ERECT 6' 4" PRECAST MONUMENT SIGN PER APPROVED PLANS. PERMIT REQUIRED FOR ELECTRICAL.City of Cleveland · 2026$16,000
INT. ALT. OF EXISTING ASSEMBLY SPACE (CHURCH) INCLUDING LIGHTING, PAINT/FINISH, ELECTRICAL, AND MECHANICAL IMPROVEMENTS. RE-ORGANIZATION OF EXISTING RESTROOMS AND NEW ACCESSIBILITY RAMPS TO SANCTUARY. SEPERATE MECHANICAL, ELECTRICAL, AND PLUMBING PERMITS REQUIRED. NO CHANGE TO OCCUPANCY.
Interior beautification changing lighting, paint and other options.City of Cleveland · 2026$9,075,063
MAKE ALTERATIONS AND CHANGE USE PER APPROVED PLANS. SEPARATE PLUMBING, HVAC, ELECTRICAL & ELEVATOR PERMITS REQUIRED. SPECIAL INSPECTIONS REQUIRED. CERTIFICATE OF OCCUPANCY REQUIRED. SUBMIT SEPARATE PLANS TO FPB FOR FIRE PROTECTION SYSTEMS.City of Cleveland · 2026$40,823,992
EXTERIOR / INTERIOR ALTERATION - REMOVE CINDERCRETE FROM FLOORS 2 TO 5 AND ROOF IN SEQUENCE AND REPLACE WITH STEEL DECKING AND CONCRETE, REPLACE MASONRY AS SHOWN PER APPROVED PLANS. SCOPE OF WORK IS BETWEEN COLUMNS 1 AND 17.City of Cleveland · 2026$835,000
MAKE INTERIOR ALTERATIONS TO 49,990 SF, SIX-STORY CHANCERY PER APPROVED PLANS. SEPARATE PLUMBING, HVAC, ELECTRICAL AND FIRE PROTECTION PERMITS ARE REQUIRED.City of Cleveland · 2025$15,000,000
CONSTRUCT NEW FOUR-STORY RESIDENTIAL BUILDING PER APPROVED PLANS AND BZA 23-212. SEPARATE PLUMBING, HVAC, ELECTRICAL PERMITS REQUIRED. SEPARATE SEWER PERMIT REQUIRED. SEPARATE ELEVATOR PERMIT REQUIRED. SWPPP APPROVAL AND INSPECTIONS REQUIRED. SPECIAL INSPECTIONS REQUIRED. ROOF AND FLOOR TRUSS DRAWINGS TO BE A DEFERRED SUBMITTAL. ENROACHMENT PERMIT REQUIRED BEFORE BUILDING MAY BE OCCUPIED. SUBMIT SEPARATE PLANS TO FPB FOR REVIEW AND APPROVAL OF FIRE PROTECTION SYSTEMS - SEE PLAN APPROVAL LETTER FOR SUPPLEMENTAL CONDITIONS. WORK IN PUBLIC RIGHT OF WAY REQUIRES SEPARATE REVIEW AND APPROVAL – STREET OPENING/OBSTRUCTION PERMIT REQUIRED. MAINTAIN OBC CH33 SAFEGUARDS AND OFC CH33 FIRE SAFETY.
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Construct the Walton Apartments. Electrical, plumbing and HVAC permits are required. Separate applications and construction documents are required to be submitted for review and approval for the automatic fire sprinkler and fire alarm and detection systems. The water demand at the base of the sprinkler riser and the hazard classification must be provided to the Building Dept. Floor & roof truss drawings must be submitted for review and approval. Special inspections, rental registration and elevator license required. A separate permit for signage is required. Filed copy of the Lot Combination Plat to be submitted.City of Cleveland · 2025$13,157,581
MAKE INTERIOR ALTERATIONS PER APPROVED PLANS FOR SELECTIVE DEMOLITION ONLY (PHASED APPROVAL) NO HVAC, PLUMBING, ELECTRICAL WORK WITH THIS PERMIT. NO NEW WORK WITH THIS PERMIT. SEPARATE APPLICATIONS REQUIRED FOR ADDITIONAL PHASES, OCCUPANCY, AND USE. SUBMIT SEPARATE PLANS TO FPB FOR ALTERATIONS TO FIRE PROTECTION SYSTEMS IF APPLICABLE. MAINTAIN OBC CH33 SAFEGUARDS AND OFC CH33 FIRE SAFETY.City of Cleveland · 2025$800,000
CONSTRUCT A MULTISTORY ADDITION TO THE SHOREWAY COMPLEX. ELECTRICAL, PLUMBING AND HVAC PERMITS ARE REQUIRED. CONSTRUCTION DOCUMENTS ARE REQUIRED TO BE SUBMITTED FOR REVIEW AND APPROVAL FOR THE AUTOMATIC FIRE SPRINKLER AND FIRE ALARM AND DETECTION SYSTEMS. THE WATER DEMAND AT THE BASE OF THE SPRINKLER RISER AND THE HAZARD CLASSIFICATION MUST BE PROVIDED TO THE BUILDING DEPARTMENT. SPECIAL INSPECTIONS, ELEVATOR LICENSING AND RENTAL REGISTRATION ARE REQUIRED. REFERENCE BBS A-166-24 & BZA 22-00115. (Separate applications are required for the two swimming pools and spa)City of Cleveland · 2025
MAKE ALTERATIONS PER APPROVED PLANS. SEPARATE PLUMBING, HVAC AND ELECTRICAL PERMITS REQUIRED. SUBMIT SEPARATE PLANS TO FPB FOR SPRINKLER SYSTEM. CERTIFICATE OF OCCUPANCY REQUIRED.City of Cleveland · 2025$200,000
Construct Parking lot as per BZA Cal # 24-203 and Traffic Department approval. Certificate of Occupancy is required.City of Cleveland · 2025$288,630
MAKE INTERIOR ALTERATIONS PER APPROVED PLANS AND FIELD INSPECTIONS TO BSMT, FL 1 AND FL3. SEPARATE ELECTRICAL, HVAC AND PLUMBING PERMITS REQUIRED. SPECIAL INSPECTIONS REQUIRED. MAINTAIN OBC CH33 SAFEGUARDS AND OFC CH33 FIRE SAFETY. SUBMIT SEPARATE PLANS TO FPB FOR ALTERATIONS OR WORK TO FIRE PROTECTION SYSTEMS (FIRE ALARM AND SPRINKLER). CERTIFICATE OF OCCUPANCY REQUIRED FOR TENANT SPACE ON FL1 AND AMENTITY SPACES ON FL 3. NO EXPANSION OR CHANGE OF USE AT BASEMENT. EXISTING OCCUPIED SPACES NOT REVIEWED WITH THIS PERMIT.
REFERENCE B23025346, B23012432, BBS A-404-23 AND BBS A-141-23.City of Cleveland · 2024$1
Permitted projects on public record. Addresses are omitted for privacy.