Int renovation of non-load bearing partitions, minor framing work, window replacement, new steel stair, new millwork, new fixtures and finishes throughout. No change to egress occupancy or use. M01018772-P1 includes layout revision at lower levelNYC - Manhattan · 2026$480,000
Herewith filing alterations to an existing commercial space, as per plans submitted. There is no change to use, egress or occupancy.NYC - Brooklyn · 2025$67,400
Subsequent filing for minor interior framing work for new steel mezzanine stairs and structural reinforcement of existing steel window openings @ N FAcade. All work to be performed from the interior of the apartment. No change to egress, occupancy or usNYC - Manhattan · 2025$75,500
Int renovation of non-load bearing partitions, minor framing work, window replacement, new steel stair, new millwork, new fixtures and finishes throughout. No change to egress occupancy or use. M01018772-P1 includes layout revision at lower levelNYC - Manhattan · 2025$480,000
Subsequent filing to modify mechanical system in apt # 701/702 on 007 floor. Exterior work to install Condenser unit on exterior wall.NYC - Manhattan · 2025$91,000
Herewith filing for the installation of an HVAC system and related piping, as per plans submitted.
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
NYC - Brooklyn · 2025
$50,000
Subsequent filing for minor interior framing work for new steel mezzanine stairs and structural reinforcement of existing steel window openings @ N FAcade. All work to be performed from the interior of the apartment. No change to egress, occupancy or usNYC - Manhattan · 2025$75,500
Subsequent filing to modify mechanical system in apt # 701/702 on 007 floor. Exterior work to install Condenser unit on exterior wall.NYC - Manhattan · 2025$91,000
Herewith filing alterations to an existing commercial space, as per plans submitted. There is no change to use, egress or occupancy.NYC - Brooklyn · 2025$67,400
Int renovation of non-load bearing partitions, minor framing work, window replacement, new steel stair, new millwork, new fixtures and finishes throughout. No change to egress occupancy or use. M01018772-P1 includes layout revision at lower levelNYC - Manhattan · 2025$480,000
Herewith filing for the installation of an HVAC system and related piping, as per plans submitted.NYC - Brooklyn · 2025$50,000
Herewith filing minor structural work, as per plans submitted.NYC - Brooklyn · 2025$48,000
Permitted projects on public record. Addresses are omitted for privacy.