RAZE 1.5 STORY FRAME 1 DU TO CORRECT COND DATED. REMOVE ALL DEBRIS FROM SITE. FILL EXCAVATION TO GRADE. CONTROL DUST PER 277.07 SEED LOT. REMOVE ALL FOUNDATIONS. DISCONTINUE AND CAP UTILITY CONNECTIONSCity of Cleveland · 2026$14,575
RAZE 2.5 STORY 2 D/U AND GARAGE TO CORRECT CONDEMN REMOVE DEBRIS FILL EXCAVATION TO GRADE CONTROL DUST SEED LOT REMOVE ALL FOUNDATIONS DISCONTINUE AND CAP ALL UTILITIESCity of Cleveland · 2025$25,885
RAZE 2 STORY 2 D/U TO CORRECT CONDEMN FILL EXCAVATION TO GRADE CONTROL DUST SEED LOT DISCONNECT ALL UTILITY CONNECTIONS.REMOVE ALL DEBRISCity of Cleveland · 2025$17,385
RAZE 2.5 STORY 2 D/U TO CORRECT CONDEMN. REMOVE ALL DEBRIS FILL EXCAVATION TO GRADE CONTROL DUST SEED LOT REMOVE ALL FOUNDATIONS DISCONTINUE AND CAP UTILITY CONNECTIONS.City of Cleveland · 2024$18,000
RAZE 1 STORY FRAME 1 D/U TO CORRECT COND. REMOVE ALL DEBRIS. FILL EXCAVATION TO GRADE. CONTROL DUST SEED LOT REMOVE ALL FOUNDATIONS. DISCONTINUE AND CAP ALL UTILITIES.City of Cleveland · 2024$15,500
RAZE 1.5 STORY FRAME 1 DU. REMOVE ALL DEBRIS FROM SITE. FILL EXCAVATION TO GRADE. CONTROL DUST PER 277.07 SEED LOT. REMOVE ALL FOUNDATIONS. DISCONTINUE AND CAP UTILITY CONNECTIONS
Demolition and clean-up of a fire damaged house.
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Cleveland · 2022
$9,857
WreckingCity of Cincinnati · 2022$23,500
RAZE 2 STORY FRAME 2 DU AND GARAGE. REMOVE ALL DEBRIS FROM SITE. FILL EXCAVATION TO GRADE. CONTROL DUST PER 277.07. SEED LOT AND REMOVE ALL FOUNDATION. DISCONTINUE AND CAP UTILITY CONNECTIONSCity of Cleveland · 2022$17,375
RAZE 2 STORY FRAME 1 DU AND GARAGE REMOVE ALL DEBRIS FROM SITE. FILL EXCAVATION TO GRADE. CONTROL DUST PER 277.07. SEED LOT AND REMOVE ALL FOUNDATION. DISCONTINUE AND CAP UTILITY CONNECTIONSCity of Cleveland · 2021$12,875
RAZE 1 STORY FRAME 1 DU AND GARAGE REMOVE ALL DEBRIS FROM SITE. FILL EXCAVATION TO GRADE. CONTROL DUST PER 277.07. SEED LOT AND REMOVE ALL FOUNDATION. DISCONTINUE AND CAP UTILITY CONNECTIONSCity of Cleveland · 2020$10,000
RAZE 2 1/2 STORY FRAME 2 DU. REMOVE ALL DEBRIS FROM SITE. FILL EXCAVATION TO GRADE. CONTROL DUST PER 277.07. SEED LOT AND REMOVE ALL FOUNDATION. DISCONTINUE AND CAP UTILITY CONNECTIONSCity of Cleveland · 2020$8,575
RAZE 1 STORY STRUCTURE PER CLEVELAND BUILDING CODE CHAPTER 3115, BULKHEAD SEWERS PER WTATER POLLUTION CONTROL.
CONSTROL DUST PER ORD 277.07. REMOVE ALL FOUNDATIONS, DISCONTINUE AND CAP ALL UTILITY CONNECTIONS, HAUL AWAY ALL DEBRIS. BACKFILL WITH CLEAN FILL. COMPLY WITH ALL STATE AND FEDERAL ASBESTOS RULES AND STORM WATER REGULATIONS.
SLAB & FOOTINGS WILL BE REMOVED PER APPLICANT.City of Cleveland · 2016$12,500
Permitted projects on public record. Addresses are omitted for privacy.