What the public permit record shows, not self-reported reviews.
Is TECH CORP LLC. a real contractor?
TECH CORP LLC. appears in public building-permit records with 20 permits filed through 2025 in and around City of Cleveland, OH. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is TECH CORP LLC.'s track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to TECH CORP LLC. by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is TECH CORP LLC. licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. TECH CORP LLC. has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is TECH CORP LLC.'s work?
The most recent permit on record for TECH CORP LLC. is dated 2025-06-24, with 20 permits on file in total.
TEAR OFF AND REINSTALL ROOF PER MANUFACTURER'S SPECS AND SCOPE OF WORK. 2 LAYERS 2.6" INSULATION, .080 DURO-TUFF ROOFING SYSTEM.City of Cleveland · 2025$37,000
TEAR OFF AND REINSTALL ROOF PER MANUFACTURER'S SPECS AND SCOPE OF WORK. ARCHITECTURAL DIMENSIONAL SHINGLES.City of Cleveland · 2024$25,400
TEAR OFF AND REINSTALL ROOF PER MANUFACTURER'S SPECS AND SCOPE OF WORK.City of Cleveland · 2024$303,970
INSTALL ROOF PER MANUFACTURER'S SPECS AND APPROVED PLANS.City of Cleveland · 2023$13,750
REMOVE PORTIONS OF ROOF AND REINSTALL PER MANUFACTURER'S SPECS AND SCOPE OF WORK.City of Cleveland · 2023$68,642
TEAR OFF AND REINSTALL ROOF PER MANUFACTURER'S SPECS AND SCOPE OF WORK.City of Cleveland · 2023$16,284
REMOVE HYDRO-VAC GRAVEL FROM EXISTING ROOF. INSTALL RECOVERY BOARD OVER ENTIRE FIELD AREA OF ROOF ACCORDING TO MANUFACTURER'S SPECIFICATIONS. INSTALL WHITE SINGLE PLY PVC/TPO ROOFING MEMBRANE. INSTALL FLASHING ASSEMBLIES. NEW COMPLESSION METAL/GRAVEL STOP/DRIP EDGE/COPING METAL/TERM BAR.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you TECH CORP LLC.?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Cleveland · 2022
$230,000
INSTALL RECOVERY BOARD OVER ENTIRE FIELD AREA OF ROOF ACCORDING TO MANUFACTURER'S SPECIFICATIONS. NEW FLASHING ASSEMBLIES WILL BE ENGINEERED. NEW COMPRESSION METAL/GRAVEL STOP /DRIP EDGES COPING METAL/TERM BAK. REPLACE EXISTING DECKING WITH 1/2 PLYWOOD. ONE-WAY VENTS WILL BE INSTALLED EVERY 1000 SQ/FT PER MANUFACTURER'S SPECIFICATIONS.City of Cleveland · 2022$21,600
TEAR OFF TOP LAYER OF DURO-LAST MEMBRANE DOWN TO RECOVERY BOARD AND RE-INSTALL ROOF PER MANUFACTURER'S SPECS AND CONTRACT SPECS.City of Cleveland · 2022$28,000
EXTERIOR / INTERIOR ALTERATION - REPLACE 50 WINDOWS ON RECTORY TO MATCH SCHOOL PER APPROVED PLANS.City of Cleveland · 2021$51,942
TEAR OFF AND RE-INSTALL PORTIONS OF ROOF PER MANUFACTURER'S SPECS AND CONTRACTOR PROPOSAL SPECS.City of Cleveland · 2021$33,000
TEAR OFF AND RE-INSTALL ROOF FOR ST TIMOTHY CHURCH PER MANUFACTURER'S SPECS. INSTALL 2 LAYERS 2.2" ISO INSULATION AND .060 FIRESTONE EPDM OR TPO.City of Cleveland · 2021$37,161
Permitted projects on public record. Addresses are omitted for privacy.