What the public permit record shows, not self-reported reviews.
Is ADELPHIA DEMOLITION INC a real contractor?
ADELPHIA DEMOLITION INC appears in public building-permit records with 55 permits filed through 2020 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is ADELPHIA DEMOLITION INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to ADELPHIA DEMOLITION INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is ADELPHIA DEMOLITION INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. ADELPHIA DEMOLITION INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is ADELPHIA DEMOLITION INC's work?
The most recent permit on record for ADELPHIA DEMOLITION INC is dated 2020-03-12, with 55 permits on file in total.
MORE THAN 2/3RD STRUCTURE ..... DEMOLITION OF EXISTING STRUCTURECity of Philadelphia · 2020
MAKE SAFE PERMIT- FOR STRUCTURAL BRACING TO STABILIZE FREESTANDING EXTERIOR WALLS TO PARTIALLY RESOLVE CASE 718130. ABUTTING SIDEWALK MUST BE CLOSED WITH FENCING A MINIMUM OF 6' IN HEIGHT. SEPARATE STREETS DEPARTMENT PERMIT REQUIRED FOR SIDEWALK CLOSURE. A SEPARATE PERMIT IS REQUIRED FOR ANY ADDITIONAL ALTERATIONS THAT ARE NOT SPECIFICALLY ADDRESSED ON CASE 718130. IN ACCORDANCE WITH CODE BULLETIN PM-1801, A PA PROFESSIONAL ENGINEER IS REQUIRED TO MONITOR REPAIRS MADE UNDER THIS PERMIT. THE ENGINEER MUST SUBMIT A SEALED STATEMENT TO THE DEPARTMENT CONFIRMING THAT THE STRUCTURE IS IN SOUND CONDITION AT COMPLETION."City of Philadelphia · 2020
INTERIOR DEMOLITION THRU OUT. INTERIOR DEMOLITION OF NON-LOAD BEARING WALLS ONLY, NO STRUCTURAL WORK ON THIS PERMIT. APPLICANT AGREES TO LIMIT THE DEMOLITION TO COMPLY WITH EZ INTERIOR DEMOLITION PERMIT STANDARDS. NOTE: STRUCTURAL ALTERATION OR REPAIR IS EXPRESSLY PROHIBITED UNDER THIS PERMIT. PROHIBITED STRUCTURAL WORK INCLUDES ANY MODIFICATION TO EXTERIOR WALLS, PARTY WALLS, FLOOR/ROOF, FRAMING OR FOUNDATIONS; UNDERPINNING AND EXCAVATIONS (I.E. DIGGING IN BASEMENT.) (DEVIATION FROM THE STANDARD WILL RESULT IN REVOCATION OF THIS PERMIT AND IMPOSITION OF FURTHER PENALTIES.) SEPARATE PERMITS REQUIRED FOR PLUMBING ELECTRICAL AND MECHANICAL WORK. NO OTHER WORK ALLOWED UNDER THIS PERMIT.City of Philadelphia · 2020
FOR THE COMPLETE DEMOLITION OF AN EXISTING ATTACHED STRUCTURE.
FOR USE AS A VACANT LOT.City of Philadelphia · 2020
COMPLETE DEMOLITION OF A DETACHED TWO STORY STRUCTURE. A SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 7 FEET OF BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE STREET CLOSURE PERMIT REQUIRED PRIOR TO START OF WORK. ANY DEVIATION WILL REQUIRE AN AMENDED BUILDING PERMIT. DEMOLITION SHALL COMPLY CASE NO. 680702.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you ADELPHIA DEMOLITION INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to ADELPHIA DEMOLITION INC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2019
FOR COMPLETE DEMOLITION (MORE THAN 2/3 OF THE JOISTS AND A WALL) OF EXISTING ATTACHED STRUCTURE. FOR USE AS VACANT LOT.City of Philadelphia · 2019
FOR THE COMPLETE DEMOLITION OF AN ATTACHED BUILDING.
NO USE ON PROPERTY. SEPARATE USE REGISTRATION PERMIT REQUIRED PRIOR TO OCCUPANCY.City of Philadelphia · 2019
FOR THE COMPLETE DEMOLITION OF AN EXISTING STRUCTURE. STRUCTURE TO BE DEMOLISHED BY HAND AND WITH HAND-HELD TOOLS ONLY. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURING ALL DEMOLITION ACTIVITIES.
* A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED IN ACCORDANCE WITH SECTION 3306 OF THE IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMITS ARE REQUIRED.
* 21 DAY POSTING AND NOTICE REQUIRED PER A-303.2
* NEWLY EXPOSED WALLS TO BE TREATEDCity of Philadelphia · 2019
COMPLETE DEMOLITION OF EXISTING TWO STORY STRUCTURE TO COMPLY WITH VIOLATION# 68946City of Philadelphia · 2019
FOR THE COMPLETE DEMOLITION FOR REMOVAL OF MORE THAN 2/3 OF STRUCTURE.City of Philadelphia · 2019
FOR THE DOCUMENTATION OF A COMPLETED DEMOLITION OF AN ATTACHED STRUCTURE WITH EXISTING SLAB TO REMAIN.City of Philadelphia · 2019
FOR THE COMPLETE DEMOLITION OF A DETACHED BUILDING.
SEPARATE USE REGISTRATION PERMIT REQUIRED PRIOR TO OCCUPANCY.City of Philadelphia · 2019
Permitted projects on public record. Addresses are omitted for privacy.