RAZE 2 STORY 2 D/U FILL EXCAVATION TO GRADE CONTROL DUST SEED LOT REMOVE ALL DEBRISCity of Cleveland · 2026$8,244
RAZE EXISTING 1 DU 1.5 STORY FRAME RESIDENCE PER CITY CODE. REMOVE ALL DEBRIS FROM SITE. FILL EXCAVATION TO GRADE. CONTROL DUST PER 277.07. SEED LOT AND REMOVE ALL FOUNDATION. DISCONTINUE AND CAP UTILITY CONNECTIONS.City of Cleveland · 2026$7,974
DemolitionCity of Cleveland · 2026$11,500
RAZE 2 1/ 2 STORY STRUCTURE PER CLEVELAND BUILDING CODE CHAPTERS 3115, BULKHEAD SEWERS PER WATER POLLUTION CONTROL DUST PER ORD. 27707, REMOVE ALL FOUNDATIONS, DISCONTINUE ALL FOUNDATIONS, DISCONTIUE AND CAP ALL UTILITY CONNECTIONS, HAUL AWAY ALL DEBRIS, BACKFILL WITH CLEAN FILL, COMPLY WITH ALL STATE AND FEDERAL ASBESTOS RULES AND STORM WATER REGULATIONS.City of Cleveland · 2026$23,237
RAZE 1 STORY FRAME 1 DU REMOVE ALL DEBRIS FROM SITE. FILL EXCAVATION TO GRADE. CONTROL DUST PER 277.07. SEED LOT AND REMOVE ALL FOUNDATION. DISCONTINUE AND CAP UTILITY CONNECTIONS.City of Cleveland · 2026$11,500
RAZE 1 STORY 1D/U TO CORRECT CONDEMNATION. FILL EXCAVATIONS TO GRADE. CONTROL DUST, SEED LOT, REMOVE DEBRISCity of Cleveland · 2026
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
$7,444
RAZE 2.5 STORY FRAME 2 DU & DETACHED GARAGE. REMOVE ALL DEBRIS FROM SITE. FILL EXCAVATION TO GRADE. CONTROL DUST PER 277.07 SEED LOT. REMOVE ALL FOUNDATIONS. DISCONTINUE AND CAP UTILITY CONNECTIONS.City of Cleveland · 2026$10,249
RAZE 2 STORY FRAME 1 DU TO CORRECT COND REMOVE ALL DEBRIS FROM SITE. FILL EXCAVATION TO GRADE. CONTROL DUST PER 277.07 SEED LOT. REMOVE ALL FOUNDATIONS. DISCONTINUE AND CAP UTILITY CONNECTIONS,City of Cleveland · 2025$10,239
RAZE 1 STORY FRAME 1 DU REMOVE ALL DEBRIS FROM SITE. FILL EXCAVATION TO GRADE. CONTROL DUST PER 277.07. SEED LOT AND REMOVE ALL FOUNDATION. DISCONTINUE AND CAP UTILITY CONNECTIONS.City of Cleveland · 2025$10,500
RAZE 2 STORY FRAME 2 DU & GARAGE REMOVE ALL DEBRIS FROM SITE. FILL EXCAVATION TO GRADE. CONTROL DUST PER 277.07. SEED LOT AND REMOVE ALL FOUNDATION. DISCONTINUE AND CAP UTILITY CONNECTIONS.City of Cleveland · 2025$9,744
RAZE 2 STORY FRAME 2 DU REMOVE ALL DEBRIS FROM SITE. FILL EXCAVATION TO GRADE. CONTROL DUST PER 277.07. SEED LOT AND REMOVE ALL FOUNDATION. DISCONTINUE AND CAP UTILITY CONNECTIONS.
*** REAR ***City of Cleveland · 2025$15,000
RAZE 2.5 STORY FRAME 1 DU & GARAGE REMOVE ALL DEBRIS FROM SITE. FILL EXCAVATION TO GRADE. CONTROL DUST PER 277.07. SEED LOT AND REMOVE ALL FOUNDATION. DISCONTINUE AND CAP UTILITY CONNECTIONS.City of Cleveland · 2025$10,600
Permitted projects on public record. Addresses are omitted for privacy.