Demolition of front building WITH THE CONDITION THAT TEMPORARY FENCING BE INSTALLED 8 FEET FROM THE LORAIN AVENUE PROPERTY LINE AND THAT THE APPLICANT RETURN TO LANDMARKS STAFF WITHIN ONE (1) YEAR TO PROVIDE AN UPDATE ON FUTURE DEVELOPMENT OF THE SITE AS PER LANDMARKS COMMISSION APPROVAL
RAZE 1 STORY STRUCTURE (FRONT BUILDING ONLY) PER CLEVELAND BUILDING CODE CHAPTER 3115, BULF HEAD SEWERS PER WATER POLLUTION CONTROL, CONTROL DUST PER ORD. 27707, REMOVE ALL FOUNDATIONS, DISCONTINUE AND CAP ALL UTLITY CONNECTIONS, HAUL AWAY ALL DEBRIS, BACK FLL WITH CLEAN FILL COMPLY WITH ALL STATE AND FEDERAL ASBESTOR RULES AND STORM WATER REGULATIONSCity of Cleveland · 2026$11,000
RAZE 1 STORY FRAME 1 DU REMOVE ALL DEBRIS FROM SITE. FILL EXCAVATION TO GRADE. CONTROL DUST PER 277.07. SEED LOT AND REMOVE ALL FOUNDATION. DISCONTINUE AND CAP UTILITY CONNECTIONS.City of Cleveland · 2024$8,900
RAZE 1.5 STORY FRAME 1 DU REMOVE ALL DEBRIS FROM SITE. FILL EXCAVATION TO GRADE. CONTROL DUST PER 277.07. SEED LOT AND REMOVE ALL FOUNDATION. DISCONTINUE AND CAP UTILITY CONNECTIONS.City of Cleveland · 2024$7,800
RAZE 2 STORY FRAME 2 AND GARAGE. REMOVE ALL DEBRIS FROM SITE. FILL EXCAVATION TO GRADE. CONTROL DUST PER 277.07. SEED LOT. REMOVE ALL FOUNDATIONS. DISCONTINUE AND CAP UTILITY CONNESTIONS.City of Cleveland · 2022$9,600
RAZE 2 STORY FRAME 2 DU AND GARAGE. REMOVE ALL DEBRIS FROM SITE. FILL EXCAVATION TO GRADE. CONTROL DUST PER 277.07 SEED LOT. REMOVE ALL FOUNDATIONS. DISCONTINUE AND CAP UTILITY CONNECTIONS.City of Cleveland · 2022
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
$9,600
SITE DEVELOPMENT OF EXISTING GAS STATION LOT TO REMOVE THE PRE-FAB STORE BUILDING. USE AND CONSOLIDATION WITH 2419 E 9 ST APPROVED. CITY PLANNING APPROVED.City of Cleveland · 2022$4,500
INSTALL 80 LINEAR FEET SCREENED DUMPSTER ENCLOSURE FENCE WITH GATE AS PER PLAN.City of Cleveland · 2022$1,300
MAKE ALTERATIONS PER APPROVED PLANS. SEPARATE PLUMBING, HVAC AND ELECTRICAL PERMITS REQUIRED. SUBMIT SEPARATE PLANS TO FPB FOR ALTERATIONS TO FIRE PROTECTION SYSTEMS. CERTIFICATE OF OCCUPANCY REQUIRED. SEPARTE PERMITS REQUIRED FOR TENANT OCCUPANCIES.
**ADDRESS MODIFIED 11/21/2022 PER S. SHUBA***CTCity of Cleveland · 2021$225,000
RAZE 2 STORY STRUCTURE PER CLEVELAND BUILDING CODE CHAPTER 3115, BULKHEAD SEWERS PER WATER POLUTION CONTROL, CONTROL DUST PER ORD. 277.07, REMOVE ALL FOUNDATIONS, DISCONTINUE AND CAP ALL UTILITY CONNECTIONS, HAUL AWAY ALL DEBRIS, BACKFILL WITH CLEAN FILL. COMPLY WITH ALL STATE AND FEDERAL ASBESTOS RULES AND STORM WATER REGULATIONS.City of Cleveland · 2021$24,000
RAZE 1 STORY FRAME 1 DU. TO CORRECT COND VN DTD 2/1/2021. REMOVE ALL DEBRIS FROM SITE. FILL EXCAVATION TO GRADE. CONTROL DUST PER 277.07. SEED LOT AND REMOVE ALL FOUNDATION. DISCONTINUE AND CAP UTILITY CONNECTIONS.City of Cleveland · 2021$7,640
RAZE 1 STORY FRAME 1 DU. REMOVE ALL DEBRIS FROM SITE. FILL EXCAVATION TO GRADE. CONTROL DUST PER 277.07 SEED LOT. REMOVE ALL FOUNDATIONS. DISCONTINUE AND CAP UTILITY CONNECTIONSCity of Cleveland · 2021$8,350
RAZE 1 STORY FRAME 1 DU. REMOVE ALL DEBRIS FROM SITE. FILL EXCAVATION TO GRADE. CONTROL DUST PER 277.07 SEED LOT. REMOVE ALL FOUNDATIONS. DISCONTINUE AND CAP UTILITY CONNECTIONSCity of Cleveland · 2021$7,750
Permitted projects on public record. Addresses are omitted for privacy.