What the public permit record shows, not self-reported reviews.
Is EDI CONSTRUCTION INC a real contractor?
EDI CONSTRUCTION INC appears in public building-permit records with 14 permits filed through 2026 in and around NYC - Manhattan, NY. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is EDI CONSTRUCTION INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to EDI CONSTRUCTION INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is EDI CONSTRUCTION INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. EDI CONSTRUCTION INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is EDI CONSTRUCTION INC's work?
The most recent permit on record for EDI CONSTRUCTION INC is dated 2026-04-02, with 14 permits on file in total.
INTERIOR RENOVATION AS PER PLANS: MINOR PARTITIONS. PLUMBING FILED AS SUBSEQUENT TO OT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.NYC - Manhattan · 2026$99,996
Full int. renov @apt 2B; floor leveling only @apt 2C: LR, BR1, BR4, Hall 1; apt 2D, 6A, 6D floor leveling per plans, @1st fl comm space #2 (ceiling repairs associated with ST work). No change in use, bulk, egress or occupancy under this application.NYC - Manhattan · 2026$175,918
COMBINATION OF APARTMENTS 2A & 2B ON THE 2nd FLOOR INTO ONE APARTMENT AS PER TPPN 3-97. SCOPE OF WORKS AS SHOWN IN PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE.NYC - Manhattan · 2025$100,000
Full int. renov @apt 2B; floor leveling only @apt 2C: LR, BR1, BR4, Hall 1; apt 2D, 6A, 6D floor leveling per plans, @1st fl comm space #2 (ceiling repairs associated with ST work). No change in use, bulk, egress or occupancy under this application.NYC - Manhattan · 2025$175,918
Interior renovation of apartment 1D on 001 floor. General construction work includes interior partitions, finishes, doors, and cabinetry. Mechanical work includes installation of electric split unit heat pump. No change in use, egress, or occupancy.NYC - Manhattan · 2025$140,000
Interior renovation of apartment 1D on 001 floor. General construction work includes interior partitions, finishes, doors, and cabinetry. Mechanical work includes installation of electric split unit heat pump. No change in use, egress, or occupancy.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you EDI CONSTRUCTION INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to EDI CONSTRUCTION INC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
NYC - Manhattan · 2025
$140,000
Full int. renov @apt 2B; floor leveling only @apt 2C: LR, BR1, BR4, Hall 1; apt 2D, 6A, 6D floor leveling per plans, @1st fl comm space #2 (ceiling repairs associated with ST work). No change in use, bulk, egress or occupancy under this application.NYC - Manhattan · 2025$175,918
Install new steel beam at 2nd fl framing (2nd fl floor/1st fl ceiling assembly) to support exst'g wood joists @midspan. As req'd sister 2nd fl wood joists for repair and leveling. No change of use, egress, bulk or occupancy under this application.NYC - Manhattan · 2025$11,000
Interior renovation of apartment 1D on 001 floor. General construction work includes interior partitions, finishes, doors, and cabinetry. Mechanical work includes installation of electric split unit heat pump. No change in use, egress, or occupancy.NYC - Manhattan · 2025$140,000
Interior renovation of apartment 1D on 001 floor. General construction work includes interior partitions, finishes, doors, and cabinetry. Mechanical work includes installation of electric split unit heat pump. No change in use, egress, or occupancy.NYC - Manhattan · 2025$140,000
Interior renovation of apartment 1D on 001 floor. General construction work includes interior partitions, finishes, doors, and cabinetry. Mechanical work includes installation of electric split unit heat pump. No change in use, egress, or occupancy.NYC - Manhattan · 2024$140,000
Interior renovation of apartment 1D on 001 floor. General construction work includes interior partitions, finishes, doors, and cabinetry. Mechanical work includes installation of electric split unit heat pump. No change in use, egress, or occupancy.NYC - Manhattan · 2024$140,000
Permitted projects on public record. Addresses are omitted for privacy.