVIRONMENTAL SYS INC's work?
The most recent permit on record for ALLIANCE ENVIRONMENTAL SYS INC is dated 2024-09-17, with 16 permits on file in total.
FOR THE COMPLETE DEMOLITION OF A ONE (1) STORY EXISTING DETACHED STRUCTURE. DEMOLITION TO BE DONE WITH MECHANICAL EQUIPMENT. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH SITE SAFETY DEMOLITION PLAN AND SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. ASBESTOS ABATEMENT REQUIRED PRIOR TO START OF WORK. ANY DEVIATION WILL REQUIRE AN AMENDED PERMIT. IF SITE CONDITIONS VARY, CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK.City of Philadelphia · 2024
FOR THE COMPLETE DEMOLITION OF ALL STRUCTURES ON THE SAME LOT TO CREATE A FULLY VACANT LOT. (SITE PLAN NOT SUBMITTED).City of Philadelphia · 2024
FOR THE COMPLETE DEMOLITION OF EXISTING STRUCTURES BY MECHANICAL EQUIPMENT PER APPROVED PLANS. NO DISTURBANCE ALLOWED WITHIN THE FLOOD ZONE. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES.
* A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMITS ARE REQUIRED.
* 21 DAY POSTING AND NOTICE REQUIRED PER A-303.2
* NEWLY EXPOSED WALLS TO BE TREATEDCity of Philadelphia · 2024
PARTIAL DEMOLITION OF 1 STORY MASONRY STRUCTURE. STRUCTURAL TO BE DEMOLISHED BY BOTH HAND AND MECHANICAL.
PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. SEPARATE STREETS DEPARTMENT APPROVAL REQUIRED FOR SIDEWALK CLOSURECity of Philadelphia · 2021
COMPLETE DEMOLITION OF ONE (1) STORY OF DETACHED GARAGE BUILDING OF MASONRY BEARING WALL & STEEL FRAME CONSTRUCTION PER APPROVED DEMOLITION SITE SAFETY PLAN VIA HANDHELD & MECHANICAL MEANS INCLUDING PARTIAL SITEWORK FOR REMOVAL OF EXIST. SLAB-ON-GRADE/ASPHALT PAVING FOR FUTURE BUILDING CONSTRUCTION. DEMOLITION WORK TO BE PERFORMED IN ACCORDANCE W/ ALL APPLICABLE PROVISIONS OF THE PHILADELPHIA CODE. SEPARATE PERMIT REQ'D FROM STREETS DEPARTMENT FOR ANY CLOSURE OF ADJOINING PUBLIC RIGHT-OF-WAY IN ACCORDANCE WITH CHP. 33 OF THE PHILA. BLDG. CODE.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you ALLIANCE ENVIRONMENTAL SYS INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to ALLIANCE ENVIRONMENTAL SYS INC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2019
EZ INTERIOR DEMOLITION- FOR THE INTERIOR DEMOLITION OF NON LOAD-BEARING PARTITION WALLS AND CEILINGS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.City of Philadelphia · 2017
FOR THE COMPLETE DEMOLITION OF FOUR (4) EXISTING DETACHED ACCESSORY STRUCTURES. SIZE AND LOCATION AS SHOWN IN APPLICATION.
**SEE A/P 796017 FOR PLANS**City of Philadelphia · 2017
COMPLETE DEMOLITION OF FOUR (4) ONE STORY, MASONRY, CONCRETE & WOOD ACCESSORY POOL BUILDINGS BY MECHANICAL METHODS. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. NO SIDEWALK CLOSURE REQUIRED. ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT. *PERMIT RECEIVED FROM DOWNSTAIRS*City of Philadelphia · 2017
MAKE SAFE PERMIT - REMOVE DEBRIS FROM COLLAPSED RETAINING WALL TO COMPLY CASE #578895. NO OTHER WORK ON THIS PERMIT. *PERMIT RECEIVED FROM DOWNSTAIRS 7/17/17*City of Philadelphia · 2017
FOR THE COMPLETE DEMOLITION OF AN EXISTING BUILDING ON SITE (ONE (1)- ONE (1) STORY BUILDING PORTION) AS SHOWN PER APPROVED PLANS AND SUBMITTED DOCUMENTATION. WORK MUST COMPLY WITH CODE BULLETIN B-1032.IF FIELD CONDITIONS VARY, CONTACT STRUCTURAL ENGINEER PRIOR TO THE START OF ANY WORK. SAFETY PLAN MUST BE ON SITE AT ALL TIMES.City of Philadelphia · 2014
PERFORM SELECTIVE INTERIOR DEMOLITION OF CEILINGS, WALLS, AND FLOORINGCity of Philadelphia · 2014
INTERIOR DEMO TO RETAIL STORE.City of Philadelphia · 2011
Permitted projects on public record. Addresses are omitted for privacy.