What the public permit record shows, not self-reported reviews.
Is ALAN K VERNON a real contractor?
ALAN K VERNON appears in public building-permit records with 55 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is ALAN K VERNON's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to ALAN K VERNON by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is ALAN K VERNON licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. ALAN K VERNON has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is ALAN K VERNON's work?
The most recent permit on record for ALAN K VERNON is dated 2026-04-21, with 55 permits on file in total.
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.
Replace existing boiler. NO DUCTWORK.City of Philadelphia · 2026
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.
Replace existing furnace. NO DUCTWORK.City of Philadelphia · 2026
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.
Replace existing boiler. NO DUCTWORK.City of Philadelphia · 2026
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required.
Replace existing gas hot water boiler with new 84% eff, 67000 btu gas boiler. NO OTHER WORK PERMITTED ON THIS PERMIT. No penetrations to fire-rated assemblies. NO NEW DUCTWORK proposed on ductwork or common areasCity of Philadelphia · 2025
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required.
Replace the existing gas-fired furnace 90, 000 btu 80% eff, NO OTHER WORK PERMITTED ON THIS PERMIT. No penetrations to fire-rated assemblies. NO NEW DUCTWORK proposed on ductwork or common areas
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you ALAN K VERNON?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2025
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required.
Replace existing hot water heating system boiler with new gas-fired boiler 83% eff, 67,000 btu. NO OTHER WORK PERMITTED ON THIS PERMIT. No penetrations to fire-rated assemblies. NO NEW DUCTWORK proposed on ductwork or common areasCity of Philadelphia · 2025
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required.
Replace existing hot water heating system boiler with new gas-fired boiler 83% eff, 67,000 btu. NO OTHER WORK PERMITTED ON THIS PERMIT. No penetrations to fire-rated assemblies. NO NEW DUCTWORK proposed on ductwork or common areasCity of Philadelphia · 2025
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required.
Replace existing hot water heating system boiler with new gas-fired boiler 83% eff, 67,000 btu. NO OTHER WORK PERMITTED ON THIS PERMIT. No penetrations to fire-rated assemblies. NO NEW DUCTWORK proposed on ductwork or common areasCity of Philadelphia · 2025
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES.
Replace existing boiler with new.City of Philadelphia · 2025
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation if New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.
Gas furnace replacement. No ductwork. 80k btuCity of Philadelphia · 2025
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation if New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.
Replace gas boiler. No ductwork.City of Philadelphia · 2025
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation if New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.
Replace gas furnace. No ductwork. 80k btu.City of Philadelphia · 2025
Permitted projects on public record. Addresses are omitted for privacy.