SERVICE UPGRADE:
Replace 3-phase service to the disconnect. Replace single phase services. Replace 200a and 100a Federal Pacific panels on the single phase service.City of Cleveland · 2026$9,115
Install 1 120v, 20a circuit from the main panel to the detached garage. Install a garage door opener outlet, switch, and light.City of Cleveland · 2026$2,495
200a panel and service upgrade. Refeed the existing sub-panel with a new, 100a circuit. Existing sub-panel to remain in place. Install 220v, 20a exterior connection for mini-split. We are not installing the mini-split itself. Install (2) new grounded 120v, 20a circuits. One in the 1st floor living room and one in the 2nd floor bedroom. FirstEnergy DR#: 777 396 252City of Cleveland · 2026$5,940
SERVICE UPGRADE:
100a service replacement, exterior disconnect install.City of Cleveland · 2026$2,298
Install a 60a hardwired EV charger on the exterior of the home by the driveway.City of Cleveland · 2026$945
500 SF - 200a panel and service upgrade. Terminate stairwell fusebox. Rewire remaining ungrounded locations with modern wiring.City of Cleveland · 2026$14,620
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
INSTALL 10 SQUARE FEET: Install (1) 240v, 60a hardwired EV charger on the exterior of the home. PER FIELD INSPECTIONCity of Cleveland · 2026$895
INSTALL 1,337 SQUARE FEET - Removing the remaining ungrounded wiring in the home and replacing with modern wiring.City of Cleveland · 2026$22,390
2,101 SF -Whole home rewire. 200a panel and service upgrade.City of Cleveland · 2026$52,680
200a panel and service upgrade. Install circuits to various areas of the home and install a receptacle at each location - 5 total.City of Cleveland · 2026$10,850
SERVICE UPGRAGE ONLY:
Quadplex service replacement, refeed the main electric panels. Adding new meter bases and service at new location on property. Customer transitioning from CPP to FirstEnergy. FirstEnergy DR#s: 775 519 064, 775 519 078, 775 519 080, 775 519 079City of Cleveland · 2026$13,500
Install (1) 60a feed from the main panel to the detached garage - aerial feed. Install a 60amp sub-panel in the garage. Connect the existing garage wiring to the sub-panel. We are not adding to or redoing any of the existing wiring in the garage.City of Cleveland · 2026$2,650
Permitted projects on public record. Addresses are omitted for privacy.