What the public permit record shows, not self-reported reviews.
Is ABENEZER FRANCIS a real contractor?
ABENEZER FRANCIS appears in public building-permit records with 12 permits filed through 2025 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is ABENEZER FRANCIS's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to ABENEZER FRANCIS by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is ABENEZER FRANCIS licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. ABENEZER FRANCIS has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is ABENEZER FRANCIS's work?
The most recent permit on record for ABENEZER FRANCIS is dated 2025-09-02, with 12 permits on file in total.
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.
REPLACING EXISTING GAS FURNACE & CONDENSER ONLY, IN LIKE & KIND, NO NEW DUCTWORK OR REGIS/DIFFUSERS.City of Philadelphia · 2025
FOR THE REPLACEMENT OF ROOF AND ROOF JOIST AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.City of Philadelphia · 2025
FOR INSTALLATION OF HVAC SYSTEM TO SERVE THE MIXED-USE BUILDING AS PER APPROVED PLANS.City of Philadelphia · 2025
For alterations to an Existing One Family Dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Separate permits are required for plumbing and electrical work and the installation of heating/cooling appliances. STRUCTURAL ALTERATION OR REPAIR IS EXPRESSLY PROHIBITED UNDER THIS PERMIT. PROHIBITED STRUCTURAL WORK INCLUDES ANY MODIFICATION TO EXTERIOR WALLS, PARTY WALLS, FLOOR/ROOF FRAMING OR FOUNDATIONS; INCLUDING UNDERPINNING, EXCAVATION, AND REMOVAL OF FOUNDATION SLAB. NO WORK MAY BE PERFORMED IN THE BASEMENT OR CELLAR.City of Philadelphia · 2025
For level III alteration with partial change of occupancy classification to create a prepare food shop (The number of seats shall be greater than 3 but shall not exceed 20 seats). The 2nd floor to be used for accessory office to the prepare food shop bussiness only. Building is not required to be sprinklered. Separate permits required for MEP work.City of Philadelphia · 2024
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you ABENEZER FRANCIS?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to ABENEZER FRANCIS's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
FOR THE INSTALLATION OF ONE (1) 9'-2" TYPE I HOOD IN A RESTAURANT WITH EXHAUST FAN AND A MAKE UP AIR FAN WITH ASSOCIATED DUCTWORK AND THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR HOOD FIRE SUPPRESSION SYSTEM AND ALL OTHER WORK.
City of Philadelphia · 2022
LEVEL II ALTERATIONS WITH PARTIAL CHANGE OF OCCUPANCY TO CREATE A SIT-DOWN RESTAURANT (GROUP B, LESS THAN 50) IN AN EXISTING ONE-STORY BUILDING WITH BASEMENT AS PER APPROVED PLANS. BUILDING NOT REQUIRED TO BE SPRINKLERED. *2018 IEBC REVIEW*
**SEPARATE PERMITS REQUIRED FOR ANY MEP WORK**City of Philadelphia · 2022
MAKE SAFE PERMIT TO COMPLY WITH CASE# 663744 TO INCLUDE REPAIRS TO AN EXISTING STRUCTURE. WORK TO INCLUDE THE REMOVAL AND REPLACEMENT OF FLOOR JOISTS AS PER APPROVED PLAN AND ENGINEER'S REPORT. ABUTTING SIDEWALK MUST BE CLOSED WITH FENCING A MINIMUM OF 6' IN HEIGHT. SEPARATE STREETS DEPARTMENT PERMIT REQUIRED FOR SIDEWALK CLOSURE. A SEPARATE PERMIT IS REQUIRED FOR ANY ADDITIONAL ALTERATIONS THAT ARE NOT SPECIFICALLY ADDRESSED ON CASE #663744.** ALL WORK TO BE LIMITED TO THE STRUCTURAL SAFETY OF THE STRUCTURE**SPECIAL INSPECTIONS TO BE MONITORED AT ALL TIME BY THE SELECTED SPECIAL INSPECTION AGENCY/ INDIVIDUAL.City of Philadelphia · 2021
INSTALL NEW SHEETROCK.INSTALL FRAMING FOR NON LOAD BRREARING WALLS INSTALL NEW 3/4 PLYWOOD ON FLOORING. INSTALL KITCHEN CABINETS & INSTALL NEW STEPS TO SECOND & BASEMENT. REPLACE WINDOWS. REPLACE DAMAGED JOIST. INSTAL NEW HVAC MECHANICAL & DUCTOWRK. INSTALL INTERIOR DOORS.City of Philadelphia · 2019
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation if New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans.City of Philadelphia · 2019
FOR THE PARTIAL DEMOLITION AND ERECTION OF A NEW REAR ADDITION ON AN EXISTING LIGHT-FRAMED STRUCTURE TO INCLUDE INSTALLATION OF NEW FOUNDATION SYSTEM, ROOF DECK STRUCTURE, GUARDRAILS, LINTEL AT OPENING FOR PRIVATE GARAGE, EXTERIOR SPIRAL STAIR, CONCRETE BOLLARDS, RATED EXTERIOR FENESTRATIONS, INTERIOR PARTITION WALLS, NEW RATED OPENING PROTECTIVES, INSULATED EXTERIOR WALL ASSEMBLIES, AND WALL/FLOOR/CEILING FINISHING. **SEPARATE PERMITS REQ'D FOR ELECTRICAL AND PLUMBING WORK.**City of Philadelphia · 2018
FOR THE ERECTION OF A ONE STORY REAR ADDITION TO AN EXISTING STRUCTURE FOR USE AS A SINGLE FAMILY DWELLING. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL AND PLUMBING WORK.City of Philadelphia · 2016
Permitted projects on public record. Addresses are omitted for privacy.