Is GREAT LAKES CRUSHING, LTD. a real contractor?
GREAT LAKES CRUSHING, LTD. appears in public building-permit records with 19 permits filed through 2024 in and around City of Cleveland, OH. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is GREAT LAKES CRUSHING, LTD.'s track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to GREAT LAKES CRUSHING, LTD. by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is GREAT LAKES CRUSHING, LTD. licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. GREAT LAKES CRUSHING, LTD. has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is GREAT LAKES CRUSHING, LTD.'s work?
The most recent permit on record for GREAT LAKES CRUSHING, LTD. is dated 2024-10-09, with 19 permits on file in total.
INSTALL 1,775 DRAIN, WASTE, VENT PIPING, 2,100 LF WATER DISTRIBUTION PIPING, 3,100 LF STORM AND/OR SAN SEWER
BUILDING PERMIT NO B24019000 - Expansion of Hospice of Western ReserveCity of Cleveland · 2024$35,000
PERFORM SITEWORK ONLY FOR THE NEW EASTSIDE HOSPICE HOUSE BUILDING (PHASED APPROVAL ONLY). SWPP INSPECTIONS ARE REQUIRED.City of Cleveland · 2024$2,100,000
RAZE 1 STORY FRAME 1 DU REMOVE ALL DEBRIS FROM SITE. FILL EXCAVATION TO GRADE. CONTROL DUST PER 277.07. SEED LOT AND REMOVE ALL FOUNDATION. DISCONTINUE AND CAP UTILITY CONNECTIONS.City of Cleveland · 2023$6,000
RAZE 1 STORY FRAME 1 DU REMOVE ALL DEBRIS FROM SITE. FILL EXCAVATION TO GRADE. CONTROL DUST PER 277.07. SEED LOT AND REMOVE ALL FOUNDATION. DISCONTINUE AND CAP UTILITY CONNECTIONS.City of Cleveland · 2023$6,000
RAZE 1 STORY FRAME 1 DU REMOVE ALL DEBRIS FROM SITE. FILL EXCAVATION TO GRADE. CONTROL DUST PER 277.07. SEED LOT AND REMOVE ALL FOUNDATION. DISCONTINUE AND CAP UTILITY CONNECTIONS.City of Cleveland · 2023$6,000
RAZE 1 STORY FRAME 1 DU REMOVE ALL DEBRIS FROM SITE. FILL EXCAVATION TO GRADE. CONTROL DUST PER 277.07. SEED LOT AND REMOVE ALL FOUNDATION. DISCONTINUE AND CAP UTILITY CONNECTIONS.City of Cleveland · 2023
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you GREAT LAKES CRUSHING, LTD.?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to GREAT LAKES CRUSHING, LTD.'s website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
$6,000
RAZE 2.5 STORY FRAME 2 DU TO CORRECT COND. V21025902 DATED 07/08/2022. REMOVE ALL DEBRIS FROM SITE. FILL EXCAVATION TO GRADE. CONTROL DUST PER 277.07 SEED LOT. REMOVE ALL FOUNDATIONS. DISCONTINUE AND CAP UTILITY CONNECTIONS.City of Cleveland · 2023$9,950
RAZE 2 STORY FRAME 1 DU TO CORRECT COND. V19040413 DATED 12/30/2019. REMOVE ALL DEBRIS FROM SITE. FILL EXCAVATION TO GRADE. CONTROL DUST PER 277.07 SEED LOT. REMOVE ALL FOUNDATIONS. DISCONTINUE AND CAP UTILITY CONNECTIONS.City of Cleveland · 2023$13,740
RAZE 1.5 STORY FRAME 1 DU TO CORRECT COND. V20012908 DATED 11/20/2020. REMOVE ALL DEBRIS FROM SITE. FILL EXCAVATION TO GRADE. CONTROL DUST PER 277.07 SEED LOT. REMOVE ALL FOUNDATIONS. DISCONTINUE AND CAP UTILITY CONNECTIONS.City of Cleveland · 2023$8,340
MAKE SITE PREPARATIONS PER APPROVED PLANS. SEWER PERMIT REQUIRED. FOLLOW-ON PERMITS REQUIRED FOR FUTURE BUILDINGS. NO USE ESTABLISHED WITH THIS PERMIT. MONTHLY SWPP INSPECTIONS REQUIRED.City of Cleveland · 2022$1,182,500
INSTALL 300 LF STORM SEWERCity of Cleveland · 2021$55,000
RAZE 2 STORY STRUCTURE PER CLEVELAND BUILDING CODE CHAPTER 3115, BULKHEAD SEWERS PER WATER POLUTION CONTROL, CONTROL DUST PER ORD. 277.07, REMOVE ALL FOUNDATIONS, DISCONTINUE AND CAP ALL UTILITY CONNECTIONS, HAUL AWAY ALL DEBRIS, BACKFILL WITH CLEAN FILL. COMPLY WITH ALL STATE AND FEDERAL ASBESTOS RULES AND STORM WATER REGULATIONS.City of Cleveland · 2021$45,000
Permitted projects on public record. Addresses are omitted for privacy.