What the public permit record shows, not self-reported reviews.
Is MRN LTD PARTNERSHIP a real contractor?
MRN LTD PARTNERSHIP appears in public building-permit records with 61 permits filed through 2026 in and around City of Cleveland, OH. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is MRN LTD PARTNERSHIP's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to MRN LTD PARTNERSHIP by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is MRN LTD PARTNERSHIP licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. MRN LTD PARTNERSHIP has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is MRN LTD PARTNERSHIP's work?
The most recent permit on record for MRN LTD PARTNERSHIP is dated 2026-05-11, with 61 permits on file in total.
MAKE INTERIOR ALTERATIONS TO 2,624 SF TENANT SPACE PER APPROVED PLANS. SEPARATE PLUMBING, HVAC AND ELECTRICAL PERMITS ARE REQUIRED.City of Cleveland · 2026$350,000
MAKE INTERIOR ALTERATIONS TO EXISTING STRUCTURE, CONSTRUCT NEW BUILDING, AND MAKE SITE IMPROVEMENTS FOR NEW OUTDOOR DINING PATIO PER APPROVED PLANS AND SUPPLEMENTAL SITE PLAN SHOWING PENDING LOT LINES. LOT SPLIT/CONSOLIDATION REQUIRED; EXECUTED ACCESS EASEMENT AGREEMENTS REQUIRED BEFORE BUILDING/SPACE MAY BE OCCUPIED; MAINTAIN INGRESS/EGRESS OF VEHICLES TO PARKING AND RIGHT OF WAY; FIRE OFFICIAL REQUIRES PERMANENT CONTINUOUS 3’-0” STRIPING AND SIGNAGE STARTING AT NEW ONE STORY BUILDING’S EXIT ACCESS, ACROSS ADJACENT PARCELS, AND ENDING AT PUBLIC WAY (EAST 3RD STREET). SIGNAGE SHALL READ “PATH OF EGRESS – DO NOT BLOCK - BY ORDER OF CLEVELAND DIVISION OF FIRE.”; ROOF COVERINGS PROHIBITED; MAINTAIN POSTING OF OCCUPANT LOAD PLACARDS OF PATIO – REFER TO PLAN APPROVAL LETTER AND C.O. FOR OCCUPANT LOADS.
SEPARATE PLUMBING, HVAC, ELECTRICAL PERMITS REQUIRED. SEPARATE SEWER PERMIT REQUIRED. SEPARATE REVIEW AND APPROVAL BY HEALTH DEPARTMENT REQUIRED. SEPARATE APPLICATION REQUIRED FOR SIGNAGE. MAINTAIN OBC/OEBC CH33 SAFEGUARDS AND OFIC CH33 FIRE SAFETY.City of Cleveland · 2026$700,000
MAKE ALTERATIONS AND CHANGE USE APARTMENT BUILDING PER APPROVED PLANS. SEPARATE PLUMBING, HVAC, ELECTRICAL AND ELEVATOR PERMITS REQUIRED. CERTIFICATE OF OCCUPANCY REQUIRED. SEPARATE PERMITS REQUIRED FOR FUTURE TENANTS.City of Cleveland · 2025$18,524,511
MAKE INTERIOR ALTERATIONS TO RECONFIGURE EXISTING DWELLING UNITS PER APPROVED PLANS AND FIELD INSPECTIONS. SEPARATE PLUMBING, HVAC, ELECTRICAL PERMITS REQUIRED. SPECIAL INSPECTIONS REQUIRED. NO REVIEW OF LIFE SAFETY PLANS OUTSIDE OF SCOPE OF WORK WITH THIS PERMIT. SUBMIT SEPARATE PLANS TO FPB FOR ALTERATIONS TO FIRE PROTECTION SYSTEMS. MAINTAIN OBC/OEBC CH 33 SAFEGUARDS AND OFC CH33 FIRE SAFETY. REFER TO B24022987 FOR ADDITIONAL CONDITIONS. REFER TO B24022987 FOR TOTAL CONSTRUCTION COST.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you MRN LTD PARTNERSHIP?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to MRN LTD PARTNERSHIP's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Cleveland · 2025
$1
MAKE INTERIOR ALTERATIONS PER APPROVED PLANS, FIELD INSPECTIONS, AND BBS A-207-24 FOR CHANGE OF USE ON FLOOR 7. SEPARATE PLUMBING, HVAC, ELECTRICAL PERMITS REQUIRED. SPECIAL INSPECTIONS REQUIRED. NO STRUCTURAL ALTERATIONS WITH THIS PERMIT. NO REVIEW OF LIFE SAFETY PLANS OUTSIDE OF SCOPE OF WORK WITH THIS PERMIT. SEE PLAN APPROVAL LETTER FOR ADDITIONAL CONDITIONS.
THE ISSUANCE OF A BUILDING PERMIT BY THE DEPARTMENT OF BUILDING AND HOUSING DOES NOT WAIVE THE REQUIREMENT FOR THE REVIEW AND APPROVAL BY THE FPB; AND, SHALL NOT BE CONSTRUED TO BE A PERMIT FOR, OR AN APPROVAL OF, ANY VIOLATION OF ANY OF THE PROVISIONS OF THE CODE OR ANY OTHER ORDINANCE OF THE JURISDICTION. NO REVIEW OF EXISTING FLOORS 2, 3; OR BASEMENT WITH THIS PERMIT. ADDITIONAL FIRE PROTECTION MAY BE REQUIRED IN BASEMENT UPON DEFERRED SUBMITTAL REVIEW AT FPB. THE OWNER OR THE OWNER’S AGENT SHALL MAKE APPLICATION AND OBTAIN PLAN APPROVAL FROM THE FIRE PREVENTION BUREAU (FPB) FOR THE PROPOSED WORK IN ACCORDANCE WITH CHAPTER 9 OF THE OHIO BUILDING CODE. PROJECT SHALL MEET OBC 901.2 THRU 901.6.3. SUBMIT FIRE PERMIT APPLICATIONS WITH 3 SETS OF FIRE PROTECTION PLANS FOR EACH APPLICATION TO FIRE PREVENTION BUREAU FOR REVIEW AND APPROVAL (FIRE ALARM SYSTEM, SUPPRESSION SYSTEM, STANDPIPE).City of Cleveland · 2025$1,500,000
INSTALL NEW KITCHEN CABINETS AND REPLACE KITCHEN SINK PER APPROVED PLANS AND FIELD INSPECTIONS. NO PLUMBING, HVAC, OR ELECTRICAL WITH THIS PERMIT. NO STRUCTURAL ALTERATIONS WITH THIS PERMIT. PENETRATIONS OF RATED ASSEMBLIES PROHIBITED. NO EXPANSION OR CHANGE OF USE WITH THIS PERMIT. MAINTAIN OBC CH33 SAFEGUARDS AND OFC CH33 FIRE SAFETY.
APARTMENT 504City of Cleveland · 2024$10,000
ALTER AND CONVERT THE 15TH FLOOR OF THE NEW ENGLAND BLDG INTO CONDOMINIUMS. ELECTRICAL, PLUMBING AND HVAC PERMITS ARE REQUIRED. CONSTRUCTION DOCUMENTS ARE REQUIRED TO BE SUBMITTED FOR REVIEW AND APPROVAL FOR THE AUTOMATIC FIRE SPRINKLER AND FIRE ALARM AND DETECTION SYSTEMS.City of Cleveland · 2023$2,162,712
DECOMMISSION ELEVATORS #3786 AND #3787 PER APPROVED PLANS.City of Cleveland · 2023$11,000
MAKE INTERIOR ALTERATIONS PER APPROVED PLANS AND BZA 22-218. SEPARATE PLUMBING, HVAC AND ELECTRICAL PERMITS REQUIRED. CERTIFICATE OF OCCUPANCY REQUIRED. SUBMIT SEPARATE PLANS TO FPB FOR ALTERATIONS TO FIRE PROTECTION SYSTEMS.City of Cleveland · 2023$280,000
ERECT 8DU APARTMENT BUILDING PER APPROVED PLANS, BZA 21-150 AND LANDMARKS. SEPARATE PLUMBING, HVAC AND ELECTRICAL PERMITS REQUIRED. SUBMIT SEPARATE PLANS TO FPB FOR FIRE PROTECTION SYSTEMS. CERITIFICATE OF OCCUPANCY REQUIRED.City of Cleveland · 2023$570,000
ALTER MODEL ROOM 506 OF THE HOLIDAY INN EXPRESS. ELECTRICAL, PLUMBING AND HVAC PERMITS ARE REQUIRED. CONSTRUCTION DOCUMENTS ARE REQUIRED TO BE SUBMITTED FOR REVIEW AND APPROVAL FOR THE REQUIRED ALTERATIONS TO THE AUTOMATIC FIRE SPRINKLER SYSTEM. NO CERTIFICATE OF OCUPANCY REQUIRED WITH THIS PERMIT.City of Cleveland · 2023$66,278
ALTER AND CONVERT THE 17TH FLOOR OF THE NEW ENGLAND BLDG INTO CONDOMINIUMS. ELECTRICAL, PLUMBING AND HVAC PERMITS ARE REQUIRED. CONSTRUCTION DOCUMENTS ARE REQUIRED TO BE SUBMITTED FOR REVIEW AND APPROVAL FOR THE AUTOMATIC FIRE SPRINKLER AND FIRE ALARM AND DETECTION SYSTEMS. SPECIAL INSPECTIONS ARE REQUIRED.City of Cleveland · 2022$2,250,251
Permitted projects on public record. Addresses are omitted for privacy.