Application file to propose cellar as accessory use with 3pc bathroom and laundry area. No change of use or occupancy.NYC - Queens · 2026$26,000
RENOVATION OF EXISTING RESIDENTIAL BUILDING. WORK INCLUDES REMOVAL OF FLOORING, NON LOAD BEARING WALLS. REPAIR AND REPLACE CELLAR BEAM AS SHOWN. PROVIDE NEW FLOORING, NEW FINISHES ON CELLAR AND SECOND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPACYNYC - Bronx · 2026$130,000
RENOVATION OF EXISTING RESIDENTIAL BUILDING. WORK INCLUDES REMOVAL OF FLOORING, NON LOAD BEARING WALLS. REPAIR AND REPLACE CELLAR BEAM AS SHOWN. PROVIDE NEW FLOORING, NEW FINISHES ON CELLAR AND SECOND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPACYNYC - Bronx · 2026$130,000
Proposed interior renovation on exiting Cellar, First & Second floors as per plan. No change in Use, Egress or Lot coverage.NYC - Brooklyn · 2026$140,000
FILING TO ADDRESS DOB VIOLATIONS 101725IMEGNCY19681 AND 101025CCER02CM. PERFORM EMERGENCY TEMPORARY STRUTURAL STABILIZATION OF HOUSE DUE TO ADJOINING BUILDING FIRE. NO CHANGES TO USE, OCCUPANCY, AND EGRESS.NYC - Brooklyn · 2026$9,945
PROPOSED INTERIOR RENOVATION ON EXISTING CELLAR AND FIRST FLOORS AS PER PLAN. NO CHANING IN USE, EGRESS OR LOT COVERAGE.NYC - Queens · 2026
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
$59,500
Application file to propose cellar open space with laundry area and 3pc bathroom (Plumbing application file separate). First floor Repair and replace existing partitions and replace/repair rear windows rear property. No change of use or occupancy.NYC - Queens · 2025$22,000
RENOVATION OF EXISTING RESIDENTIAL BUILDING. WORK INCLUDES REMOVAL OF FLOORING, NON LOAD BEARING WALLS. REPAIR AND REPLACE CELLAR BEAM AS SHOWN. PROVIDE NEW FLOORING, NEW FINISHES ON CELLAR AND SECOND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPACYNYC - Bronx · 2025$130,000
RENOVATION OF EXISTING RESIDENTIAL BUILDING. WORK INCLUDES REMOVAL OF FLOORING, NON LOAD BEARING WALLS. REPAIR AND REPLACE CELLAR BEAM AS SHOWN. PROVIDE NEW FLOORING, NEW FINISHES ON CELLAR AND SECOND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPACYNYC - Bronx · 2025$130,000
Cellar level remove illegal partitions. Plumbing application to be file separate. No change of use or occupancy.NYC - Queens · 2025$16,320
FILING TO ADDRESS DOB VIOLATIONS 101725IMEGNCY19681 AND 101025CCER02CM. PERFORM EMERGENCY TEMPORARY STRUTURAL STABILIZATION OF HOUSE DUE TO ADJOINING BUILDING FIRE. NO CHANGES TO USE, OCCUPANCY, AND EGRESS.NYC - Brooklyn · 2025$9,945
Application file to remove illegal non-bearing partitions at cellar level. Plumbing application file separate. No change of use or occupancy.NYC - Queens · 2025$22,000
Permitted projects on public record. Addresses are omitted for privacy.