MAKE INTERIOR ALTERATIONS TO SANCTUARY FLOOR PER APPROVED PLANS. NO CHANGE OF USE WITH THIS PERMIT. SPECIAL INSPECTIONS REQUIRED.City of Cleveland · 2026$200,000
INTERIOR ALTERATION 1,738 SQ FT BASEMENT WOOD RESEARCH TOWER ROOM B04A - MRI EQUIPMENT AND LAB PER APPROVED PLANS. PERMITS REQUIRED FOR HVAC, ELECTRICAL AND FIRE PROTECTION SYSTEMS.City of Cleveland · 2025$480,500
INTERIOR ALTERATIONS OF 30,964 SF, STEEL FRAMED MIXED-USE BUILDING. WORK IS LIMTED TO FOURTH FLOOR, EDUCATIONAL LABORATORIES AND SUPPORT ROOMS. NO STRUCTURAL CHANGES. PLUMBING, HVAC AND ELECTRICAL PERMITS REQUIRED.City of Cleveland · 2025$7,600,032
MAKE ALTERATIONS TO LIBRARY AND INSTALL MAKER SPACE PER APPROVED PLANS. SEPARATE PLUMBING HVAC AND ELECTRICAL PERMITS REQUIRED. NO CHANGE OF USE WITH THIS PERMIT.City of Cleveland · 2025$1,800,000
MAKE INTERIOR ALTERATIONS TO KITCHEN & CAFETERIA PER APPROVED PLANS. SEPARATE PLUMBING, HVAC & ELECTRICAL PERMITS REQUIRED. NO CHANGE OF USE WITH THIS PERMIT.City of Cleveland · 2025$2,700,000
EXTERIOR / INTERIOR ALTERATION 31,000 SQ FT 4TH FLOOR ROBBINS BUILDING - REMOVE NON-STRUCTURAL ELEMENTS AND INSTALL WINDOWS IN NEW OPENINGS PER APPROVED PLANS.City of Cleveland · 2024
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
$1,850,000
MAKE ALTERATIONS TO GROUND FLOOR PER APPROVED PLANS. SEPARATE PLUMBING, HVAC AND ELECTRICAL PERMITS REQUIRED. SUBMIT SEPARATE PLANS TO FPB FOR ALTERATIONS TO FIRE PROTECTION SYSTEMS.City of Cleveland · 2024$5,878,624
MAKE INTERIOR ALTERATIONS ON FLOORS 5 AND 6 FOR RESEARCH LAB PER APPROVED PLANS. SEPARATE ELECTRICAL AND HVAC PERMITS REQUIRED. NO PLUMBING WORK WITH THIS PERMIT. CERTIFICATE OF OCCUPANTY REQUIRED.
THE ISSUANCE OF A BUILDING PERMIT BY THE DEPARTMENT OF BUILDING AND HOUSING DOES NOT WAIVE THE REQUIREMENT FOR THE REVIEW AND APPROVAL BY THE FPB.SUBMIT RESPECTIVE FIRE PERMIT APPLICATIONS AND FIRE PROTECTION PLANS (FIRE ALARM, SPRINKLER, AND HAZMAT) TO FIRE PREVENTION BUREAU FOR REVIEW AND APPROVAL; OBC 901.6 AND 901.6.2 SUPERVISORY SERVICE. MAINTAIN O.B.C. CHAPTER 33 SAFEGUARDS DURING CONSTRUCTION AND O.F.C. CHAPTER 33 FIRE SAFETY DURING DEMOLITION. OBC 3309 FIRE EXTINGUISHERS. OBC 3310 MEANS OF EGRESS. OBC 3311 STANDPIPES. OBC 3312 AUTO SPRINKLER SYSTEM. OBC 3313 WATER SUPPLY FOR FIRE PROTECTION.City of Cleveland · 2023$650,000
EXTERIOR / INTERIOR ALTERATION 13,600 SQ FT 3RD, 4TH, 8TH FLOORS OLIN BUILDING PER APPROVED PLANS. SPECIAL INSPECTOR REQUIRED. INSTALL SPRINKLER SYSTEM ON 3RD, 4TH, 8TH FLOORS. INSTALL FIRE ALARM SYSTEM ON ALL FLOORS. PERMITS REQUIRED FOR PLUMBING, HVAC, ELECTRICAL AND FIRE PROTECTION SYSTEMS.City of Cleveland · 2023$4,600,000
PERFORM ALTERATIONS TO ENCLOSE THE FIRST FLOOR DRIVE-THRU AT CEDARTECH BLDG (AKA 10900 CARNEGIE AVE) INCLUDING SITE IMPROVEMENTS. ELECTRICAL, PLUMBING AND HVAC PERMITS ARE REQUIRED. A SEPARATE APPLICATION AND CONSTRUCTION DOCUMENTS ARE REQUIRED TO BE SUBMITTED FOR REVIEW AND APPROVAL FOR THE FIRE ALARM AND DETECTION SYSTEM. SOIL INSPECTION REPORT TO BE SUBMITTED TO THE BUILDING OFFICIAL.City of Cleveland · 2023$1,200,000
BUILD AN ADDITION ONTO HOPE LODGE. ELECTRICAL, PLUMBING AND HVAC PERMITS ARE REQUIRED. CONSTRUCTION DOCUMENTS ARE REQUIRED TO BE SUBMITTED FOR REVIEW AND APPROVAL FOR THE AUTOMATIC FIRE SPRINKLER AND FIRE ALARM AND DETECTION SYSTEMS. THE WATER DEMAND AT THE BASE OF THE SPRINKLER RISER AND THE HAZARD CLASSIFICATION MUST BE PROVIDED TO THE BUILDING DEPT. SPECIAL INSPECTIONS ARE REQUIRED, ROOF & FLOOR TRUSS DRAWINGS TO BE SUBMITTED.City of Cleveland · 2023$3,800,000
INTERIOR ALTERATION 15,689 SQ FT 1ST, 2ND, 3RD FLOORS - RENOVATION OF HUMAN FUSIONS INSTITUTE PER APPROVED PLANS. PERMITS REQUIRED FOR HVAC AND ELECTRICAL.City of Cleveland · 2023$528,000