What the public permit record shows, not self-reported reviews.
Is Metro Contracting NY Inc a real contractor?
Metro Contracting NY Inc appears in public building-permit records with 150 permits filed through 2026 in and around NYC - Manhattan, NY. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is Metro Contracting NY Inc's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to Metro Contracting NY Inc by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is Metro Contracting NY Inc licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. Metro Contracting NY Inc has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is Metro Contracting NY Inc's work?
The most recent permit on record for Metro Contracting NY Inc is dated 2026-01-30, with 150 permits on file in total.
Recent permitted projects
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.NYC - Brooklyn · 2026$1,000
INSTALLATION OF SIDEWALK SHED FOR PROTECTION OF PUBLIC FROM AREAS OF EXPOSURE DURING CONSTRUCTION WORK FOR SITE. FOR EMERGENCY INSTALLATION TO ADDRESS VIOLATION 110624FEU20602PN.NYC - Bronx · 2026$10,000
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.NYC - Brooklyn · 2025$1,000
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.NYC - Manhattan · 2025$1,000
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.NYC - Brooklyn · 2025$1,000
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you Metro Contracting NY Inc?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to Metro Contracting NY Inc's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
NYC - Brooklyn · 2025
$1,000
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.NYC - Brooklyn · 2025$1,000
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.NYC - Brooklyn · 2025$1,000
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300 PSFNYC - Brooklyn · 2025$1,000
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.NYC - Brooklyn · 2025$1,000
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.NYC - Brooklyn · 2025$1,000
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.NYC - Queens · 2025$1,000
Permitted projects on public record. Addresses are omitted for privacy.