What the public permit record shows, not self-reported reviews.
Is AIR MASTER INC a real contractor?
AIR MASTER INC appears in public building-permit records with 58 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is AIR MASTER INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to AIR MASTER INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is AIR MASTER INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. AIR MASTER INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is AIR MASTER INC's work?
The most recent permit on record for AIR MASTER INC is dated 2026-04-10, with 58 permits on file in total.
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.
Replace existing furnace and AC unit only, in like and kind, no new ductworkCity of Philadelphia · 2026
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.
(2) 3 zone ductless mini splits, both have 3 indoor mini splits attachedCity of Philadelphia · 2026
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. EACH
Swap out of existing HVAC system in same locations in home.
Carrier Outdoor Condenser Model: 37MUHAQ48AA3
Carrier Indoor Coil CAAMP4821AMACity of Philadelphia · 2026
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.
Any new or replacement exterior equipment or lines/conduit shall be located in areas that are not visible from surrounding public rights-of-way(As per PHC conditions).
Replace existing gas furnace and AC only, in like & kind, reusing the existing ductwork, gas line, and electrical. Also installing a 2-zone high wall cassette to one condenser.
ANY NEW DUCTWORK WILL REQUIRE A VALID BUILDING PERMITCity of Philadelphia · 2025
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.
Two 4 zone ductless mini split condensers, one unit has 4 indoors mini splits attached and the other has 3 indoor mini splits attached.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you AIR MASTER INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2025
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.
2 zone Mitsubishi ceiling cassette to one condenser installation.City of Philadelphia · 2025
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.
Replace existing furnace and condenser only, in like & kind, using existing ductwork.
ANY NEW DUCTWORK WILL REQUIRE A VALID BUILDING PERMIT.City of Philadelphia · 2025
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES.
Gas furnace, a/c coil and condenser replacement, reusing the existing ductwork, electrical, and gas line.City of Philadelphia · 2025
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.
Replace existing furnace and AC unit only, in like and kind, using existing ductwork. No new ductwork.City of Philadelphia · 2025
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. Additional permits may be required.
Run lineset in ground and mount one 9k BTU existing mini split head that will be moved from house to addition area and re-connected to existing outdoor minsplit unit.City of Philadelphia · 2025
Mechanical / Fuel Gas Permit for combo RP-2024-002869City of Philadelphia · 2025
*PHC*-SEE PHC APPROVAL FOR APPLICANCE PLACEMENT***
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For Mechanical Work to include the installation as per attached standards. Deviations from these standards require submission of construction and site plans. *RP-2024-009987*
- Installation of 2 zone mini-split system that consists of two 9,000 btu indoor units and one 20,000 outdoor unit.
- Installation of three gas systems:
Second floor system: Installation of 2 stage 96% 60 tbtu Carrier gas furnace with 3 ton AC.
Basement: Installation of 2 stage 96% 60 tbtu Carrier gas furnace with single stage 1.5 ton AC.
Installation of 2 stage 96% 60 tbtu Carrier gas furnace with single stage 2 ton AC.City of Philadelphia · 2025
Permitted projects on public record. Addresses are omitted for privacy.