What the public permit record shows, not self-reported reviews.
Is ABC PIPING CO. a real contractor?
ABC PIPING CO. appears in public building-permit records with 12 permits filed through 2024 in and around City of Cleveland, OH. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is ABC PIPING CO.'s track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to ABC PIPING CO. by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is ABC PIPING CO. licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. ABC PIPING CO. has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is ABC PIPING CO.'s work?
The most recent permit on record for ABC PIPING CO. is dated 2024-05-17, with 12 permits on file in total.
2 FURNACE, 2 DUCT HTR, 1 ERV; INSTALLED COST OF DUCTWORK SUPPLY/RETURN/EXH AIR $60,000; 1 REFRIGERATION SYSTEM TYPE R410 CAPACITY 4 TONS. BUILDING PERMIT NO. B24004307. OFFICE ADDITIONCity of Cleveland · 2024$100,000
2 NEW CHILLER REPLACEMENT 250 TONS. BUILDING PERMIT NO. B22005052.City of Cleveland · 2022$300,000
INTERIOR ALTERATION BUILDING 101 - INSTALL WATER COOLED CHILLERS PER APPROVED PLANS. PERMITS REQUIRED FOR HVAC AND ELECTRICAL.City of Cleveland · 2022$400,000
150 LIN FT FUEL GAS PIPING
BUILDING PERMIT NO. B20013925City of Cleveland · 2021$15,000
3 URINALS, 4 LAVATORY SINK, 3 SINK, 1 HOT WATER HEATER, 100 LIN FT DRAIN,WASTE, VENT PIPING, 400 LIN FT WATER DISTRIBUTION PIPING
BUILDING PERMIT NO. B20013925City of Cleveland · 2021$15,000
450 LIN.FT. FUEL GAS PIPING. BUILDING PERMIT NO. B17035596.City of Cleveland · 2020$6,000
NEW ELEVATOR SHED PER APPROVED PLANS. SEPARATE ELECTRICAL PERMIT REQUIRED. PROCESS EQUIPMENT EXEMPT PER OHIO BUILDING CODE. ALL OTHER INSTALLATION SUBJECT TOCOMPLIANCE WITH OHIO BUILDING CODE, NEC, AND CITY OF CLEVELAND ORDINANCES. NO OCCUPANCY PERMIT IS REQUIRED.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you ABC PIPING CO.?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Cleveland · 2019
$38,000
5 WATER CLOSET/TOILET, 2 URINAL, 2 LAVATORY SINK, 2 SINK, 2 FLOOR DRAIN, 1 HOT WATER HEATER; 90 LIN.FT. DRAIN, WASTE, VENT PIPING; 215 LIN.FT. STORM AND/OR SAN SEWER; 90 LIN. FT. WATER DISTRIBUTION PIPING. BUILDING PERMIT NO. B17035596.City of Cleveland · 2019$19,000
MAKE ALTERATIONS TO EASTERLY WASTEWATER TREATMENT PLANT GREASE HANDLING FACILITY PER APPROVED PLANS. SEPARATE PLUMBING, HVAC AND ELECTRICAL PERMITS REQUIRED.City of Cleveland · 2018$1,969,500
4 WATER CLOSET/TOILET, 2 URINALS, 4 LAVATORY SINK, 6 SINK, 1 DRINKING FOUNTAIN, 100 LIN FT WATER DISTRIBUTION PIPING.
BUILDING PERMIT NO. B17011420City of Cleveland · 2018$20,000
500 LIN.FT. FUEL GAS PIPING. BUILDING PERMIT NO. B17011420.City of Cleveland · 2018$25,000
INSTALL STEAM/CONDENSOR.City of Cleveland · 2016$13,000
Permitted projects on public record. Addresses are omitted for privacy.