Is A.B.M. ELECTRIC CORP a real contractor?
A.B.M. ELECTRIC CORP appears in public building-permit records with 47 permits filed through 2023 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is A.B.M. ELECTRIC CORP's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to A.B.M. ELECTRIC CORP by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is A.B.M. ELECTRIC CORP licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. A.B.M. ELECTRIC CORP has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is A.B.M. ELECTRIC CORP's work?
The most recent permit on record for A.B.M. ELECTRIC CORP is dated 2023-03-16, with 47 permits on file in total.
Replacement of 13KV service from PECO to service equipment with 5" PVC conduit, #2 copper 15K PECO-approved jacketed cable.
Service to be replaced is a primary service, 13,200 volts rated at 100 amps using PECO approved cable. I will be happy to clarify if needed, at 215-416-5562.
As per 2017 necCity of Philadelphia · 2023
Electrical work for interior alterations of dialysis facility. Work includes demolition, installation of circuit breakers, extended branch wiring for receptacles and switches using hospital grade devices, installation of PVC conduit to nurses' station, installation of lighting fixtures and lighting control with occupancy sensors and dimmers, removal and re-installation of one horn strobe fixture, supply and installation of Cat 6 wiring, boxes and jacks, 24-port patch panel with 6 feet of patch cables, installation of boxes, plates and sleeves for TV, and sawcutting and patching of floors for conduit installation.City of Philadelphia · 2020
REPLACEMENT OF ONE DAMAGED 24" CONCRETE BASE OF EXT LIGHTING POLE IN PARKING LOT OF SNYDER PLAZA SHOPPING CENTER--REMOVE DAMAGED CONCRETE BASE BELOW GRADE, APPRX 6 FEET. INSTALL NEW 24" SONATUBE AND 1/2" REBAR APPRX 6' BELOW GRADE AND 3' .'17 NEC.City of Philadelphia · 2020
SUPPLY AND INSTALL 5" PVC CONDUIT AND 15KV #2 PECO-APPROVED CABLE, FROM PROPERTY LINE UP TO THE 15KV SERVICE IN A 3' DEEP TRENCH TO REPLACE THE DEFECTIVE SERVICE CABLES, AS PER 2017 NEC (City of Philadelphia · 2019
ON AN EXISTING SERVICE,REPLACEMENT IN KIND OF A 200AMP CIRCUITS BREAKER PANEL THAT FEEDS BOTH A/C AND HEAT ONLY AS PER 2008 NEC (SOUTH DISTRICT)City of Philadelphia · 2018
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you A.B.M. ELECTRIC CORP?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to A.B.M. ELECTRIC CORP's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
INSTALLATION OF 60AMP SUB PANEL, 25 RECEPTACLES, AND 50 LIGHT FIXTURES AS PER 2008 NEC (NORTH DISTRICT)
City of Philadelphia · 2018
COMMERCIAL STRIP STORES. REMOVAL OF 25 EXISTING FIXTURES UNDER CANOPY, THEN INSTALL NEW 40 WATT CANOPY LED LIGHT FIXTURES. DISCONNECT AND REMOVE FLUORESCENT LIGHT FIXTURES ALONG PERIMETER OF CANOPY.City of Philadelphia · 2017
SUPPLY AND ISNTALL FOUR SUB-PANELS, WIRING FOR NORMAL AND EMERGENCY RECEPTACLES,LIGHTING CIRCUITS AND XRAY ROOM WITH 80 AMP SHUNT TRIP BREAKER, AS PER PLANS**NO FIRE ALARM ON THIS PERMIT**City of Philadelphia · 2017
COMPLETE INSTALLATION OF SERVICE SRVC PANEL, RECEPTACLES LIGHTING NURSE CALL CCTV AND PHONE AS PER DRAWINGSCity of Philadelphia · 2017
INSTALL 200AMP 208/120 VOLT 3PHASE 4-WIRE SUB FEEDER FROM THE MDP TO SOOAMP 208/120 VOLT 3PHASE NEMA 3R CKT BREAKER PANEL OUTSIDE AND INSTALL 8-25AMP 208 VOLT 1 PHASE CKT TO CONDENSING UNITS & 1-OUTDOOE GFI RECEPT AS PER 2008 EAST DISTRICTCity of Philadelphia · 2017
SUPPLY AND INSTALL FOUR SUB PANELS EMON DMON METERING WIRING FOR NORMAL AND EMERGENCY RECEPTACLES, LIGHTING CIRCUITS SLEEVES FOR NURSE CALL PHONE AND CCTV AS PER 2008 NEC (SOUTH DISTRICT)City of Philadelphia · 2017
INSTALL (2) 20A, 120V DEDICATED EMER CIRCUITS FOR HEMODIALYSIS MACHINES & WATER PURIFIERS IN UNITS A-06 & A-08. INSTALL (4) 20A, 120V DEDICATED EMER CIRCUITS FOR HEMODIALYSIS MACHINES & WATER PURIFIERS IN UNITS A-10 AND A-12. INSTALL (6) 20A, 120V DEDICATED EMER CIRCUITS FOR HEMODIALYSIS MACHINES & WATER PURIFIERS IN UNIT A-23 PER 2008 NEC (NURSING HOME)City of Philadelphia · 2017
Permitted projects on public record. Addresses are omitted for privacy.