MECHANICAL SYSTEMS WORK ON THE 32ND & 33RD MARKETING FLOOR (31ST & 32ND CONSTRUCTION FLOOR) AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.NYC - Manhattan · 2026$100,000
Mechanical work on the 31st floor construction (32nd floor marketing) core bathrooms as indicated on drawings.NYC - Manhattan · 2026$22,999
INTERIOR RENOVATION OF THE 32ND & 33RD MARKETING FLOOR/31ST & 32ND CONSTRUCTION FLOOR. REMOVAL &INSTALLATION OF WALLS, DOORS, FLOOR FINISHES, AND CEILINGS AS PER PLAN. THE AREA OF WORK IS 3,500 SQFT. NO CHANGE TO USE, EGRESS OR OCCUPANCYNYC - Manhattan · 2026$90,000
Construction work on the 31st floor construction (32nd floor marketing) core bathrooms as indicated on drawings.NYC - Manhattan · 2026$245,000
Mechanical work on the 24th floor construction (25th floor marketing) core bathrooms as indicated on drawings.NYC - Manhattan · 2026$22,999
Structural alterations at the 1st floor for proposed interior floor level modification including built-up concrete slab and relocated stair & ramp; related work as per plans. No proposed change in building use, egress, or occupancy.NYC - Manhattan · 2026$328,150
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
General construction alterations at the 1st floor for proposed interior floor level modification; related work as per plans. No proposed change to building use, egress, or occupancy.NYC - Manhattan · 2026$120,000
5TH FLOOR DEMO-- PRE-TENANT INTERIOR NON-STRUCTURAL DEMOLITION INCLUSIVE OF PARTITIONS REMOVALS AS PER PLANS FILED. No change to use, egress, or occupancy.NYC - Manhattan · 2026$274,337
ERECTION OF CONSTRUCTION FENCES AT CERTAIN LOCATIONS ALONG FIRST FLOOR COMMERCIAL STOREFRONT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.NYC - Manhattan · 2026$1,000
Installation of Partitions, Doors, Suspended Ceiling, Millwork, Wall & Floor Finishes, Pantry, ADA Restroom and Renovate Existing Men's & Women's Restrooms on 32nd Floor. No Change to Occupancy, Use or Egress is ProposedNYC - Manhattan · 2026$450,000
Structural changes for slab infill on the 24th floor construction (25th floor marketing) as indicated on drawings.NYC - Manhattan · 2026$70,000
Install Air Conditioning & Transfer Air Ducts & Grilles, Volume Dampers, Supply Air Diffusers, Return Air Grilles, Exhaust Fans & Ducts & Replace Insulation on Existing H.P. Duct on 32nd Floor, Replace Roof-Top A/C Unit, Curb & Associated Ducts on RoofNYC - Manhattan · 2026$115,000
Permitted projects on public record. Addresses are omitted for privacy.