What the public permit record shows, not self-reported reviews.
Is CCC CAPITAL LP a real contractor?
CCC CAPITAL LP appears in public building-permit records with 6 permits filed through 2023 in and around City of Cleveland, OH. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is CCC CAPITAL LP's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to CCC CAPITAL LP by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is CCC CAPITAL LP licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. CCC CAPITAL LP has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is CCC CAPITAL LP's work?
The most recent permit on record for CCC CAPITAL LP is dated 2023-07-18, with 6 permits on file in total.
Install three non-illuminated free standing signs per plans and per City Planning approval.City of Cleveland · 2023$21,650
INSTALL EPDM ROOFING MEMBRANE OVER EXISTING METAL QUONSET HUT. INSTALL PER MANUFACTURER'S INSTRUCTIONS. NO CHANGE IN USE OR OCCUPANCY.City of Cleveland · 2017$22,000
SPECIAL INSPECTIONS:
ADDITION AND ALTERATIONS TO STEPSTONE ACADEMY PER APPROVED DRAWINGS. SEPARATE PERMITS REQUIRED FOR PLUMBING, HVAC, AND ELECTRICAL. SUBMIT FIRE ALARM DRAWINGS TO FIRE PREVENTION BUREAU FOR APPROVAL. SUBMIT KITCHEN DRAWINGS AND KITCHEN EQUIPMENT DETAILS TO HEALTH DEPARTMENT FOR APPROVAL. CERTIFICATE OF OCCUPANCY IS REQUIRED. MAINTAIN EXITS AND ALARM SYSTEM DURING CONSTRUCTION.City of Cleveland · 2017$560,000
8810 SF ADDITION OF 6 CLASSROOMS, STORAGE, TOILET ROOMS AND LAUNDRY AREA ON EXISTING SCHOOL FACILITY. 16 SPACE PARKING LOT WITH 2 H.C. SPACES. SPECIAL INSPECTIONS REQUIRED. ALL WORK PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR PLUMBING, HVAC, ELECTRICAL, SPRINKLER AND CURB CUTS. CERTIFICATE OF OCCUPANCY IS REQUIRED. APPROVAL OF FIRE SUPPRESSION AND ALARM SYSTEMS ARE A REQUIREMENT OF OCCUPANCY.City of Cleveland · 2016$380,000
MAKE INTERIOR ALTERATIONS PER APPROVED PLANS. SEPARATE PLUMBING, HVAC AND ELECTRICAL PERMITS REQUIRED. SUBMIT SEPARATE PLANS TO FPB FOR FIRE PROTECTION SYSTEMS. CERTIFICATE OF OCCUPANCY REQUIRED.City of Cleveland · 2015$100,000
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you CCC CAPITAL LP?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
INTERIOR ALTERATIONS PER APPROVED PLANS TO 2 STORY NONCOMBUSTIBLE BLDG 8,850 S.F. FOOTPRINT FOR ADULT EDUCATION. NO STRUCTURAL CHANGES. SEPARATE PERMITS REQ'D FOR PLUMBING, H.V.A.C. & ELECTRICAL. SEPARATE APPLICATION TO FIRE PREV. BUR. REQ'D FOR FIRE PROTECTION SYSTEMS. CERTIFICATE OF OCCUPANCY REQ'D.City of Cleveland · 2015$125,000
Permitted projects on public record. Addresses are omitted for privacy.