What the public permit record shows, not self-reported reviews.
Is ALL STATE SERVICES LLC a real contractor?
ALL STATE SERVICES LLC appears in public building-permit records with 268 permits filed through 2024 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is ALL STATE SERVICES LLC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to ALL STATE SERVICES LLC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is ALL STATE SERVICES LLC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. ALL STATE SERVICES LLC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is ALL STATE SERVICES LLC's work?
The most recent permit on record for ALL STATE SERVICES LLC is dated 2024-02-13, with 268 permits on file in total.
FOR THE COMPLETE DEMOLITION OF AN EXISTING ATTACHED TWO (2) STORY MASONRY STRUCTURE. STRUCTURE TO BE DEMOLISHED BY MECHANICAL ONLY. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO THE START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. SEPARATE STREETS DEPARTMENT APPROVAL REQUIRED FOR SIDEWALK CLOSURECity of Philadelphia · 2024
FOR LEVEL II ALTERATIONS TO AN EXISTING ATTACHED STRUCTURE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS,
PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT.
FOR USE AS GENERAL INDUSTRIAL. ALL WORK TO BE DONE PER APPROVED PLANS AND DOCUMENTATION.
***************** SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. ******************************************City of Philadelphia · 2024
FOR THE COMPLETE DEMOLITION OF THE EXISTING THREE (3) STORY ATTACHED MASONRY STRUCTURE. DEMOLITION TO BE DONE BY HAND AND WITH HAND TOOLS ONLY. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN AND SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. 21 DAY POSTING & NOTICE REQUIRED PER A-303.2.
* A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED IN ACCORDANCE WITH SECTION 3306 OF THE IBC.
* FOUNDATIONS AND SLAB TO BE REMOVED IN ACCORDANCE WITH B-3303.12 AND SITE BACKFILLED IN ACCORDANCE WITH B-3303.4.1 OF THE PHILADELPHIA BUILDING CODE.
**PROTECTION OF ADJACENT STRUCTURES TO BE MAINTAINED DURING DEMOLITION ACTIVITIES. SCOPE INCLUDES SPECIAL INSPECTIONS OF STRUCTURAL STABILITY OF ADJACENT STRUCTURES IN ACCORDANCE WITH B-1704.6.4.**City of Philadelphia · 2024
FOR THE COMPLETE DEMOLITION OF AN EXISTING THREE (3) STORY MASONRY STRUCTURE.STRUCTURE TO BE DEMOLISHED BY HAND ONLY. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO THE START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. SEPARATE STREETS DEPARTMENT APPROVAL REQUIRED FOR SIDEWALK CLOSURE
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you ALL STATE SERVICES LLC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to ALL STATE SERVICES LLC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2023
For the complete demolition of an existing structure.City of Philadelphia · 2023
FOR THE COMPLETE DEMOLITION OF AN EXISTING MASONRY AND WOOD TWO-STORY STRUCTURE BY HAND AND MECHANICAL METHODS. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. COMPLETE SIDEWALK CLOSURE REQUIRED AS REFLECTED ON APPROVED SITE PLAN AND IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE STREET CLOSURE PERMIT REQUIRED PRIOR TO START OF WORK. ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT.City of Philadelphia · 2023
**MAKE SAFE PERMIT** FOR REPAIRS TO INCLUDE RECONSTRUCTION OF FIRE-DAMAGED CHURCH STEEPLE, REALIGNMENT OF OUT-OF-PLUMB BEARING WALLS, AND THE INSTALLATION OF 3/4 INCH SUPPORTING STEEL RODS WITH TURNBUCKLES TO COMPLY WITH VIOLATION CASES # CF-2022-073646 AND CF-2023-022039. NOT TO EXCEED SCOPE OF WORK NOTED IN ENGINEER'S REPORT AND SHOWN ON APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ANY ADDITIONAL ALTERATIONS THAT ARE NOT SPECIFICALLY ADDRESSED ON CASES # CF-2022-073646 AND CF-2023-022039. IN ACCORDANCE WITH CODE BULLETIN PM-1801, A PA PROFESSIONAL ENGINEER IS REQUIRED TO MONITOR REPAIRS MADE UNDER THIS PERMIT. THE ENGINEER MUST SUBMIT A SEALED STATEMENT TO THE DEPARTMENT CONFIRMING THAT THE STRUCTURE IS IN SOUND CONDITION AT COMPLETION. MAKE SAFE PERMIT ONLY.City of Philadelphia · 2023
FOR THE COMPLETE DEMOLITION OF THE DETACHED ONE-STORY AND TWO-STORY STRUCTURE BY MECHANICAL METHODS. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. *21 DAY POSING AND NOTICE WAIVED PER A-303.2 *A SAFETY ZONE SHALL BE REQUIRED WITHIN MIN 12 FEET OF BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE IBC.City of Philadelphia · 2023
FOR THE COMPLETE DEMOLITION OF ONE (1) EXISTING ATTACHED TWO (2) STORY STRUCTURE BY HAND DEMOLITION ONLY. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN & SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN SIX (6) FEET OF BUILDING FACADES IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMITS ARE REQUIRED. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK.City of Philadelphia · 2023
FOR THE COMPLETE DEMOLITION OF AN ATTACHED THREE STORY STRUCTURE BY HAND AND HAND HELD DEVICES. ALL PERMITTED DEMOLITION ACTIVITY TO BE DONE IN ACCORDANCE WITH SITE SAFETY DEMOLITION PLAN AND SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES. *PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. *SEPERATE STREETS DEPARTMENT PERMIT REQUIRED FOR CLOSURE OF RIGHT OF WAY. *21 DAY POSTING AND NOTICE REQUIRED PER A-303.2.City of Philadelphia · 2023
MAKE SAFE PERMIT TO COMPLY WITH CASE #CF-2022-015743- FOR THE REPAIR TO THE FRONT FACADE OF AN EXISTING STRUCTURE. ALL WORK TO BE PERFORMED AS PER ENGINEER'S REPORT. ABUTTING SIDEWALK MUST BE CLOSED WITH FENCING A MINIMUM OF 6' IN HEIGHT. SEPARATE STREETS DEPARTMENT PERMIT REQUIRED FOR SIDEWALK CLOSURE. A SEPARATE PERMIT IS REQUIRED FOR ANY ADDITIONAL ALTERATIONS THAT ARE NOT SPECIFICALLY ADDRESSED ON CASE #CF-2022-015743-. IN ACCORDANCE WITH CODE BULLETIN PM-1801, A PA PROFESSIONAL ENGINEER IS REQUIRED TO MONITOR REPAIRS MADE UNDER THIS PERMIT. THE ENGINEER MUST SUBMIT A SEALED STATEMENT TO THE DEPARTMENT CONFIRMING THAT THE STRUCTURE IS IN SOUND CONDITION AT COMPLETION.**SELECTED SPECIAL INPECTIONS TO BE MONITORED AT ALL TIME BY THE APPROVED SPECIAL INSPECTION AGENCY**City of Philadelphia · 2023
FOR THE COMPLETE DEMOLITION OF A FOUR (4) STORY STRUCTURE OF TYPE V-B CONSTRUCTION WITH FOUNDATION WALLS TO REMAIN (NO SLAB). DEMOLITION TO BE DONE BY HAND AND WITH HAND TOOLS ONLY. ALL PERMITTED DEMOLITION ACTIVITY TO BE IN ACCORDANCE WITH APPROVED SITE SAFETY DEMOLITION PLAN AND SUCH PLAN TO BE MAINTAINED ON SITE AT ALL TIMES IN ACCORDANCE WITH PHILADELPHIA ADMINISTRATIVE CODE. ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES. IF SITE CONDITIONS VARY, CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK.
* 21 DAY POSTING & NOTICE REQUIRED PER A-303.2.1.
* A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED IN ACCORDANCE WITH SECTION 3306 OF THE IBC.
* ANY NEWLY EXPOSED WALLS TO BE TREATED
* FOUNDATIONS TO REMAIN AND SITE NOT BACKFILLED - SEE RP-2022-006533 FOR NEW CONSTRUCTION ON EXISTING FOUNDATION. IF CONSTRUCTION DOES NOT BEGIN WITHIN THIRTY (30) DAYS OF COMPLETION OF DEMOLITION WORK, FOUNDATIONS TO BE REMOVED IN ACCORDANCE WITH B-3303.12 AND SITE BACKFILLED IN ACCORDANCE WITH B-3303.4.1 OF THE PHILADELPHIA BUILDING CODE.City of Philadelphia · 2023
Permitted projects on public record. Addresses are omitted for privacy.