Is DUNLOP & JOHNSTON, INC. a real contractor?
DUNLOP & JOHNSTON, INC. appears in public building-permit records with 14 permits filed through 2023 in and around City of Cleveland, OH. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is DUNLOP & JOHNSTON, INC.'s track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to DUNLOP & JOHNSTON, INC. by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is DUNLOP & JOHNSTON, INC. licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. DUNLOP & JOHNSTON, INC. has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is DUNLOP & JOHNSTON, INC.'s work?
The most recent permit on record for DUNLOP & JOHNSTON, INC. is dated 2023-07-25, with 14 permits on file in total.
Construct St Rocco School Addition. Electrical, plumbing and HVAC permits are required. Separate applications and construction documents are required for the automatic fire sprinkler, fire alarm and detection, kitchen exhaust hood and hood fire suppression system. The water demand at the base of the sprinkler riser and the hazard classification to be provided to the Building Dept. Licenses for chairlift & food service and special inspections are required. Deferred submittals: Roof truss drawings and pre-engineered metal building. Grease interceptor installation instructions to be available at inspection. C of O required.City of Cleveland · 2023$2,953,740
CONSTRUCT NEW FIRE STATION 26. ELECTRICAL, PLUMBING AND HVAC PERMITS ARE REQUIRED. CONSTRUCTION DOCUMENTS ARE REQUIRED TO BE SUBMITTED FOR REVIEW AND APPROVAL FOR THE AUTOMATIC FIRE SPRINKLER AND FIRE ALARM AND DETECTION SYSTEMS. THE WATER DEMAND AT THE BASE OF THE SPRINKLER RISER AND THE HAZARD CLASSIFICATION MUST BE PROVIDED TO THE BUILDING DEPARTMENT. SPECIAL AND SWPP INSPECTIONS ARE REQUIRED. REFER TO BBS A-102-23. LOT COMBINATION TO BE FILED. SEE FIRE DEPT CONDITIONS ALSO.City of Cleveland · 2023$11,578,900
MAKE SITE IMPROVEMENTS TO ERECT "SAFETY TOWN" PLAYGROUND PER APPROVED PLANS. SEPARATE ELECTRICAL PERMITS REQUIRED.City of Cleveland · 2021$317,643
NEW FREDERICK DOUGLAS PARK RECREATION CENTER - IN WARD 1 BUILDING WILL BE 1 STORY AND INCLUDES LOAD BEARING MASONRY WITH CONVENTIONAL STEEL BAR JOIST ROOF AND PRE-ENGINEERED METAL BUILDING. PROGRAM INCLUDES NEW GYM, FITNESS ROOMS, COMMUNITY ROOMS, OFFICES, LOCKER ROOMS AND A POOL.
NOTE: REQUIRED PERMITS: BUILDING PERMIT, STRUCTURAL PERMIT, PLUMBING PERMIT, HVAC PERMIT, ELECTRICAL PERMIT, APPROVAL FROM THE DIVISION OF FIRE AND AN APPROVAL FROM THE SOIL WATER POLLUTION PREVENTION PLAN (SWPPP) CONSULTANT.City of Cleveland · 2020
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you DUNLOP & JOHNSTON, INC.?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to DUNLOP & JOHNSTON, INC.'s website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
$14,000,000
SEVENTH FLOOR ALTERATION PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FLOR PLUMBING, HVAC, AND ELECTRICAL WORK. SUBMIT FIRE SUPPRESSION AND ALARM MODIFICATIONS TO FIRE PREVENTION BUREAU FOR REVIEW AND APPROVAL PRIOR TO ANY WORK. ALL WORK SHALL COMPLY WITH CURRENT OHIO BUILDING CODES AND CITY OF CLEVELAND ORDINANCES. NO CHANGE IN USE OR OCCUPANCY.City of Cleveland · 2019$646,750
MAKE INTERIOR ALTERATIONS PER APPROVED PLANS. NO CHANGE OF USE OR OCCUPANCY WITH THIS PERMIT.City of Cleveland · 2019
ERECT NEW PER APPROVED PLANS & B.Z.A. #18-113 SCHOOL APPROX. 12,780 S.F. IN 1 STORY STEEL FRAME STRUCTURE. FOUNDATION/SITE PERMIT #B18012627. SEPARATE PERMITS REQ'D FOR PLUMBING, H.V.A.C. & ELECTRICAL. SEPARATE APPLICATION TO FIRE PREV. BUR. REQ'D FOR FIRE PROTECTION SYSTEMS. SPECIAL INSPECTIONS REQ'D. CARPORT NOT INCLUDED. CERTIFICATE OF OCCUPANCY REQ'D.City of Cleveland · 2018
ERECT NEW PER APPROVED PLANS & B.Z.A. #18-113 SITE WORK & FOUNDATIONS ONLY FOR FUTURE SCHOOL STRUCTURE. PHASED APPROVAL. SEPARATE PERMITS REQ'D FOR PLUMBING, ELECTRICAL, SEWERS & SIDEWALKS. ALL WORK IN RIGHT OF WAY PER CITY OF CLEVELAND STANDARDS. NO OCCUPANCY THIS PHASE.City of Cleveland · 2018$574,795
UNIVERSITY HOSPITALS IN-PATIENT EPILEPSY MONITORING UNIT INTERIOR ALTERATIONS 4TH FLOOR - INTERIOR RENOVATION OF THE EXISTING FOURTH FLOOR OF LAKESIDE 40 TO ACCOMODATE AN IN-PATIENT EPILEPSY MONITORING UNIT.
NOTE: PERMITS THAT ARE REQUIRED FOR THIS PROJECT - BUILDING PERMIT, HVAC PERMIT, PLUMBING PERMIT AND ELECTRICAL PERMIT.
REVISED OCTOBER 2, 2018 – THE FOURTH FLOOR ALTERATION PROJECT IS A PHASED PROJECT THAT HAS BEEN SEPARATED INTO TWO PHASES.
• PHASE ONE ALTERATION INCLUDES ALL WORK COMPLETED NORTH OF COLUMN LINE 17.
• PHASE TWO ALTERATION INCLUDES ALL WORK COMPLETED SOUTH OF COLUMN LINE 17.
• PHASE ONE AND PHASE TWO DATES ARE LISTED BELOW:
PHASE 1
START DATE: JUNE 11, 2018
ANTICIPATED COMPLETION DATE: NOVEMBER 16, 2018
PHASE 2
ANTICIPATED START DATE: DECEMBER 5, 2018
ANTICIPATED COMPLETION DATE: MARCH 1, 2019City of Cleveland · 2018$2,470,000
INTERIOR ALTERATION 5,276 SQ FT MATHER HOUSE - FINISH UPGRADE, NEW CEILINGS, PLUMBING FIXTURES AND LIGHTING PER APPROVED PLANS. PERMITS REQUIRED FOR PLUMBING, ELECTRICAL AND FIRE PROTECTION SYSTEMS.City of Cleveland · 2018$700,000
ALTERATIONS TO 4TH AND 5TH FLOORS, FREIGHT ELEVATOR MODERNIZATION, AND EXTERIOR REPAIRS TO EAST FACE OF BUILDING. ALL WORK PER APPROVED PLANS AND SPECIFICATIONS. SEPARATE PERMITS ARE REQUIRED FOR HVAC, PLUMBING, ELECTRICAL, ELEVATOR AND FIRE SUPPRESSION. NO SITE WORK. CERTFICIATE OF OCCUPANCY IS REQUIRED.City of Cleveland · 2016$2,789,000
INTERIOR FINISHES, ALTERATIONS, HVAC & ELECTRICAL UPGRADES AND FIRE ALARMS PER APPROVED PLANS. SEPARATE HVAC, PLUMBING AND ELECTRICAL AND FIRE ALARM PERMITS REQUIRED. NO CHANGE OF USE OR OCCUPANCY.City of Cleveland · 2015$355,000